April 1, 2025 Edward Casulli Site Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3795 Fax 570.542.1504 Edward.Casulli@TalenEnergy.com TALEN~
ENERGY 10 CFR 50.54 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEAR PROPERTY INSURANCE PROGRAM PLA-8159 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite property damage insurance for Susquehanna Steam Electric Station. The following insurance coverage was obtained through Nuclear Electric Insurance Limited (NEIL).
NEIL - Property and Decontamination Liability Policy # P25-114
$2 Billion1 Insurance Policy There are no new or revised regulatory commitments contained in this submittal.
Should you have any questions regarding this submittal, please contact Ms. Melisa Krick, Manager-Nuclear Regulatory Affairs, at (570) 542-1818.
E. Casulli Copy: