PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)
| ML24205A172 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 07/23/2024 |
| From: | Casulli E Susquehanna, Talen Energy |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| PLA-8117 | |
| Download: ML24205A172 (1) | |
Text
July 23, 2024 Edward Casulli Site Vice President U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3795 Fax 570.542.1504 Edward.Casulli@TalenEnergy.com SUSQUEHANNA STEAM ELECTRIC STATION UNIT 1 23RD REFUELING OUTAGE OWNER'S ACTIVITY REPORT PLA-8117 TALEN~
ENERGY 10 CFR 50.55a Docket No. 50-387 In accordance with the requirements of the American Society of Mechanical Engineers (ASME) Code Case N-532-5, attached is the Owner's Activity Report (Form OAR-I) for the Susquehanna Steam Electric Station (SSES) Unit 1 23rd refueling and inspection outage (Ul23RIO). This report is for the second refueling outage of the third period of the fourth inspection interval.
There are no new or revised regulatory commitments associated with this submittal.
Should you have any questions regarding this submittal, please contact Ms. Melisa Krick, Manager-Nuclear Regulatory Affairs, at (570) 542-1818.
E. Casulli
Attachment:
Owner's Activity Report for SSES Ul23RIO Copy:
NRC Region I Ms. A. Klett, NRC Project Manager Ms. J. England, NRC Senior Resident Inspector Mr. M. Shields, PA DEP/BRP
Attachment to PLA-8117 Owner's Activity Report for SSES U123RIO
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number.,,Oc...A,._R,_-1.._,-'-'-.11...,0"""* ----------------------------------
Plant SusquehannaSteamElecfricStation, 769 Salem Blvd., Berwick. PA 18603 Unit No.~1 _______ Commercial service date..,J""u""'n.,,_e-=8"-'-'19""'8,_,3,__ ___ _
Refueling outage nQ, "'23,.__ _____ _
{,:f ~pp!icable)
Current inspection interval~4=lh~---------------,---,---,---,---,--,----------------
t1,i, 2nd, 31!1, 4111, othelJ Curren! inspection period~3~rd--------------------,-(1.,..st.,....2nil-. -.,...:lro)-----------------
Editlon a11d AddE1nda of Section XI applicable to the inspection plans 2007 Edition through 2008 Addenda Date and revision ofinspect1on plans~R=e~vi=s=io~n~6~7~/~14-'-'f=20=2=2~-,--------------,-----------~
. Edition and Addencl.a of SecUon XI applicable to repair/replacement actiyitfes, If differentthan the inspection plans ~Nl~'A~* ____ _
Code Cases used for inspection and evaiuatiom...,N...,-5""'1""'3"""'-4,.,_* """N'--'*5,.,3,.,2_,*5:;.,_
- ...,N'--'-66=-<-1_,-3~Nw-7'-'1"'6""'
01,__ ____ --'-'-_________ _
.{If~,~ cas,s mo*!l!ied l,J case IH32 "1!d later ~*)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in U1is report are corr~ct; (I:>) the e;,<aminations and tE/stsmeet the Inspection Planas required by the.
ASME Code, SE'iction :XI; and (c) the repair/replacement actrvitles and evaluaUon.s supporting tlie completion of.,,U__,_12=3=R=l=O ____ _
CERTIFiCATE OF INSERVICE INSPECTION (reiuet,ng~~
I; the undersigned, holding a valid commission issued by the National Board of Boller and Pressure Vessel Inspectors and employed by Bureau Veritas Inspection :and Insurance Co. of Lynn. MA have Inspected the /(ems described' In this Owners ActMty *Report, and state thiil, to the best ofmy knowledge and belief. the Oi'mer has performed al.I actMUes represented by this report In accordance With the requirements ofSecllon )(L By slgnthg this certificate neither the Inspector Mr his employer makes any warranty, expiessed or implied, C()ncE'i.rning the repalrfrepla~menl activlUes and evaiualion described In this report. furth£1rmore, neither the Inspector nor his employer shaU be Hable in any mannedor arty. persOnaf injury Or prilperly damage Or a loss of any kl11d arising from or connect.ad with th Ts Inspection, Dale _____,,51""""/j'-"2=-* 1-/=2"'-0-=2=-~=* ~-
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Item Description Evaluation Description Category and Item Number None None None TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan* Number Class 3 HRC-101 Piping Replace HRC-i01 02/2.1/2024 23-154*2632833*1 °041 Replacement piping downstream of valve 111103 Class 3 HRC-106 Piping Replace HRC-106 02/21/2024 23-054-2676902-0-069 Replacement piping upstream of valve 111187 C!ass3 HRC-201 Piping Replace HRC-201 02/21/2024 23-254-2682230-0-087 Replacement piping that is below reauired thickness