PLA-7636, Submittal of Revision 68 to Final Safety Analysis Report and Revision 22 to Fire Protection Review Report

From kanterella
(Redirected from PLA-7636)
Jump to navigation Jump to search
Submittal of Revision 68 to Final Safety Analysis Report and Revision 22 to Fire Protection Review Report
ML17289A216
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/16/2017
From: Berryman B
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7636
Download: ML17289A216 (9)


Text

Brad Berryman Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Brad.Berryman@TalenEnergy.com TALEN~

ENERGY U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.71(e) 10 CFR 50.4 SUSQUEHANNA STEAM ELECTRIC STATION SUBMITTAL OF FINAL SAFETY ANALYSIS REPORT REVISION 68 AND FIRE PROTECTION REVIEW REPORT REVISION 22 PLA-7636 Docket No. 50-387 50-388

Reference:

SSES Letter, PLA-7373, "Susquehanna Steam Electric Station Submittal of Final Safety Analysis Report Revision 67 and Fire Protection Review Report Revision 21," dated, September 21, 2015.

In accordance with 10 CFR 50.71(e) and 10 CFR 50.4, attached is Revision 68 of the Susquehanna Steam Electric Station (SSES) Final Safety Analysis Report (FSAR) and Revision 22 of the SSES Fire Protection Review Report (FPRR).

The FSAR, Revision 68 and FPRR, Revision 22 are being submitted on CD (enclosed).

Each CD contains a complete copy of the updated associated document previously provided under Reference 1, including referenced SSES drawings.

Should you have any questions regarding this submittal, please contact Mr. Jason Jennings, Manager-Nuclear Regulatory Affairs at (570) 542-3155.

This letter contains no new regulatory commitments.

B. Berryman : Summary of Changes to Revision 68 of the Susquehanna Steam Electric Station (SSES) Final Safety Analysis Report (FSAR) : Summary of Changes to Revision 22 of the Susquehanna Steam Electric Station (SSES) Fire Protection Review Report (FPRR) : Two (2) CDs - One (1) FSAR Rev. 68, One (1) FPRR Rev. 22 fa b /) (p tJ{(f..

Copy:

NRC Region I Ms. T. E. Hood, NRC Project Manager Ms. L. H. Micewski, NRC Sr. Resident Inspector Mr. M. Shields, PA DEP/BRP Document Control Desk PLA-7636

[ __________________________________________ _ to PLA-7636 Summary of Changes to Revision 68 of the Susquehanna Steam Electric Station (SSES)

Final Safety Analysis Report (FSAR)

LDCN 4554 5060 5172 5208 5212 5217 5223 5224 5229 5233 5244 5246 Summary of Changes to Revision 68 of the Susquehanna Steam Electric Station (SSES)

Final Safety Analysis Report (FSAR)

Affected Section(s)

Title TABLE 11.5-1; TABLE 11.5-2; TABLE 3.2-1; VERMS Installation Final Configuration TABLE 8.1-2; TABLE 8.3-1; TABLE 8.3-lA; TABLE 8.3-lC; TABLE 8.3-2; TABLE 8.3-2A; TABLE 8.3-3; TABLE 8.3-3A; TABLE 8.3-4; TABLE 8.3-4A; TABLE 8.3-5; TABLE 8.3-5A; TEXT 11.5; TEXT 18.1; TEXT 9.4 TEXT3.9 Residual Heat Removal Pump Motor Replacement (1PM202A)

FIGURE 13.1-1; FIGURE 13.1-2; Talen Energy Transfer and Susquehanna FIGURE 13.1-3; FIGURE 17.2-2; Review Committee Name Change FIGURE 17.2-3; FIGURE 17.2-4; TEXT 13.1; TEXT 13.4; TEXT 17.2; TOC 13.0; TOC 17.0 TABLE 5.4-4; TABLE 6.3-10; TABLE 6.3-9; Ensure Positive Seating of Residual Heat TEXT 5.4; TEXT 6.2 Removal Injection Check Valves HV151F050A & HV151F050B (Unit 1)

TEXT3.7B Revise FSAR Section 3. 7B TEXT9.2 Residual Heat Removal Service Water for Unit 1 Extended Loss of AC Power TEXT 8.1; TEXT 8.2 Incorporate Changes To Switchyard Facilities Resulting From PPL EU Switchyard Upgrades FIGURE 12.5-1 Revision to Figure 12.5-1 TEXT 3.13 Correction to RG 1.97 Discussion In Section 3.13 TABLE 8.1-2, TABLE 8.3-lA, TABLE 8.3-lC, Reliable Hardened Containment Vent ROS TABLE 8.3-2, TABLE 8.3-2A, TABLE 8.3-3, Modification TABLE 8.3-3A, TABLE 8.3-4, TABLE 8.3-5, TABLE 8.3-5A, TEXT 8.3 FIGURE 6.2-44M; TABLE 6.2-12; Reliable Hardened Containment Vent Unit 2 TABLE 6.2-15; TABLE 6.2-22; TEXT 6.2 Final Piping Tie-In Modification FIGURE 7.7-13A Correct FSAR Figure 7.7-13A By Removing Obsolete Information

LDCN Affected Section(s)

Title 5268 TABLE 6.5-2; TEXT 3.13 Revise Ventilation System Surveillance Requirements to Operate For 10 Hours Per Month 5275 FIGURE 17.2-4; TEXT 13.1; TEXT 17.2 Cost Reduction Organizational Changes

. Reassignment of Radiological Waste Inspection Responsibility 5295 TEXT 1.2; TEXT 3.1; TEXT 3.13; TEXT 3.2; Change to Design Basis Hydrogen Generation TEXT 6.2; TEXT 7.3; TEXT 7.6; TABLE 6.2-13; TABLE 6.2-16; TABLE 6.1-lB; QUESTION 021.67; TOC 6.0 5300 TEXT 13.2 General Employee Training (GET) Retraining Frequency 53ll 1 TABLE 15.7-13; TABLE 15.7-15; Fuel Handling Accident Analysis Update TABLE 15.7-16; TABLE 15.7-17; TEXT 15.7 5315 TEXT 3.13 Update FSAR Section 3.13 To Reference Technical Requirement Manual & Not Technical Specs 5320 FIGURE 15D.2.2-l-1; FIGURE 15D.2.2-l-2; Update FSAR For Unit 2, Cycle 19 Initial Core FIGURE 15D.2.2-1-3; FIGURE 15D.2.2-1-4; Loading FIGURE 15D.2.2-1-5; FIGURE 4.3-8-43; FIGURE 4.3-8-44; FIGURE 4.3-8-45; FIGURE 4.3-9-108; FIGURE 4.3-9-109; FIGURE 4.3-9-110; FIGURE 4.3-9-111; FIGURE 4.3-9-112; FIGURE 4.3-9-113; FIGURE 4.3-9-114; FIGURE 4.3-9-115; FIGURE 4.3-9-116; FIGURE 4.3-9-117; FIGURE 4.3-9-118; FIGURE 4.3-9-119; FIGURE 4.3-9-120; FIGURE 4.3-9-121; FIGURE 4.3-9-122; TABLE 15D.0-1; TABLE 15D.0-2; TABLE 15D.0-3; TABLE 15D.0-5; TABLE 15D.l.2-1; TABLE 15D.2.2-1; TABLE 15D.4.7-1; TABLE 15D.4.9-2; TABLE 4.3-3; TABLE 4.3-6; TABLE 4.3-7; TABLE 5.2-9; TEXT 5.2; TOC 15.0

LDCN Affected Section(s)

Title 5321 FIGURE 15C.l.2-1-1; FIGURE 15C.l.2-1-2; Update FSAR For Unit 1, Cycle 20 Initial Core FIGURE 15C.l.2-1-3; FIGURE 15C.l.2-l-4; Loading FIGURE 15C.l.2-l-5; FIGURE 15C.2.2-1-1; FIGURE 15C.2.2-1-2; FIGURE 15C.2.2-l-3; FIGURE 15C.2.2-1-4; FIGURE 15C.2.2-1-5; FIGURE 4.2-15; FIGURE 4.2-15A; FIGURE 4.2-15B; FIGURE 4.2-15C; FIGURE 4.2-18-3; FIGURE 4.2-23; FIGURE 4.3-1; FIGURE 4.3-8-39; FIGURE 4.3-8-40; FIGURE 4.3-8-40A; FIGURE 4.3-8-41; FIGURE 4.3-8-42; FIGURE 4.3-9-104; FIGURE 4.3-9-105; FIGURE 4.3-9-106; FIGURE 4.3-9-107; FIGURE 5.2-13; TABLE 15C.O-l; TABLE 15C.0-2; TABLE 15C.0-3; TABLE 15C.0-5; TABLE 15C.l.2-1; TABLE 15C.2.2-1; TABLE 15C.4.9-2; TABLE 4.3-2; TEXT 4.1; TEXT 4.2; TEXT 4.3; TOC 4.0 5328 TEXT 9.1 Implement License Renewal Commitment Item No 61 For Boral Coupon Testing to PLA-7636 Summary of Changes to Revision 22 of the Susquehanna Steam Electric Station (SSES)

Fire Protection Review Report (FPRR)

~---------------------------------------------

LDCN 5133 5221 5245 5252 5306 Summary of Changes to Revision 22 of the Susquehanna Steam Electric Station (SSES)

Fire Protection Review Report (FPRR)

Affected Section(s)

Title TABLE 5.0-1; TEXT 4.1 Fire Pump Replacement Project TEXT 4.12 Replace Simplex 2120 Fire Protection System with a New 4100 System & Establish a Style 7 Loop TABLE 5.0-1 NFPA 72d Noncompliance Documented in FPRR Table 5.0-1, Section E.l TEXT6.2 Fire Protection Change to Support EC 1913 71 7-Smoke Detectors to Heat Detectors (Unit 1)

TEXT 1.4 General Employee Training (GET) Retraining Frequency

I I


to PLA-7636 Two (2) CDs - 011le (1) FSAR Rev. 68, One (1) FPRR Rev. 22