JUN 0 9 ;2017 Brad Berryman Site Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Brad.Berryman@TalenEnergy.com SUSQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF A DEVIATION UNIT 1 LICENSE NO. NPF-14 UNIT 2 LICENSE NO. NPF-22 PLA-7613 TALEN~
ENERGY 10 CFR 21.21(a)(2)
Docket No. 50-387 50-388 Pursuant to 10 CFR 21.21(a)(2), Susquehanna Nuclear, LLC hereby submits this interim report. The deviation to be evaluated is a failure of an Eaton/Cutler Hammer A200 series starter manufactured in 2014. The starter failed with its contacts stuck in the energized state when it was de-energized. The sticking was caused by the pole faces of the coil laminations and those of the armature laminations adhering to one another at normal operating temperatures. The vendor is in the process of performing an investigation of the failure.
Evaluation of the failure is expected to be completed by July 14, 2017.
This letter contains no new regulatory commitments.
If you have any questions or require additional information, please contact Mr. Jason Jennings, Manager of Nuclear Regulatory Affairs, at (570) 542-3155.
s~-
~o-uc.s B. Berryman Copy: NRC Region I Ms. T. E. Hood, NRC Project Manager Ms. L. H. Micewski, NRC Sr. Resident Inspector Mr. M. Shields, PA DEP/BRP