PLA-7608, Th Refueling Outage Owners Activity Report - (PLA-7608)
| ML17180A393 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/29/2017 |
| From: | Berryman B Susquehanna, Talen Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-7608 | |
| Download: ML17180A393 (4) | |
Text
Brad Berryman Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Brad.Berryman@talenenergy.com TALEN~
JUN *2 9 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 18TH REFULEING OUTAGE OWNER'S ACTIVITY REPORT ENERGY PLA-7608 Docket No. 50-388 In accordance with the requirements of American Society of Mechanical Engineers (ASME) Code Case N-532-5, enclosed is the Owner's Activity Report (Form OAR-1),
for the Unit 2 18th refueling outage. This report is for the first refueling outage of the first period of the fourth inspection interval.
By copy of this letter, we are transmitting the Owner's Activity Report to the Commonwealth of Pennsylvania.
There are no new regulatory commitments associated with this submittal.
If you have any questions or require additional information, please contact Mr. Jason Jennings (570) 542-3155.
Sincere(~*~-------..,.
B. Benyman
Enclosure:
Owner's Activity Report, Susquehanna Steam Electric Station, Unit 2, 18th Refueling Outage Copy:
NRC Region I Ms. T. E. Hood, NRC Project Manager Ms. L. Micewski, NRC Sr. Resident Inspector Mr. M. Shields, PA DEP/BRP
Enclosure to PLA-7608 Owner's Activity Report Susquehanna Steam Electric Station, Unit 2 18th Refueling Outage
FORM OAR-1 OWNER'S ACTIVITY REPORT ReportNumber~O~A~R~-1~-=2~07~--------------------------------------------------------------------
Piant Susquehanna Steam Electric Station. 769 Salem Blvd.. Berwick. PA 18603 Unit No.=2 ________ Commercial service date Februarv 12. 1985 Refueling outage no. -'1"'8 _______ _
(if applicable)
Current inspection interval "'4t"'"h'----------------....,-------,-----------------
l1 st. 2nd. 3rd. 4th, other)
Current inspection period..... 1"'-st,__ ____________________________________ _
(1 st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans 2007 Edition through 2008 Addenda Date and revision of inspection plans.!...:R..=e:!.vl-"is~io~n"-'2=......1.w0,!!../><3-"1/"'2"'0C!.1><6 __________________________ _
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans,_,N"'/A_,__ ____ _
Code Cases used for inspection and eva I uation:,N""-5"-1,3,:;-3"-'--'N-"'-"'5""3=.2-"'5"'-!.:N"'-6><-1,3""-.!.1 ______________________________________ _
(if applicable, including cases modified by Case N-532 and tater revisions)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI ; and (c) the repair/replacement activities and evaluations supporting the completion of ~U=.2.!.18""R..,IO"---------
conform to the requirements of Section XI.
(refueling outage number)
Date_--=tPc..,/.__2._""2.-+/-1'7 ________ _
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by OneCIS Insurance Co. of Lynn, MA have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Code Class Class 3 Class 3 None TABLE 1 ITEMS WITH FLAWS OR RELEVANTCONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Item Description Description ofWork Date Completed Repair/Replacement Plan Number 10" HRC-209 Emergency Replace section of 10/5/2016 16-254-199884 7-028 Service Water Piping piping due to through-wall MIC induced leak 4" 2E207B/C Reactor Replace section of 10/5/2016 16-261-2026360-058 Water Cleanup Heat piping due to through-Exchanger Elbow wall FAC induced leak