PLA-7321, Completion of Actions Required by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation PLA-732 1

From kanterella
(Redirected from PLA-7321)
Jump to navigation Jump to search
Completion of Actions Required by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation PLA-732 1
ML15211A378
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/02/2015
From: Rausch T
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15211A375 List:
References
EA-12-051, PLA-7321
Download: ML15211A378 (2)


Text

Security-Related Information - Withhold Under 10 CFR 2.390 President and Chief Nuclear Officer JUL 02 201O5 Susquehanna Nuclear, LLC 769 Salem Boulevard Berwlck, PA 18603 Tel. 570.542.3445 Fax 570.542.1504 Timothy.Rausch@talenenergy.com TALENd' ENERGY U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION COMPLETION OF ACTIONS REQUIRED BY NRC ORDER EA-12-051, "RELIABLE SPENT FUEL POOL INSTRUMENTATION" PLA-732 1 10 CFR 2.202 Docket No. 50-387 and No. 50-388

References:

1. NRC Order Nwnber EA OS1, Order Modify'ing Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012.
2. PPL Letter (PLA -6980,) titled, "Overall Integrated Plan in Response to March 12, 2012 C~ommission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (NRC Order LA OS)), '"dated February 28, 2013.
3. NRC Letter titled, "Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051,) (TAC NOS. MF0890 AND MF089 1), "'dated June 17, 2013.
4. PPL Letter (PLA -7073) "PPL Susquehanna's First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Numlber LA OS51), "datedlAugust 26, 2013.
5. PPL Letter ('PLA-7138,) "'PPL Susquehanna's Second Six-Month Status Report in Response to March 12, 2012 C'omnmission Order Mod~jin]~lg Licenses wsith Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA 051), '"dated February 27, 2014.
6. PPL Letter (PLA-7222) "PPL Susquehanna's Thir'd Six-Month Status Repor~t in Response to March 12, 2012 C'ommission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number LA 051), '" dated August 27, 2014.
7. PPL Letter (PLA-7296,) "'PPL Susquehanna 's Fourth Six-Month Status Report in Response to March 12, 2012 C'omnmission Order Modifying Licenses with Regard To Reliable Spent Fuel Pool Level Instrumentation (NRC Order EA 051,), ""dated February 25, 20)5.

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," to PPL Susquehanna, LLC (now known as Susquehanna Nuclear, LLC). This Order was effective immediately and directed Susquehanna Units 1 and 2 to install reliable spent fuel pool instrumentation as outlined in Attachment 2 of the Order. This letter, along with its I

k Security-Related Information - Withhold Under 10 CFR 2.390 Upon Removal of the Enclosures, this Letter is Decontrolled

/ oo!

Document Control Desk PLA-7321 enclosures, provides the notification required by § IV.C.3 of the Order that full compliance with the requirements described in Attachment 2 of the Order has been achieved for Susquehanna Units 1 and 2.

The enclosures to this letter contain security related information, and Susquehanna Nuclear, LLC requests that these enclosures be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1).

This letter contains no new regulatory commitments.

If you have any questions regarding this report, please contact Mr. Jeffery N. Grisewood, Manager - Nuclear Regulatory Affairs, at (570) 542-1330.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on:

-1(4K President and Chief Nuclear Officer

Enclosures:

1. Compliance with Order EA-12-05 1
2. Responses to NRC Requests for Additional Information
3. Bridging Document Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Mr. J. A. Whited, NRC Project Manager Mr. B. R. Fuller, PA DEP/BRP