i William H. Spence PPL Corporation Executive Vice President and Two North Ninth Street Chief Operating Officer/Chief Nuclear Officer Allentown, PA 18101-1179 Tel. 610.774.3683 Fax 610.774.5019 Tel. 610.774.5151 I
" c Whspence@pplweb.com www.pplweb.com i p PP U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop OP 1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (LRA)
AMENDMENT TO LRA COMMITMENT #55 Docket Nos. 50-387 PLA-6478 and 50-388
References:
"Application for Renewed Operating License Numbers NPF-14 and NPF-22, dated September 13, 2006.
"Request for Additional Information (RAI) for the Review of the Susquehanna Steam Electric Station Units 1 and 2, License Renewal Application (LRA) Sections 4.2.3, 4.2.4, 4.2.5, 4.2.7, and 4.7.3, "dated October 18, 2007.
In accordance with the requirements.,of 10 CFR 50, 51, and 54, PPL requeste*d the renewal of the operating licenses for the Susquehanna Steam Electric Station (SSES)
Units I, and 2 in Reference 1.
The enclosure to this letter provides an amendment to Table A-..of the SSES License Renewal Application (LRA).,. This change revises Commitment #55 to provide adequate time for NRC to review the evaluation as discussed in the response to RAI 4.7.3-1 (Reference 2). This change was discussed during a teleconference on February 9, 2009 between the NRC and PPL.
There are no new, regulatory commitments contained herein. However, License Renewal
'Commitment #55. is revised. as,shown in the enclosure.
If you have any questions, please contact Mr. Duane L. Filchner at (610) 774-7819.
2-Document Control Desk PLA-6478 I declare, under penalty of perjury, that the foregoing is true and correct.
Executed on:
W. H. Spence
Enclosure:
Amendment to SSES License Renewal Application (LRA)
Copy: NRC Region I Ms. E. H. Gettys, NRC Project Manager, License Renewal, Safety Mr. R. Janati, DEP/BRP Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector Mr. A. L. Stuyvenberg, NRC Project Manager, License Renewal, Environmental
Enclosure to PLA-6478 Amendment to SSES License Renewal Application (LRA)
Enclosure to PLA-6478 Page 1 of 1 Table A-i SSES License Renewal Commitments
> The commitment for the SSES Core Plate Hold-Down Bolts in Table A-i, Item 55 is revised by addition (bold italics) and deletion (stri4kedfettgh) as follows:
(Note that the changes made previously in Reference 2 are shown but not highlighted.)
Table A-1 SSES License Renewal Commitments FSAR Supplement Enhancement Item Number Commitment Location or (LRA App. A)
Implementation Schedule
- 55) Core Plate PPL will either: (1) obtain NRC approval of A. 1.3.6.3 Prior to the period of extended operation.
Hold-Down a SSES plant-specific evaluation consistent Bolts with BWRVIP-25 to demonstrate that the core plate rim hold-down bolts will be capable of preventing lateral displacement of the core plate for the period of extended operation (Tthe plant-specific evaluation will be submitted for NRC review no less than 2 years prior to the period of extended operation and will address the inspection strategy for the hold-down bolts); or (2) install core plate wedges to structurally replace lateral load resistance provided by the bolts.