MONTHYEARPLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owners Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owners Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 2024-09-18
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 PLA-7979, Supplement to License Amendment to Revise Reactor Steam Dome Pressure Low Instrumentation Function Allowable Value2021-12-16016 December 2021 Supplement to License Amendment to Revise Reactor Steam Dome Pressure Low Instrumentation Function Allowable Value PLA-7950, Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-7950)2021-10-0505 October 2021 Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-7950) PLA-7897, Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion.2021-04-0808 April 2021 Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion. ML20245E1922020-09-0101 September 2020 Talen Energy - Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements PLA-7880 PLA-7866, Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-78662020-06-25025 June 2020 Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-7866 PLA-7842, Proposed Amendment to Licenses NPF-14 and NPF-22: Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit PLA-72482020-05-26026 May 2020 Proposed Amendment to Licenses NPF-14 and NPF-22: Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit PLA-7248 PLA-7823, Proposed Amendment to Licenses NPF-014 and NPF-022: Revision to the Dose Consequence Analysis for a Loss of Coolant Accident2020-01-0202 January 2020 Proposed Amendment to Licenses NPF-014 and NPF-022: Revision to the Dose Consequence Analysis for a Loss of Coolant Accident PLA-7783, Proposed Amendment to Licenses: Application of Advanced Framatome Methodologies and TSTF-535 PLA-77832019-07-15015 July 2019 Proposed Amendment to Licenses: Application of Advanced Framatome Methodologies and TSTF-535 PLA-7783 PLA-7772, Application to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-28028 March 2019 Application to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. PLA-7751, Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-01-0909 January 2019 Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping PLA-7729, Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-12-0404 December 2018 Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. PLA-7605, Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A2017-05-17017 May 2017 Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A PLA-7528, Supplemental Information for License Amendment Request to Address Secondary Containment Access Openings2016-09-13013 September 2016 Supplemental Information for License Amendment Request to Address Secondary Containment Access Openings PLA-7486, Proposed Amendment Request to Address Secondary Containment Access Openings2016-07-27027 July 2016 Proposed Amendment Request to Address Secondary Containment Access Openings ML16181A4172016-06-29029 June 2016 Projected Income Statement and Calculation of Six-Month Fixed Costs (Redacted) ML16181A4152016-06-29029 June 2016 Request for Order Approving Indirect Transfer of Control - PLA-7500 ML16181A4192016-06-29029 June 2016 Capacity Factor Assumptions (Redacted) PLA-7441, Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-4252016-01-29029 January 2016 Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7384, Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.12016-01-28028 January 2016 Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-7378, Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date2015-08-28028 August 2015 Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date PLA-7360, Supplemental Information to License Amendment Request for Changes in RCS Pressure and Temperature (P/T) Limits2015-07-16016 July 2015 Supplemental Information to License Amendment Request for Changes in RCS Pressure and Temperature (P/T) Limits ML15091A6612015-03-19019 March 2015 Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme NEI 99-01, Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2015-03-19019 March 2015 Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. NEI 99-01, Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme2015-03-19019 March 2015 Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme ML15091A6602015-03-19019 March 2015 Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. PLA-7181, Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits.2014-08-11011 August 2014 Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits. ML14195A1132014-07-11011 July 2014 Enclosure to PLA-7191 Application for Order Approving Indirect Transfer of Control of Facility Operating License Nos. NPF-14 and NPF-22 and Conforming Amendments ML14042A1152014-01-29029 January 2014 License Amendment Request - Increase of the Allowable Gas Treatment System Maximum Flow Rates from Secondary Containment PLA-6977, Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.122013-06-0606 June 2013 Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.12 PLA-6915, Proposed Amendment No. 312 to Unit 1, and Proposed Amendment No. 284 to Unit 2 Low Pressure Safety Limit and Reference Changes2012-12-19019 December 2012 Proposed Amendment No. 312 to Unit 1, and Proposed Amendment No. 284 to Unit 2 Low Pressure Safety Limit and Reference Changes PLA-6825, Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage2012-09-18018 September 2012 Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage PLA-6817, Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-68172012-03-0808 March 2012 Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-6817 ML11152A0092011-07-21021 July 2011 Issuance of Amendment Approval of the PPL Susquehanna, LLC Cyber Security Plan PLA-6695, Amend. Request No. 308 to License NPF-14 & Amend. Request No. 279 to License NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-514, Rev. 3, Revise BWR Operability Requirements & Actions RCS Leakage Instrumentation2011-04-0808 April 2011 Amend. Request No. 308 to License NPF-14 & Amend. Request No. 279 to License NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-514, Rev. 3, Revise BWR Operability Requirements & Actions RCS Leakage Instrumentation PLA-6628, Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan2010-07-22022 July 2010 Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan PLA-6606, Submittal of NRC Notification of NPDES Permit Renewal Application2010-03-26026 March 2010 Submittal of NRC Notification of NPDES Permit Renewal Application PLA-6556, License Renewal Application (LRA) Amendment to LRA Commitment 602009-09-0909 September 2009 License Renewal Application (LRA) Amendment to LRA Commitment #60 PLA-6539, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information2009-07-10010 July 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information PLA-6520, Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b)2009-05-28028 May 2009 Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b) PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications2009-05-12012 May 2009 Supplemental Electrical Information to License Amendment Request on the Technical Specifications PLA-6505, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information2009-04-30030 April 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information PLA-6474, Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-24024 March 2009 Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 PLA-6480, One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-64802009-03-24024 March 2009 One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-6480 2023-06-08
[Table view] |
Text
William H. Spence PPL Corporation Executive Vice President and Two Norhi Ninth Stre.t Chdief Operating Officer/Chief Nuclear Officer Allentown, PA 18101-1179 bib Tel. 610.774.3683 Fax 610.774.5019 Tel. 610.774.5151 Whspence@pplweb.com www.pplweb.cozn P1 P my' 17 2008 U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (LRA)
CHANGE TO AGING MANAGEMENT PROGRAM B.2.30 Docket Nos. 50-387 PLA-6446 and 50-388
References:
- 1) PLA-6110, Mr. B. T. McKinney (PPL)to Document Control Desk (USNRC),
"Applicationfor Renewed OperatingLicense Numbers NPF-14 and NPF-22,"
dated September 13, 2006.
- 2) PLA-6430, Mr. B. T. McKinney (PPL)to Document Control Desk (USNRC),
"Susquehanna Steam Electric Station Units I and 2, License Renewal Application (LRA) Amendments to LRA andRAI Responses," datedSeptember 26, 2008.
In accordance with the requirements of 10 CFR 50, 51, and 54, PPL requested the renewal of the operating licenses for the Susquehanna Steam Electric Station (SSES)
Units 1 and 2 in Reference 1.
The License Renewal process includes an inspection by regional inspectors to verify the applicant's license renewal program is implemented in accordance with the requirements of 10 CFR 54. NRC conducted a regional inspection of the SSES LRA from August 11, 2008 through August 29, 2008.
As a result of the inspection, Aging Management Program (AMP) B.2.30, regarding inspection of buried piping and tanks, is revised. The LRA changes are included in the enclosure.
There are no new regulatory commitments as a result of this LRA amendment. However, License Renewal Commitment #26 is revised as shown in the enclosure.
If you have any questions, please contact Mr. Duane L. Filchner at (610) 774-7819.
dl,ýD
/j/Z19
Document Control Desk PLA-6446 I declare, under penalty of perjury, that the foregoing is true and correct.
Executed on: //"/7" gg<
W. H. Spence
Enclosure:
PPL Response to NRC's Regional Inspection Item B.2.30 Copy: NRC Region I Ms. E. H. Gettys, NRC Project Manager, License Renewal, Safety Mr. R. Janati, DEP/BRP Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector Mr. A. L. Stuyvenberg, NRC Project Manager, License Renewal, Environmental
Enclosure to PLA-6446 PPL Response to NRC's Regional Inspection Item B.2.30
Enclosure to PLA-6446 Page 1 of 4 NRC Inspection Issue Related to AMP B.2.30 - Buried Piping and Tanks Inspection Program The Buried Piping and Tanks Inspection Program is revised:
" to clarify the aging effects applicable to buried steel tanks;
" to clarify that buried tanks are subject to opportunistic inspection;
" to include more specific requirements for inspection locations for focused inspections; and
" to identify inspection methods and sample expansion criteria.
The SSES LRA is amended as follows to address these issues.
B.2 Aging Management Programs B.2.30 Buried Piping and Tanks Inspection Program Aging Management Program Elements
>* LRA Section B.2.30 (LRA pages B-94 and B-95) is revised by addition (bold italics)as follows (Note: Changes to the LRA text, previously submitted in Reference 2, are included but not highlighted):
Scope of Program The scope of the Buried Piping and Tanks Inspection Program includes buried components that are within the scope of license renewal for SSES. The program is credited for managing loss of material due to crevice, general, and pitting corrosion and microbiologically influenced corrosion (MIC) for buried steel and cast iron piping components. In addition, the program is credited with managing loss of material for buried stainless steel piping components. The buried components within the scope of this program are in the Condensate Transfer and Storage System, Cooling Tower System, Diesel Fuel Oil System, Emergency Service Water System, Fire Protection System, Residual Heat Removal Service Water System, and Water Pretreatment System.
The Buried Piping and Tanks Inspection Program is also credited for managing loss of material due to crevice, general, andpittingcorrosion and microbiologically influenced corrosion (MIC) for buried steel tanks in the Diesel Fuel Oil System.
Enclosure to PLA-6446 Page 2 of 4
> LRA Section B.2.30 (LRA page B-95) is revised by addition (bold italics) and deletion (s)riketl'eug as follows:
- Parameters Monitored or Inspected The Integrity of coatings and wrappings for buried components will be visually inspected when piping or tanks are excavated for maintenance or other reasons.
Evidence of damaged wrapping or of coating defects will be documented for further evaluation.
Exterior surfaces of buried stainless steel piping in the Condensate Transfer and Storage System and buried piping in the Fire Protection System will be visually inspected when piping is excavated for maintenance or other reasons. Evidence of corrosion will be documented for further evaluation.
> LRA Section B.2.30 (LRA pages B-95 and B-96) is revised by addition (bold italics) and deletion (striket4eugh) as follows (Note: Changes to the LRA text, previously submitted in Reference 2, are included but not highlighted):
" Detection of Aging Effects Integrity of coatings and wrappings will be inspected when components are excavated for maintenance or other reasons. An inspection of coatedand wrapped buried piping will be performed within the 10-year period prior to entering the period of extended operation (i.e., between year 30 and year 40). If an opportunistic inspection has not occurred between year 30 and year 38, an excavation of a section of buried piping for the purpose of inspection will be performed before year 40. An additional inspection of coated and wrappedburied piping will be performed within 10 years after entering the period of extended operation (i.e., between year 40 and year 50). The inspection location will be established based on evaluation of recent operating experience, and the condition of buried piping as known based on results of internal inspections or other relevant information. , and a risk based evaluation.
The inspections will be conducted using visual (VT-3 or equivalent) inspection methods and in accordancewith plantspecificationsfor coatings and wrappings.
Any evidence of degradationwill be documented and evaluated through the site corrective actionprocess to determine the needfor subsequent (including periodic)inspections, sample expansion, andfor monitoring and trending the results.
Inspections of the uncoated cast iron Fire Protection System piping and uncoated stainless steel piping in the Condensate Transfer and Storage System will be performed when the piping is excavated for maintenance or other reasons. An inspection of both the uncoated cast iron and stainless steel buried piping will be performed within the 10-year period prior to entering the period of extended operation (i.e., between year 30 and year 40). If an opportunistic inspections hasve not occurred between year 30 and year 38, an excavation of a section of each type of
Enclosure to PLA-6446 Page 3 of 4 the piping for the purpose of inspection will be performed before year 40. An a4dditional inspections of the uncoated buried piping will be performed within 10 years after entering the period of extended operation (i.e., between year 40 and year 50). The inspection locations will be established based on evaluation of recent operating experience, and the condition of buried piping as known based on results of internal inspections or other relevant information. , and a A based
.sk evaluation.
Opportunistic inspections for buried piping and tanks are preferable, as-the excavation of piping-solely for purpose of inspection creates the risk of damaging an otherwise intact and functioning protective coating or of damaging the piping or tanks-itse-f themselves
Enclosure to PLA-6446 Page 4 of 4
> The LRA Section 3.3 table of plant-specific notes (LRA page 3.3-348) is revised by addition (bold italics) and deletion (strikethfe'gh) as follows to clarify that the same aging effects are applicable to both the buried piping and the buried tanks:
Plant Specific Notes:
0327 AMP manages loss of material due to crevice and/or pitting, and general corrosion, and MIC for buried piping and tanks. AMP manages less ef material due to general ccrrosien fcr-buried tanks; creNice and/er-pitting corrosion and MIC are net applicable aging mnechanisms for-bur-ied tantks-.
A.0 Final Safety Analysis Report Supplement A.1.4 License Renewal Commitment List
> LRA Table A-I, SSES License Renewal Commitments (LRA page A-43) is revised by addition (bold italics) as follows (Note:
Changes to the LRA text, previously submitted in Reference 2, are included but not highlighted):
Table A-1 SSES License Renewal Commitment List Item Commitment FSAR Enhancement Number Supplement or Location (LRA Implementation App. A) Schedule
- 26) Buried Program is new. A. 1.2.3 Prior to the Piping and period of Tanks The scope of the Buried Piping and Tanks Inspection Program includes buried components that are extended Inspection within the scope of license renewal for SSES. The program is credited for managing loss of operation.
Program material due to crevice, general, and pitting corrosion and microbiologically influenced corrosion (MIC) for buried steel piping components. In addition, the program is credited with managing loss of material for buried stainless steel piping components. The Buried Piping and Tanks Inspection Program is also credited for managing loss of material due to crevice, general, andpitting corrosion and microbiologicallyinfluenced corrosion (MIC) for buried steel tanks in the Diesel Fuel Oil System.