PLA-5754, Supplemental CD-ROM for the Susquehanna Steam Electric Station Physical Security Plan

From kanterella
Jump to navigation Jump to search
Supplemental CD-ROM for the Susquehanna Steam Electric Station Physical Security Plan
ML041240293
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/29/2004
From: Harpster T
Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
PLA-5754
Download: ML041240293 (5)


Text

T. L. Harpster Gncnral Manager-Plant Support PPL Susquehanna, LLC 769 Salem Boulcvard Bewidc, PA 18603 Td. 570.542.3256 FAX 570.542.1477 tlharpstaIwpplwcb.com I

I pPTA a I I

SAFEGUARDS INFORMATION April 29, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUPPLEMENTAL CD-ROM SUBMITTAL FOR THE SUSQUEHANNA STEAM ELECTRIC STATION PHYSICAL SECURITY PLAN PLA-5754 Docket Nos. 50-387 and 50-388

Reference:

1) PLA -5 730, B. L Shriver (PPL) to (USNRC), "Supplemental Response to the April 29, 2003, Orders to the Susquehanna Steam Electric Station, " dated April 28, 2004.

This letter supplements the referenced PPL Susquehanna, LLC (PPL) correspondence to the NRC dated April 28, 2004. The April 28, 2004 letter included revisions to the PPL Susquehanna, LLC Physical Security Plan, the Contingency Plan, and the Training and Qualification Plan and met the required submittal date of April 29, 2004 as required by NRC Order EA-03-086. Those revisions were submitted on one (1) CD-ROM enclosed in the referenced correspondence. Due to software difficulties associated with file conversion, the files on that CD-ROM contained Microsoft Word files instead of Portable Document Format (PDF).

Attachment A of this submittal includes revisions to the PPL Susquehanna, LLC Physical Security Plan, the Contingency Plan, and the Training and Qualification Plan on PDF files to replace those submitted as Microsoft Word files. There are no content changes to the PPL Susquehanna, LLC Physical Security Plan, the Contingency Plan, and the Training and Qualification Plan submitted on April 28, 2004.

NOTE: ATTACHMENT 'A' TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT 'A', THIS LETTER IS "DECONTROLLED".

SAFEGUARDS INFORMA TION 056

Document Control Desk PLA-5754 SA FEGUARDS INFORMATION Should you have any questions or require additional information, please contact:

Mr. Joseph Meter 769 Salem Boulevard Berwick PA 16803 jjmeterepplweb.com (570) 542-1873 Sincerely, Terry L.

SA FEGUARDS INFORMATION Document Control Desk PLA-5754 SAFEGUARDS INFORMATION

Enclosure:

Attachment A - Revision to the PPL Susquehanna, LLC Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan for Independent Spent Fuel Storage Facility. A total of one (1) CD-ROM is included in this submission for this attachment. The CD-ROM labeled "PPL Physical Security Plan April, 2004 - PDF' contains the following files:

001 PPLPhysicalSecurityPlan 04-04.pdf, 1,591kb, (Safeguards) 002 PPLPLA 5730.pdf, 401kb, (Safeguards) 003 PPLPLA 5754.pdf, 167kb, (Safeguards)

Copy: NRC Region I Mr. R. Guzman, NRC Project Manager Mr. S. Hansell, NRC Sr. Resident Inspector Mr. R. Janati DEP/BRP w/o Attachments w/o Attachments w/o Attachments w/o Attachments SAFEGUARDS INFORMA TION Document Control Desk PLA-5754 SA FEGUARDS INFORMA TION bcc:

M. H. Crowthers J. J. Meter T. L. Harpster B. A. Snapp T. A. Gorman W. H. Lowthert G. M. Machalick E. W. Figard B. P. McBride R. M. Ferentz R. R. Sgarro NRA File DCS Attn: J. Nagle GENPL4 NUCSA4 NUCSA4 GENTW3 GENPL5 NUCAF NUCSB2 NUCFW NUCNG NUCNG GENPL4 GENPL4 GENPL4 w/o Attachments w/o Attachments w/o Attachments w/o Attachments w/o Attachments w/o Attachments w/o Attachments w/o Attachments w/o Attachments w/o Attachments w/o Attachments SA FEGUAIRDS INFORMA TION

Attachment A to PLA-5754 Page 1 of 1 SAFEGUARDS INFORMATION Attachment A to PLA-5754 Revision to the PPL Susquehanna, LLC Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan for Independent Spent Fuel Storage Facility See enclosed CD-ROM file entitled 001 PPLPhysicalSecurityPlan 04-04.pdf NOTE: THE CD-ROM CONTENTS OF THIS ATTACHMENT 'A' CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE CD-ROM CONTENTS OF ATTACHMENT 'A', THIS COVERSIHEET IS "DECONTROLLED".

SAFEGUARDS INFORMATION