Bryce L. Shriver Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570 542.3120 Fax 570.542 1504 blshnver@ pplweb corn m'
m mm n-SAFEGUARDS INFORMATION January 23, 2003 U.S. Nuclear Regulatory Commission Attn: Mr. Glenn Tracy Mail Stop T-4A9 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO THE JANUARY 7,2003 NRC ORDER MODIFYING LICENSES EA-02-261 PLA-5584 Docket No.
and
- 1. Letter, Samuel J. Collins (USNRC) to Michael H. Crowthers (PPL), "Issuance of Order for Compensatory Measures Related to Access Authorization", dated January 7, 2003.
- 2. PLA-5512, B.L. Shriver (PPL) to S.J. Collins, "Final Response to the February 25, 2002 NRC Order Modifying Licenses EA-02-026", dated August 30, 2002.
The purpose of this letter is to submit to the Commission the PPL Susquehanna, LLC (PPL) 20-day response required by Reference 1.
As noted in Reference 1, PPL has voluntarily and responsibly taken actions to implement additional security measures following the events of September 11, 2001. These actions have been taken in order to provide further assurance that the public health and safety and common defense and security are adequately protected in the current generalized high-level threat environment. PPL has implemented the objectives of the February 25, 2002 NRC Order Modifying Licenses EA-02-026 as described in Reference 2 and maintains the effectiveness of security measures taken in response to the events of September 11, 2001.
Recognizing the need for the supplemental provisions described in Reference 1, PPL has taken aggressive action. The PPL completion schedule for those provisions in Reference 1 is provided in to this letter. PPL's response is based upon the guidance provided in Enclosure 4 of Reference 1.
PPL has determined implementation of the applicable requirements would not cause violation of Commission regulations or of the PPL Susquehanna, LLC Unit 1 and Unit 2 operating licenses.
PPL has determined that implementation of the requirements will not adversely impact safe operation of the Susquehanna Steam Electric Station.
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ATTACHMENT 1, HANDLE THIS DOCUMENT AS DECONTROLLED 50-387 50-388
/412
.ek Document Control Desk PLA-5584 In accordance with Condition C.2 of the Order, PPL will report to the Commission when it has achieved full compliance with the requirements described in Attachment 2 of Reference 1.
If you have any questions on this submittal, please contact Mr. J. J. Meter at (570) 542-1873.
Sincerely, Bryce L. Shriver Attachments (2) copy: NRC Region 1 Mr. S. L. Hansell, NRC Sr. Resident Inspector Mr. T. Colburn, NRC Project Manager Mr. R. Janati, DEP/BRP w/o
'i
BEFORE THE BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of PPL Susquehanna, LLC:
Docket No.
50-387 and 50-388 I, Bryce L. Shriver, being duly sworn according to law, state that I am Senior Vice President and Chief Nuclear Officer of PPL Susquehanna, LLC and that the facts set forth on the attached response to the January 7, 2003 Order Modifying Licenses are true and correct to the best of my knowledge, information and belief.