Ro:On 831121,determined That No Surveillances Were on Record for Ionization Smoke Detectors in Pgcc Modules in Fire Zones 0-24D & 0-27E.Work Authorization Issued to Test Detectors.Detectors Acceptable
ML20083E983
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/12/1983
From: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
PLA-1995, NUDOCS 8312300074
Download: ML20083E983 (1)


Text

..

PPat Pennsylvania Power & Light Company w NMh Ninth Stat

  • Ahtown, PA 18101 = 215N5151 December 12, 1983 Dr. 'Ihaaas E. Murley Regional Aittinistrator, Region I U.S. Nuclear Regulatory Camission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION SPECIAL REPORP - FIRE PROEPICE ER 100450 FILE 841-23 Docket No.

50-387 PIA-1995 License No. NPF-14

Dear Dr. Murley:

This ~special report documents the condition whereby two fire zones had less than the minimtun ntmber of ionization smoke detectors operable for a period in excess of fourteen days in accordance with the action statement for Technical Specification 3.3.7.9.

On Novanber 16, 1983, we received Anendment #17 to Facility Operating License No. NPF Susquehanna Steam Electric Station, Unit 1.

The date of issuance of this amendment was November 2,1983, and it included a change to Technical Specification Table 3.3.7.9-1 which added sane fire zones to the Technical Specification which were not previously included.

After ccmpleting a review of the amendment on November 21, 1983, the Plant Staff determined that there were no surveillances on record for ionization detectors in the PGCC modules in fire zones 0-24D and 0-27E. The zones vere declared inoperable and fire watches were established in accordance with the action statement for Technical Specification 3.3.7.9.a.

On November 22, 1983, a station work authorization to test the detectors in the affected zones was satisfactorily canpleted. All ionization detectors were tested and found to be acceptable. Following closure of the work authorization the limiting condition for operation was discontinued.

H.W. Keiser Superintendent of Plant-Susquehanna TPB:pjg cc:

G.G. Rhoads Resident Inspector U.S. Nuclear Regulatory Cmmission P.O. Box 52 Shickshinny, PA 18655 Document Control Desk U.S. Nuclear Regulatory Om nission Washington, DC 20555 8312300074 831212 7