PLA-1891, Monthly Operating Rept for Sept 1983

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1983
ML20081M477
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 10/06/1983
From: Kenyon B, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-1891, NUDOCS 8311170269
Download: ML20081M477 (5)


Text

- _ _ _ _ _ _ _ _ _ _ _ _

[ AVERAGE DAILY UNITPOWER LEVEL

,,,, 3 DOCKET NO. 50-387 L m.:  ;

UNIT One

@ DATE 10/06/83 OYRIC SS COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-2181 MONTH September, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 3 0- 37 1048 2 327 g3 1045 3 695 39 1039 4 920 20 1037 5

1015 21 1042 6 1027 22 1057 7

1037 23 1057 g 1034 24 1057 9 951 25 1053 ,

10 1032 26 1053 Ii 1034 27 1052 12 1043 28 1050

, 13 1050 29 1054 14 1054 30 105'2 l

! 15 1056 3g 16 1055 i

INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.

8311170269 831006 (9/77I PDR ADOCK 05000307 R PDR

. gANN4 WaIh)[*v f......

L AL- M N'\ J OPERATING DATA REPORT N

f4 g d 30 DOCKET NO. 50-387 DATE 10/06/83 OpNIC Sif COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-2181 OPERATING STATUS Unit 1 Notes

1. Unit Name: Susauehanna Stean Electric Station
2. Reporting Period: Sentombnv_ 1497 ~
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 106R
7. Maximum Dependable Capacity (Net MWe): 1032
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe): Nono
10. Reasons For Restrictions. If Any: None This Month Yr..to.Date Cumulative
11. Hours In Reporting Period 720 2.760 2,760
12. Number Of Hours Reactor Was Critical 714.3 2378.4 2378.4
13. Reactor Reserve Shutdown Hours 0 156.7 156.7
14. Hours Generator On-Line 692.1 2317.9 2317.9
15. Unit Reserve Shutdown Hours 0 0 0 l

l 16. Gross Thermal Energy Generated (MWH) 2.212.121 6,766,806 6,766,606 l 17. Gross Electrical Energy Generated (MWH) 721,020 2,190,810 2,190,810 _

18. Net Electrical Energy Generated (MWH) 696,649 2,111,614 2,111,614 l

l 19. Unit Service Factor 96.1 84 84 l 20. Unit Availability Factor 96.1 84 84

21. Unit Capacity Factor (Using MDC Net) 93.8 74.1 74.1

( 22. Unit Capacity Factor (Using DER Net) 90.8 71.8 71.8

! 23. Unit Forced Outage Rate 3.9 16.0 16.0

24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

l l Unit 1/ Unit 2 Tie-in Outace to connence Novmber 8.1983. Scheduled to last 30 days.

l _

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed 6 .ITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) l _ __

$ $A 4 ~

a

%' #r@J3 " M* 2 PPSt n UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 UNIT NAME One

( DATE 10/06/83 M[ COMPLETED BY L.A. Kuczynski

%IC N REPORT MONTH Sectember,1983 TELEPHONE (717)542-2181 n.

- B E No. Date

, .$ E 3g

};; }Y3

.c j @

Licensee Event E

t

$*3 o-

. Cause & Corrective Action to g- g7 F

$E 5 j@g Report # mU fU Prevent Recurrence d

16 830828 F 27.9 A 3 NA CC INSTRU With the unit at 100% power on August 28, 1983, scheduled main turbine stop valve testing was being performed. hhen the last Inain turbine stop valve opened, an MSIV isolation occurred.

A scram followed due to the MSIV's being less than 94% full open.

Grid synchronization was achieved September 2, 1983 at 0353.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.

D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) Il-Other (Explain)

.? i

, 9-SUSQUEHANNA STEAM FMTRIC STATION Docket Ntaber 50-387 Date 10/06/83 Ccmpleted by L.A. Kuczynski Telephone (717)542-2181

-Challenges to Main Steam Safety Relief Valves

-None.

Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Water Treatment Systens None i

i I

L

. . - . - , _ . ~ , - . _ _ _ , _ _ _ _ _ , - . - - . , , . . - . . . . . _ _ _ . . . _ . _ _ _ . , . . _ . . . _ _ _ . , _ . . _ . . _ . . . - _ . . - . _ _ , _ . .

i Q .

PP&L Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 / 770-5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7302 OCT 121983 Director, Data Autcmation &

Management Infennation Division Attention: Mr. M. R. Beebe Management Infonnation Branch Office of Resource Management U.S. Nuclear Regulatory Ccumission Washington, D.C. 20555 SUSQUDIANNA STEAM ELECTRIC STATICN MCNITILY OPERATING TUTORP - SEPTE4BER 1983 ER 100450 FILE 841 PLA-1891 Docket No. 50-387

Dear Mr. Beebe:

The Septerrber 1983 monthly operating report for Susquehanna SES Unit 1 is attached.

Very truly yours,

~f p

B. D. Kenyon Vice President-Nuclear Operations Attachment cc: Dr. Thcmas E. Murley INPO Records Center Regional Administrator-Region I Suite 1500 U.S. Nuclear Regulatory Ccmnission 1100 Circle 75 Parkway 631 Park Avenue Atlanta, Georgia 30339 King of Prussia, PA 19406 Director Mr. Thcmas E. Pollog Office of Inspection and Enforcement Department of Environmental U.S. Nuclear Regulatory Ccmnission Resources Washington, D.C. 20555 Bureau of Radiation Protection Attn: Document Control Desk (12 copies) P.O. Box 2063 Harrisburg, PA 17120 Mr. G. Rhoads - NRC Mr. R. Perch - NRC Yq\

l