PLA-1541, Correction to Interim Deficiency Rept Re Potentially Defective GE Hma Relays.Recorded Date for Ltr PLA-1528 Is 830218
| ML20071C287 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 02/23/1983 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, PLA-1541, NUDOCS 8303010637 | |
| Download: ML20071C287 (2) | |
Text
.-
+
PP&L Pennsylvania Power & Light Company Two North 4inth Street
- Allentown, PA 18101 = 2151770-5151 Norman W. Curtis Vice President-Engineering & Construction-Nuclear Q
215/770-7501 o"
February 23, 1983 Mr. R. C. Haynes Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION CORRECTION TO INTERIM REPORT ON DEFECTIVE GE HMA AUXILIARY RELAYS ER 100508 FILE 821-10 PLA-1541
Reference:
Dear Mr. Haynes:
The referenced PLA-1528 provided the Commission with an interim report on potentially defective GE HMA Relays. When PLA-1528 was mailed to the Commission, the date was inadvertently omitted. Please note that the recorded date for PLA-1528 is February 18, 1983.
Very truly yours, N. W. Curtis Vice President-Engineering & Construction-Nuclear JS:sab B303010637 830223 PDR ADOCK 05000387 S
PDR Y
.-. :4
-February 23, 1983
- 2i-
.SSES
~ PLA-1541
,ER 100508 File 821-10
'Mr. R.:C. Haynes cc a. Mr. Richard C. DeYoung (15)
Director-Office of Inspection-& Enforcement, U.S.' Nuclear Regulatory Commission Washington, D.C. 20555
~Mr. G. Mcdonald, Director Office of Management:Information &' Program Control U.S. Nuclear Regulatory Commission l
. Washington,-D.C. 20555 Mr. Gary Rhoads U.S.' Nuclear Regulatory Commission P.O.-Box-52 Shickshinny, PA 18655 il' 4
i I
i i-1