NUREG/CR-1380, Forwards Fuel Failures in Commerical Nuclear Power Reactors. Rept to Be Ref 3 to NUREG/CR-1380 (PNL3325)
| ML19338C717 | |
| Person / Time | |
|---|---|
| Issue date: | 08/01/1980 |
| From: | Lobel R Office of Nuclear Reactor Regulation |
| To: | Scattolini L NRC OFFICE OF THE SECRETARY (SECY) |
| Shared Package | |
| ML19338C718 | List: |
| References | |
| NUDOCS 8008180571 | |
| Download: ML19338C717 (1) | |
Text
.
yf AM RIOgo I
UNITED STATES 2
o NUCLEAR REGULATORY COMMISSION
.,E WASHING TON, D. C. 20$55 4....,*
August 1, 1980
[EMORANDUMFOR:L. B. Scattolini, Public Document Room, SECY R. Lobel, Safety Program Evaluation Branch, DST FROM:
SUBJECT:
REPORT FOR PUBLIC DOCUMENT ROOM Enclosed is a copy of a report which is a reference in a future NUREG report.
Please include this report in the NRC PDR and provide a citation to which we can make reference.
W. J. Bailey, " Fuel Failures in Comercial Nuclear The enclosed report is:
This study was performed by Battelle Pacific Northwest Labora-Power Reactors."
tories for Quality Assurance Branch, Directorate of Licensing, US AEC, under This report will serve as Reference 3 to NUREG/CR-contract AT (45-1)-1830.
1380 (PNL 3325), " Assessment of Current Onsite Inspection Techniques for Light Water Reactor Fuel Systems."
\\.Last R. Lobel Safety Program Evaluation Branch Division of Safety Technology
Enclosure:
As Stated cc:
R. Aragon R. Meyer F. Coffman 8008180571 i