Text
'* ' *"
- ,.1 Docket No. 50-255
-Mr. -Gerald-B. Sla*de Plant General Manager Palisades Plant DISTRIBUTION/
DOCKET rtrt-OGC
/
-NRC & LOCAL PDRs
- EJORDAN -;/
PD31 R/F ACRS{5) 1/
SMEADOR BHOLIAN 27780 Blue Star Memorial.Highway Covert, Michigan 49043 JZWOLINSKI*
AMASCIANTONIO
/
/
/
Dear Mr. Slade:
/' *
SUBJECT:
ISSUANCE OF SAFETY EVALUATION REPORT RELATED TO THE FULL-TERM OPERATING LICENSE FOR PALISADES PLANT iNUREG-1424)/(TAC NO. 11218)
/
In the years between 1959 and 1971, a P.rovisional Operat,iNJ License (POL) was issued.to 15 power reactors as an intermediate step befor*e issuing a full-term license.* These POLs_ allowed an irlterim period _of routi,rie operation during which both the licensee and* the NRC staff could assess plar,\\l operation and resolve* any gene~ic concerns identified during the licensing process.
I
/
The POL for Palisades, DPR-20, was issued on Mar9.11 24, 1971.
By letter dated January 22, 1974, Consumers Power Company appliea for a ful1-term op.erating lic~~se (FTOq_ for the.Palisades flan!.*
Becay,fe* o,f th~ l~r~_e.n~mbe_r -of issu_es..
relevant *to the operation Of plants with a POL, and the similarity of the scope of review under the Systemati~ Evaluation ~togram (SEP),. the staff stopped reviews of POL conversions and recommended/to the *commission that POL facilities be-included in the SEP.
The.Commission. a*tcepted the recommendation and the re~iew of POL.conversions was_*: subsumeJfnto the Systematic Evaluation Pr~gra_m.
Those issues relevant to POL conversfon and not evaluated in the SEP program have been *reviewed by the staff. The re$'Ults of the staff review. are. provided in the enclosed Safety Evaluation R~porL/ This SER in combination ~lith the Integrated Plant Safety Assessment Report (NtJREG-0820 *and NUREG-0820, Supplement 1) provides the primary.basis for.t~e 1ssuance of a full-term operating* license to Palisades.
Twenty copies of t~is report are enclosed for your information and.
use.
Concurrent with this lelter, copies of this report are also being placed.
in the.Commission's Publi.c Document Room, located at 2120 L Street, N.W.,
Washington, D.C. and in th~llocal public document room e~tablished for Palisades~
The Advisory Committee on1R.eactor Safeguards (ACRS) is scheduled to' discuss, this matter during the ACRS meeting on**oecember 5, 6 and 7, 1990.
I
. /
Sincerely, II I, -"--
- - I -
9012310011 901121. \\
~DR ADOCK 05000255 PD~ L Armando Masciantonio, Project Manager P~oject Directorate.. III
- Divis io.n of Reactor Projects - I Il~
- IV, V & Special Projects Office of Nuclear Reactor Regulati~n
~*
l
- ' \\
~~
~*,
i
.:-~
- .. c,c:. See nl I
- *S~e pr~.v'~ous
- LA/PD3'1:DRSP
.SMEADOR page concurrence PM/PD31:DRSPa.<J.l'I AMASCIANTONIO 11/ /3/90
- D/PD31:DRSP RPIERSON 11/05/90
- AD:DRSP3 JZWOLINSKI 11/05/_90 1'.
1t D:DRP3:5...
- lr01 ' ' '
BABOGER.
I (P
. 11/05/90 11/ /90 PALISADES SE LTR TAC 11218
~
established for Palisades. The Advisory Committee on Reactor Safeguards (ACRS) is scheduled to discuss this matter during the ACRS meeting on December 5, 6 and
- 7. 1990.
E*nclosure:
As stated cc:
See _next page DISTRIBUTION rnri-rtcr OGC NRC & LOCAL PDRs EJORDAN PD31 R/F ACRS(5)
SMEADOR BHOLIAN JZWOLINSKI Ar~ASCIANTONIO D CRUTCHFIELD
- See previous
- LA/PD31:DRSP SMEADOR 11105190 concurrence
.J PM/PD31 :DRSP ~'
AMASC I ANTONIO k--
11 k, 190 Sincerely, Isl Armando Masciantonio, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation
- D/PD31:DRSP RPIERSON 11/05190
- AD:DRSP~~
JZWOLINSKI r~~~~~~
5 11105190 1111v19o PALISADES SE LTR TAC 11218
Docket No. 50-255 Mr. Gerald B. Slade Plant General Manager Palisades Plant UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 November 21, 1990 27780 Blue Star ~emorial Highway Covert, Michigan 49043
Dear Mr. Slade:
SUBJECT:
ISSUANCE OF SAFETY EVALUATIO~ REPORT RELATED TO lHE FULL-TERM OPERATING LICENSE FOR PALISADES PLANT (NUREG-1424) (TAC NO~ 11218)
I~ the.yeats between.1959 and 1971~ a Provisional Operating LiGense (POL) was
- issued tc 15 powe~ reactors as an int~r~tdiate step btfore issuing a full-term lictise; These POLs allowed an 1nterin1 period of routine operation during which both ~he licensee and the ~RC staff could assess pl~nt.cperation and rf:solve ar:y genf!ric concerns idHotified during the 1icu1si.ng process.
- The POL fer Palisades, DPR-20, was issued on March 24;* 1971.
By letter dated**
- January 22, 1914, Consumers Power Company applied for a full-term operathig.
1ice11se (FTOL) for the Palisades Plant.
Because of the large number of issues r*e:lHant to.the cperatfor1 c.f plants ~iith a POL, and the simile;rity of the scope cf revitw under the Systematic Evaluation Program (SEP), the staff stopped tevie:ws of POL. corwersior1s ar;d recommenced to the Corr1missiori that POL*
fcc:i1ities be included in thE* SEP.
The Con!mission ac:u*pted the recomm~r1dation.
ar.1d tht:' revie~J cf POL conversior1s was subsumed into the Systematic Evaluation Program.
Those.issues relevant to POL.conversion and not evaluated *;,, the SEP program have beE:n reviewed by the staff. The results of the staff rt:view are provided in the enclosed Safety fvaluatior1 Report.
Thfs SER in combination with the Integrated Plant Safety Assessmer1t Report (NUREG-0820 and NUREG-0820; Supplement 1) provides the primary basis for the issuance of a full-term ope rat irig license tc Pa 1 i sades. Twenty copies of* this report are er1cl0sed for
.your information and use.
Concurrent with this letter, copies of this report
- are also being plactd in the Commission's Public Document Room, lcicate:d at 2120 ~--Street; *N.~l., Washingtor1, O.C. *and *in the local public *doc;un1ent roCJm estabHsht:d for Palisades. The Advisory Committt-t or1 Reactor Saft-guards (ACRS) is scheduled to disc1Jss this mattH d1.1rir1g the ACRS n*1tetirig ori Dtcernber 5, 6 and 7, 1990.
Enc.lo sun:
fi..s stated tc.:
See next page
-~.
Sincerely,
~
- Armando Masciantonio, Project Manager Project Directorate III-1 Divisior1 of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation
- ... ~
EStablished fer-p*alisades.
Tht* t;cJvisory Con:ndttee or1 Reactor Safeguards (ACRS) is sdf:'clult:<c! to discuss this matter during the ACRS meetir:g en December 5, 6 and 7, ] 990*.
Er*1c l osu re-:
. As stated cc:
See next pagt Dl STRIBUTION nmn-rrrr GGC
- Nl<C &. LOCAL PDRs
.EJCRDAN PD31 R/F
.A.CRS(5) * *-.
SMEADOR
.
- EHOLIAN li Zl-JOL 1 NSK J AMA SC I ANTONIO D CRUTCHFIELD..'
- . '*See previous
- LA/PD31:DRSP SMEADOR 11/05/90 concur.rence
- .1 PM/PD31 :DRSP",-,JV' AMASCIANTONIO Jr-..
11/'Z., /90..
Sincerely,
- .Isl Armando Masciaritonio, Project Manager Projett Directorate III-1 Division cf Reactor Projects -.III,
. IV, v*& Special Projetts Office of Nuclear Reactor Regulation
~**
- D/PD3l:ORSP. *AD:DRSP3 o1I//,~~
RPIERSON
~
JZWOLINSKI
~~~~~:
5 11/05/90 11/05/90 11///t/90.
~r. Gerald.B. Slade Consunic*rs Power Company cc:
M. I. Miller, Esquir~
Sidlt-y & Austin 54th Floor OnE First ~aticnal Plaza Chicagc, Illinois 60603 Mr. Thomas /l.. McNish, S~cretary Corisumers Pow1:r, Company.
212 W~st Michigan Avenue.
Jackson, Michigan 49201*
Judd L. Bacon, Esquire Corislmer~ Po~1l r Ccrr.pany 212 Wtst ~ichigan Avenue Jackson, Michigan 49201 Reg i or, a 1 Acnii i st ra tor**, l<."eg ion Tr'I U.S. NLrclear Rt>gulate:ry Commissfo11 799 Rcosevelt Road Cl£'r. Ell}'.r,, Illir1vis *60137 Jerry Sarno Tc~;r1sh ip Suptrv i sor CC*\\'Ht TO\\'iliStiip 36197 M-140 Highway.
CCJv~rt, Michigan 49043-0ffin* CJf tht: Governor Room 1 - Capitol Buildi~g Lansirig, Yichigan 48913
- Mr. David J. Vandewalle D irectur, Safety and li c:ens irtg Po1isadH Plant 277BO Blue Star-Memorial Hwy.
Covert, Michigan 49043 Residt.*r;t Irrsp~ct~Jr c/o U.S. Nuclear Regulatory Commission PoJ i sa.dt-s P la rr t
.* 27782 Blue Star Memorial Hwy~
Covert, Michigan 49043 Palisa.~t:s Plant Nuclear Faciliti~s and E_nvirorrmental M~rnitoring
-Sectior1 Office Division of Radiological Health P.O. Box 30035
~ansing, Michigarr 48909 Gerald Charnoff, P.'C.
- Shaw, Ptttman, Potts &
Trowbridge 2300 N. Street, N.W.
\\*iashingtorr, D.C.
20037 Mr. David L. Brannen Vice Prtsic!t>rit Pel~~adei Gerrt;ati~g-Plani c/o Bechtel Power Corporati~~*
15740 Shady Grove Rcai Gaithtrsburg, Marylar;d 20877
cc:
See next page LA/PD31:p PM/PD31:DRSPtiO"'
SMEApOR AMASCIANTONIO 11/~ /90*
11/~/90 DISTRIBUTION DOCKET fi"LE-NRC 1 LOCAL PDRs PD31 R/F SMEAD OR JZWOLINSKI D/Pf.1.PoRSP RPim 1
11/S /90 AD:~'>
JZwol'WsKI 11/S /90 OGC
- EJORDAN ACRS(lO)
BHOLIAN AMASCIANTONIO