Submits Preliminary Schedule for Proposed ACRS Subcommittees,Working Groups & Full Committee Meetings Re Reactor Safety Study,Review of OL & CP Applications,Eccs, Working Papers on Reg Guide & Public Comments on NUREG-0034
ML19329C318
Person / Time
Site: Davis Besse, Fermi, North Anna, Cook, 05000510, 05000511, Perkins, Cherokee, Clinch River  American Electric Power icon.png
Issue date: 12/15/1976
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
Shared Package
ML19329C303 List:
References
RTR-NUREG-0034, RTR-NUREG-75-014 NUDOCS 8002130680
Download: ML19329C318 (4)


Text

__

1 Federal Register Notice,

g i

NUCLEAR REGULAIORY C0teilSSION ADVISORY C0011TIEE ON REACTOR SAFEGUARDS Notice of Proposed Meetings In order to provide advance information regarding proposed meetings of ACRS Subcoamittees and Working Groups and of the full Committee, the following preliminary schedule is being published. This preliminary schedule reflects the current situation, taking into account additional meetings which have been scheduled and meetings which have been postponed or cancelled since the last list of proposed meetings published in FR vol. 41, November 22, 1976, page 51482. Those meetings that ste definitely scheduled have had, or will have, an individual notice published i

Those Sub-in the FR approximately 15 days (or more)' prior to the meeting.

committee and Working Group meetings for daich it is anticipated that there vill be a portion or all of the meeting open to the public are indicated by an asterisk (*).

It is expected that the sessions of the full Committee meeting designated by an asterisk (*) will be open in whole or in part to Information as to whether a maeting has been firmly scheduled, the public.

cancelled or rescheduled, or whether changes have been made in the agenda for the January 6-8, 1977 ACRS full Committee meeting can be obtained by a prepaid telephone call to the Office of the Executive Director of the Committee (telephone 202/634-1374 Attn: Mary E. Vanderholt) between 8:15 a.m. and 5:.00 p.m., EST.

8002130f( N

\\

o

,m s a Subcomittee and Working Group Meetings

analytical models formulated to meet current ECCS criteria for fuel fabricated by EXXON for pressurized water reactors with ice condensers and for nonjet-pump boiling water reactors, and to review the application of these models to the Donald C. Cook, Unit No.1 and the Oyster Creek, Unit No. 1, Nuclear Power Plants. Notice of this meeting was published in FR Vol. 41, December 6,1976, page 53377.

  • Davis-Besse Nuclear Power Station, Unit 1, December 21, 1976, Washington, DC to review the application 'of the Toledo Edison Company for an operating Notice of this meeting was published in FR Vol. 41, December 6, license.

1976, page 53376.

  • Donald C. Cook Nuclear Power Plant, Unit No.1, December 22, 1976, Washington, DC to continue the review of the EXION Nuclear Company, Inc.

fuel reload, the related emergency core cooling system analysis, and other items to determine if the plant should be allowed to operate at a 1007. power Notice of this meeting was published in FR Vol. 41, level following refoeling.

December 6, 1976, page 53377.

January 4,1976 (rescheduled from December 8,1976)

  • Reactor Safety Study, Washington, DC to continue the review of WASH-1400 (NUREG-75/014), " n Assessment of Accident Risks in U. S. Commercial Nuclear Power Plants."

l Notices of this meeting were published in FR Vol. 41, November 22, 1976, I

page 51482 and December 2, 1976, page 52922.

l l

l

p

  • ~

d t

itled Regulatory Guides),

l

  • Resulatory Activities (previous y t January 5,1977, Washington, DC to review working papers regarding
Also, future Regulatory Guides and proposed changes to existing Guides.

the current licensing process or to discuss activities which affect d Wilcox reactor operations including matters relating to the Babcock an i

l problems.

reactor surveillance program and to steam generator operat onaDC

  • North Anna Power Station, Units 1 and 2, January 5,1977, Washington, in its continuing to develop information for consideration by the ACRS for review of the application of the Virginia Electric and Power Company a license to operate North Anna Power Station, Units 1 and 2.

12-13, 1977, New Stanton, PA. An

  • Clinch River Breeder Reactor, January Ad Hoc Working Group of this Subcomittee will meet to gather factual information on/thernal hydraulic design of the nuclear power plant to the Research aid the ACRS in its review of the application of the U. S. Energy h

and Development Administration, the Tennessee valley Authority, and t e Project Management Corporation for a permit to construct the Clinc Breeder Reactor.

  • Cherokee Nuclear Station, Units 1, 2, and 3, and Perkins Nuclear Sta i

Charlotte, NC to review the applicat on Units 1. 2, and 3_, January 19, 1977, of the Duke Power Company for a permit to construct these Units.

25, 1977, Chicago, IL

  • Transoortation of Radioactive Materials, January (rescheduled from Never5er'4,1976) to review public coments

" Draft Environmental Statement on the Transportation of Radioac by Air and Other Modes."

t T

-~---c--.-

i

,m o

~

4-

  • Enrico ermi Atomic Power Plant, Unit No. 2, January 27, 1977, Detroit, HI to review the application of the Detroit Edison Company for an I

operating license for Enrico Fermi Atomic Power Plant, Unit No. 2.

/

  • Blue Hills Station, Units 1 and 2, January 28, 1977, Beaumont, TX to j

review the application of Gulf States Utility Company for an early site review.

  • Seismic Activitv, February 8-9, 1977, Washington, DC to discuss l

Appendix A to 10 CFR 100 and the derivation of earthquake response spectra.

  • Regulatorv Activities, February 9,1977, Washington, DC to review i

working papers regarding future Regulatory Guides and proposed changes Also, to discuss pertinent activities which affect to existing Guides.

the current licensing process and/or reactor operations.

Full Committee Meetings Januarv 6-8, 1977_

  • Davis-Bessa Nuclear Power Station, Unit No.1 - Operating 1.

License Review

  • North Anna Power Station, Units No.1 and No. 2 - Operating B.

License Review t

  • Donald C. Cook Nuclear Power Plant, Unit No.1 - Full Power C.

Operation Approval

  • EXXON Nuclear Company, Inc. - Review of ECCS Evaluation Model.

D.

l Februarv 10-12, 1977 I

Agenda to be announced.

f l

\\s Date December 15, 1976 _

Samuel J.

Secretary f the Connission wem e

.