NTD-09-063, Voluntary Response to NRC Regulatory Issue Summary 2009-11 Preparation and Scheduling of Operating Licensing Exams

From kanterella
Jump to navigation Jump to search
Voluntary Response to NRC Regulatory Issue Summary 2009-11 Preparation and Scheduling of Operating Licensing Exams
ML092240080
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/28/2009
From: Kafantaris M
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NTD-09-063, RIS 2009-11
Download: ML092240080 (4)


Text

Nuclear Training Learning & Development Center P.O. Box 236, Hancocks Bridge, NJ 08038 July 28, 2009 0 PSEG NuclearL.L. C.

NTD-09-063 RIS 2009-11 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Nuclear Generating Station Units 1 and 2 Facility Operating License Nos. DPR-70 and 75 NRC Docket Nos. 50-272 and 50-311

SUBJECT:

Voluntary Response to NRC Regulatory Issue Summary 2009-11 Preparation and Scheduling of Operating Licensing Exams

REFERENCE:

NRC Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing Examinations, Dated July 16, 2009 PSEG Nuclear LLC (PSEG) provides its voluntary response to the request for information stated in Reference 1 above. Enclosure 1 to this letter contains the required information for Salem Units 1 and 2.

Should you have any questions regarding this transmittal, please contact M. Straubmuller at 856-339-1727.

Sincerely, Marios.C. Kafantaris Manager Training - Salem Enclosure (1)

H003 14e&

Document Control Desk 7/28/09 NTD 09-063 C Mr. Samuel Collins, Administrator - Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Samuel Hansell Chief, Operational Safety Branch U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 US NRC Resident Inspector Office - Salem (X24)

,'.A Enclosure 1 NTD-09-063 SALEM UNITS 1 AND 2 Docket Nos. 50-272 and 50-311 Operator Licensing Examination Data (NRC Form 536)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION SALEM NUCLEAR GENERATING STATION ONE A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy 2011 CY 20 12 Cy 2013 NUMBER.OF REACTOR 3 5 3 0 OPERATORS NUMBER OF SENIOR REACTOR 5 8 6 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 3 2 3 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 05/10/2010 05/09/2011 08/20/2012 ALTERNATE DATE 05/17/2010 05/16/2011 08/27/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2011 CY PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER