NSD-NRC-98-5761, Provides Written Confirmation That Identified Figure Is Not Considered Proprietary by W.Refs 1-5,discussed

From kanterella
(Redirected from NSD-NRC-98-5761)
Jump to navigation Jump to search
Provides Written Confirmation That Identified Figure Is Not Considered Proprietary by W.Refs 1-5,discussed
ML20237D477
Person / Time
Site: 05200003
Issue date: 08/19/1998
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NSD-NRC-98-5761, NUDOCS 9808260221
Download: ML20237D477 (2)


Text

_ -- _ _ - __ _ - - __ _ _

l  :

y %5 Westinghouse Energy Systems Ba 355 Pittsburgh Pennsylvania 15230 0355 Electric Corporation DCP/NRC1420 NSD-NRC-98-5761 Docket No.: 52-003 August 19,1998 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: T. R. QUAY

SUBJECT:

RESPONSE TO NRC LETTERS CONCERNING REQUESTS FOR WITHHOLDING INFORMATION

Reference:

1. Letter, Jackson to Liparuto, " Request for withholding information from public disclosure for Westinghouse AP600 design letter of May 15,1995," dated January 22,1996.
2. Letter, Jacksoi to McIntyre, " Request for withholding information from public disclosure for We:wghouse AP600 design letter of October 28,1996," dated February 19, 1997.
3. Letter, McIntyre to Quay, " Nonproprietary versions of material provided by Westinghouse letter NSD-NRC-96-486,4, dated May 16,1997.
4. Letter, fluffman to McIntyre, " Request for withholding information from public disclosure for Westinghouse AP600 design letters," dated July 14, 1998.
i. 5. Letter, McIntyre to Quay, " Response to NRC letter of August 23,1995,

' Request for withholding information in the design certification application for the AP600,"' DCP/NRC1400, dated July 22,1998.

Dear Mr. Quay:

Reference I sets forth the NRC assessment of the Westinghouse claim for treatment of proprietary L information submitted by Westinghouse in a letter dated May 15,1995, which letter provided Westinghouse report PCS-T2R-050, "Large Scale Test Data Evaluation, May 1995." The NRC assessment was that with the exception of Figure 1-3, "Large-scale PCS instrumentation Elevations" located on page 1-8, the material identified as proprietary would be withheld. The staff claimed that the identified figure was available to the public through other Westinghouse reports. In a telephone {D call with Ms. Jackson on January 29,1996, Westinghouse agreed that the identified figure was not

- proprietary. Ms. Jackson indicated that the identified figure would be placed in the Public Document _

Room. This letter provides written confirmation that the identified figure is not considered proprietary by Westinghouse. /o s a' k PDR A ADOCK 05200003 PDR

l '

r DCP/NRCl420 NSD-NRC-98-5761 August 19,1998 l 1

Reference 2 sets forth the NRC assessment of the Westinghouse claim for treatment of proprietary l information submitted by Westinghouse in a letter dated October 28,1996, which letter provided j formal documentation of informal correspondence sent to the NRC by Westinghouse for the period  !

September 23,1996 through October 24,1996. The NRC assessment was that the nonproprietary I version of the document was not acceptable. A revised nonproprietary version of the attachment to Reference 2 was provided in Reference 3. This revised nonproprietary version of the document l included summaries of the proprietary material in those few instances where it had been removed. )

i Reference 4 sets forth the NRC assessment of the Westinghouse: claim for treatment of proprietary information submitted by Westinghouse in a letter dated October 16,1996, which letter provided fission product transport calculations and fission product source rates for the AP600. The NRC assessment was no information was identified as being proprietary and that no nonproprietary version of the document was provided. The information provided in the Westinghouse letter of October 16, 1996, was similar to that provided in the AP600 probabilistic risk assessment on June 26,1992. The proprietary information in that report, and subsequent updates, was addressed in Reference 5.

Reference 5 indicates the information related to fission product transport calculations and fission l product source rates for the AP600 is no longer considered proprietary and the October 16,1996, letter can be placed in the public document room.

l A lirian A. McIntyre, Manager Advanced Plant Safety and Licensing jml cc: J. W. Roe - NRC/NRR/DRPM  !

J. M. Sebrosky - NRC/NRR/DRPM l W. C. liuffman - NRC/NRR/DRPM l

11. A. Sepp - Westinghouse '

l l

n.<. wr l

l.