NSD-NRC-97-5076, Forwards AP600 TS LCO 3.0.2 & 3.0.3,reflecting Compliance W/Nrc Staff Position of Ltr

From kanterella
(Redirected from NSD-NRC-97-5076)
Jump to navigation Jump to search
Forwards AP600 TS LCO 3.0.2 & 3.0.3,reflecting Compliance W/Nrc Staff Position of Ltr
ML20141C689
Person / Time
Site: 05200003
Issue date: 05/09/1997
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141C694 List:
References
NSD-NRC-97-5076, NUDOCS 9705190153
Download: ML20141C689 (2)


Text

_ - - . . - . _ _ _ . . . _ . _. _ _ . _ _ . . . _ . _ _ _ _ _ _ _ _ _ _ _ _ .

p 1 Lt , .ygg~

,w ,

. d';?

Westinghouse Energy Systems g,3 Nan Pennsylvania 15230 03ss

_ Electric Corporation NSD-NRC-97-5076 1 DCP/NRC0820 i

[ Docket No.: STN-52-003

  • - May 9,1997 l Document Control Desk .

U.S. Nuclear Regulatory Commission  ;

Washington, DC 20555 7 L ATTENT!ON: T. R. QUAY. 1

SUBJECT:

AP600 TECHNICAL SPECIFICATION LCO 3 0.3 TO REFLECT RESOLUTION OF NRC COMMENTS

References:

1. Letter from NRC to Westinghouse, Martin to Liparuto, "AP600 Technical L Specification (TS) Limiting Condition for Operation (LCO 3.0.3)", dated April 3, ,

! 1997.

2. NUREG-1431 " Star.dardized Technical Specifications Westinghouse Plants", April  :

J 1995.

3. Letter from NRC to Westinghouse, Martin to Liparulo, " List of Key L.icensing Issues on the AP600 Design", dated December 6,1996.

Dear Mr. Quay:

Attached are AP600 Technical Specification (TS) Limiting Conditions for Operation' (LCO) 3.0.2 and 3.0.3 to reflect compliance with the NRC staff position of Reference 1. ' Completion times and wording have been restored to the wording in the Standardized IS (STS) of Reference 2, with two excepdons.

One exception appears in the BASES for LCO 3.0.3 as a result of an NRC request to include a shutdown mode matrix in the TS Bases (see DSER open item tracking system (OITS) item 2352).

f ;.

The other exception appears in the last paragraph of the BASES for LCO 3.0.3 where the STS " Fuel , , ,

Storage Pool" is referred to as the " Spent Fuel Pool" for the AP600 and STS LCO 3.7.15 is ',

renumbered LCO 3.7.5 for the AP600. This is not a deviation from the STS, rather terminology and TS numbering differences based specifically on the AP600 design and TS.

! The attachment'is provided as an advance portion of the AP600 TS for NRC review and completes l Westinghouse action for OITS item 4182. Such that tne Westinghouse status for OITS item 4182 has

_ been changed to Action N. We believe this resolves Key' Licensing issue 19 of Reference 3. _

1

,31MA l L

100002 .li.I..I.ql.ll.iI.

~ ~ ~ ~ " ~

9705190153'970509 Y

~

PDR ADOCK 03200003?

E FDR %

. NSD-NRC-97-5076 l ., DCP/NRC0820 May 9,1997 - _

To meet the schedular objectives of SECY-97-051 for Westinghouse to provide the NRC with the final

. SSAR and supporting documentation by May 30,1997, NRC is requested to review the attachment : l and advise Westinghouse if there are any comments. Otherwise, the attachment will be incorporated into the final AP600 Technical Specifications, SSAR Section 16.1.

l l

l. Please contact Robin K. Nydes (412-374-4125) if you have any questions regarding this transmittal.

I i/W

Brian A. McIntyre, Manager  ;

Advanced Plant Safety and Licensing jml ]

l Attachment  ;

cc: Bill Huffman, NRC (w/ Attachment) )

Angela Chu, NRC (w/ Attachment)

! Chris Grimes, NRC (w/ Attachment) 1- Nicholas J. Liparulo, Westinghouse (w/o Attachment) i i

I l

l i

t

.l i i I' l i

i l

1 l

4 i 5

4-3163A

)

I i

i

_ - __ __