  • NEXTera~**'

f=NERGY~...

July n; 2019.

u. S. Nuclear Regulatory Commission *

. ATTN: Document,Control Desk*

Washington, o.*c. 20555:-:0001

Point Beach Nuclear Plant,.Units 1 and2 Dockets 50-266 and 50,.301 Renewed Lic.ense No$:* DPR-24 and DPR-27

POINT*

.. BEACH NRG 2019;.0022

. 10 CFR.50:54(q) 1 o CFR 72.44(f).

In accordance with 10.CFR 50.54(q)(5) arid 1 o CFR 72.44(f); NextE.ra Energy paint Beach, LLC (NextEra). hereby submits a* description cif changes to the. Point Beach Nuclear Plant' (PBNP)

  • Emergency Plan and a surnmary_ of the analy!:iis de111onstrating. that the change~ do not reduce
  • the effectiveness of the pl;:1h. The plan continues to. nieet the requirements in

.. 1 O CFR 50 Appendix E and the.planning standards of 10 CFR 50.47(b). The changes were

  • incorporated in the following procedure *issued June 13, 2019 at PBNP:
  • i EP Appendix B, Emergency Classification, Revision 33, * *

. Description. of Changes and Summary* of Analysis EP, AppendixB was. rElvised du~to Ucense Amenciment. 261/264*, Re\\lision to _Emergenc;y.

classification Levels to NEI 99.-01 Revision 6 structure and. associated changes under Safety
determined to notreduce trye effectiveness of the.PBNP Emerge~cy Plan., *:
  • .

.,have any. questions; piease contact Denny Smith at 920-755-6001:.. *.

Sincerely,

. *NextEra Energy Point Beach, LLC Eric Schultz Licensing Manager