March 8, 2018 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Report of Changes to Emergency Plan NRC 2018-0008 10 CFR 50.54(q) 10 CFR 72.44(f)
In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), NextEra Energy Point Beach, LLC (NextEra) hereby submits a description of changes to the Point Beach Nuclear Plant (PBNP)
Emergency Plan and a summary of the analysis demonstrating that the changes do not reduce the effectiveness of the plan. The plan continues to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b). The changes were incorporated in the following procedures issued February 8, 2018 at PBNP:
EP Appendix B, Emergency Classification, Revision 32 Description of Changes and Summary of Analysis EP Appendix B was revised due to the values for subcooling being changed based on Revision 2 of Calculation 2010-0021.
These changes were evaluated in accordance with 10 CFR 50.54(q)(3) and it was determined that these changes did not reduce the effectiveness of the PBNP Emergency Plan.
This letter contains no new regulatory commitments or revisions to existing commitments. If you have any questions, please contact Mark Wilcox at 920-755-6678.
Very truly yours, NextEra Energy Point Beach, LLC Eric Schultz Licensing Manager cc:
Incident Response Center, Region Ill Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241