NRC 2013-0062, Response to Regulatory Information Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations
| ML13179A451 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/28/2013 |
| From: | Millen M Point Beach |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC 2013-0062, RIS 2013-06 | |
| Download: ML13179A451 (2) | |
Text
June 28, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Regulatory Information Summary 2013-06.
"Preparation and Scheduling of Operator Licensing Examinations" NEXTera ENERGY~
POINT BEACH NRC 2013-0062 RIS 2013-06 On June 07, 2013, the NRC issued Regulatory Issue Summary (RIS) 2013-06. RIS 2013-06 requested that each licensee provide an update of operator licensing examination information for calendar years 2015 through 2018.
The enclosure to this letter provides the NextEra Energy Point Beach, LLC, response for the Point Beach Nuclear Plant, Units 1 and 2.
If there are questions associated with the content of the enclosures, please contact Mr. Douglas Lauterbur, Point Beach Nuclear Plant Training Manager, at 920/755-7791.
Very truly yours, NextEra Energy Point Beach, LLC Michael Millen Licensing Manager Enclosure cc:
Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This Information collection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-000t, or by Internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponscr, and a person Is not required to respond to, the Information collection.
FACILITY NRc; REc;luN Point Beach Nuclear Plant, Units 1 and 2 III Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 6
0 6
0 OPERATORS NUMBER OF SENIOR REACTOR 8
0 8
0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0
0 1
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 02/23/2015 04/24/2017 ALTERNATE DATE 04/20/2015 06/12/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 15 0
0 0
0 0
CANDIDATES NRC FORM 536 (09-2011)