NRC 2012-0092, NextEra Energy Point Beach, Llc'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12

From kanterella
(Redirected from NRC 2012-0092)
Jump to navigation Jump to search
NextEra Energy Point Beach, Llc'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML12305A201
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/26/2012
From: Meyer L
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-049, NRC 2012-0092
Download: ML12305A201 (3)


Text

NEXT October 26,2012 NRC 2012-0092 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Docket 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 NextEra Energy Point Beach, LLCJsInitial Status Report in Response to March 12, 2012 Commission Order Modifving Licenses with Regard to Requirements for Mitigation Strategies for Bevond-Design-Basis External Events (Order Number EA-12-049)

References:

( 1 U.S. Nuclear Regulatory Commission, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," Order Number EA-12-049, March 12,2012 (ML12054A736)

(2) U.S. Nuclear Regulatory Commission, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," Interim Staff Guidance JLD-ISG-2012-01, Revision 0, August 29,2012 (MLI 2229A174)

(3) Nuclear Energy Institute letter to NRC, dated February 24, 2012, Industry Initiative on Procurement of Equipment for the Diverse and Flexible Coping Strategy (FLEX) (ML12061A023)

(4) Nuclear Energy Institute, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide," NEI 12-06, Revision 0, August 2012 (MLI2242A378)

On March 12,2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to NextEra Energy Point Beach, LLC (NextEra). Reference (1) was immediately effective and directs NextEra to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference (1).

Reference (1) requires submission of an initial status report 60 days following issuance of the final interim staff guidance. The final interim staff guidance (Reference 2) was issued August 30, 2012. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference ( I ) within 60 days following issuance of Reference (2).

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 This report confirms NextEra has received Reference (2) and is in the process of evaluating the guidance for the purpose of establishing mitigation strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basisexternal event as described in Attachment 2 of Reference (1).

Major activities completed during this reporting period:

Additional portable equipment was ordered prior to the issuance of Reference (2), as described in an NEI letter to the NRC (Reference 3).

A site-specific coping capabilities evaluation has been completed and NextEra is in the process of establishing coping strategies as defined in NEI 12-06 (Reference 4).

Resources are being identified and project plans initiated, including development of milestones, to assure compliance with Reference (1).

Planned activities for the next six months:

Development and submittal of the overall integrated plan.

Technical difficulties encountered that could affect the ability to provide the licensee's February 28,201 3, submittal:

None at this time.

Project milestones schedule through completion of installation and testing:

A project milestones schedule will be provided with the overall integrated plan.

lmplementation of the order will be completed for Point Beach Nuclear Plant (PBNP)

Unit 1 prior to startup from Refueling Outage (RFO) 35 (Fall 2014).

lmplementation of the order will be completed for PBNP Unit 2 prior to startup from RFO 34 (Spring 2015).

This letter contains no new Regulatory Commitments and no revisions to existing Regulatory Commitments.

If you have any questions please contact Mr. James Costedio, Licensing Manager, at 9201755-7427.

Document Control Desk Page 3 I declare under penalty of perjury that the foregoing is true and correct.

Executed on October 26, 2012.

Very truly yours, NextEra Energy Point Beach, LLC vt$"Meyer Site Vice President cc: Director, Office of Nuclear Reactor Regulation Administrator, Region Ill, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Ms. Jessica A. Kratchman, NRWJLDIPMB, USNRC Mr. Eric E. Bowman, NRWDPWPGCB, USNRC