NRC 2009-0101, Submittal Security Plan., Revision 9

From kanterella
(Redirected from NRC 2009-0101)
Jump to navigation Jump to search
Submittal Security Plan., Revision 9
ML092870169
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/01/2009
From: Meyer L
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2009-0101
Download: ML092870169 (1)


Text

SAFEGUARDS INFORMATION NEX~e Iqiz ENERY

`

PINT BEACH October 1, 2009 NRC 2009-0101 10 CFR 50.54(p)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Revision To Security Plan Enclosed is Revision 9 of the Point Beach Nuclear Plant (PBNP) Physical Security Plan (PSP). contains a description of, and justification for, the changes included in Revision 9. contains Revision 9 of the PSP.

In accordance with 10 CFR 50.54(p), NextEra Energy, Point Beach (NextEra) LLC, has determined that the changes contained in Revision 9 do not decrease the safeguards effectiveness of the PBNP PSP.

Information contained in the enclosures to this document has been classified as Safeguards Information. Therefore, NextEra requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390.

This letter contains no new commitments and no revisions to existing commitments.

Very truly yours, NextEra Energy Point Beach, LLC Larry Meyer Site Vice President Enclosures cc:

Administrator, Region III, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NOTE: THE ENCLOSURES TO THIS LETTER CONTAIN SAFEGUARS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ENCLOSURES, THIS LETTER IS DECONTROLLED.

0ooI SAFEGUARDS INFORMATION L

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, Wl 54241

\\

./

SAFEGUARDS INFORMATION October 1, 2009 NRC 2009-0101 10 CFR 50.54(p)

U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Revision To Security Plan Enclosed is Revision 9 of the Point Beach Nuclear Plant (PBNP) Physical Security Plan (PSP). contains a description of, and justification for, the changes included in Revision 9. contains Revision 9 of the PSP.

In accordance with 10 CFR 50.54(p), NextEra Energy, Point Beach (NextEra) LLC, has determined that the changes contained in Revision 9 do not decrease the safeguards effectiveness of the PBNP PSP.

Information contained in the enclosures to this document has been classified as Safeguards Information. Therefore, NextEra requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390.

This letter contains no new commitments and no revisions to existing commitments.

Very truly yours, NextEra Energy Point Beach, LLC

&-d!?~",",<-

Larry Meyer Site Vice President Enclosures cc:

Administrator, Region III, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NOTE: THE ENCLOSURES TO THIS LETTER CONTAIN SAFEGUARS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ENCLOSURES, THIS LETTER IS DECONTROLLED.

SAFEGUARDS INFORMATION NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Bool L}~