NRC 2005-0078, Annual 10 CFR 50.59 Summary Report for 2004

From kanterella
Jump to navigation Jump to search
Annual 10 CFR 50.59 Summary Report for 2004
ML051940312
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/01/2005
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2005-0078
Download: ML051940312 (1)


Text

NMC Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC July 1, 2005 NRC 2005-0078 10 CFR 50.59 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Annual 10 CFR 50.59 Summary Report for 2004 As required by 10 CFR 50.59, Nuclear Management Company, LLC (NMC), is submitting this annual 10 CFR 50.59 Summary Report for the Point Beach Nuclear Plant (PBNP).

This report consists of two enclosures. Enclosure 1 contains descriptions of facility changes, tests and experiments in accordance with 10 CFR 50.59 during 2004. contains commitment change evaluations completed in 2004.

This letter contains no new commitments and no revisions to existing commitments.

Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosures (2) cc:

Regional Administrator, Region IlIl, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321