Page Revision for Point Beach Nuclear Plant Security Plan
ML042950025
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/18/2004
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Security and Incident Response
References
+sispmjr200506, -RFPFR, EA-03-086, FOIA/PA-2005-0236, NRC 2004-0109
Download: ML042950025 (1)


Text

I S NFEGUARDS INFORMATION Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC October 18, 2004 NRC 2004-0109 EA-03-086 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266, 50-301 and 72-005 License Nos. DPR-24 and DPR-27 Page Revision for Point Beach Nuclear Plant Security Plan On August 30, 2004, Nuclear Management Company, LLC (NMC) submitted a revised Security Plan for Point Beach Nuclear Plant, Units 1 and 2, in response to NRC's Order Requiring Compliance with Revised Design Basis Threat (Order EA-03-086, dated April 29, 2003). The submitted Security Plan incorporated revisions to address NRC Requests for Additional Information. Subsequent to that submittal, it was determined that additional changes were needed. As previously discussed with the NRC staff, the enclosed submittal contains those changes. Please replace the previously submitted Point Beach Nuclear Plant Security Plan with the enclosed version.

This letter makes no new commitments or changes to any existing commitments.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on October 18, 2004.

Dennis L. Koehl Site Vice President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc:

(less enclosures)

Regional Administrator, USNRC, Region III Project Manager, Point Beach Nuclear Plant, USNRC NRC Resident Inspector, Point Beach Nuclear Plant, USNRC NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENTS, THIS LETTER IS "DECONTROLLED."

6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

--~ V10-6o