NRC 2003-0109, September 2003 Monthly Operating Report for Point Beach Nuclear Plant

From kanterella
(Redirected from NRC 2003-0109)
Jump to navigation Jump to search
September 2003 Monthly Operating Report for Point Beach Nuclear Plant
ML033350255
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/11/2003
From: Cayia A
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2003-0109
Download: ML033350255 (6)


Text

.7 Committed to Nuclear Excellene Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC November 11, 2003 NRC 2003-0109 GL 97-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant Dockets 50-266 And 50-301 License Nos. DPR-24 And DPR 27 Monthly Operating Report In accordance with Technical Specification 5.6.3, attached is the Monthly Operating Report for September 2003 for the Point Beach Nuclear Plant, Units 1 and 2.

This letter contains no new commitments and no revisions to existing commitments.

4-A. . ayia '

Sit esident, Point Beach Nuclear Plant Nut eManagement Company, LLC Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector - Point Beach Nuclear Plant, USNRC 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

'-f 15kL+

ENCLOSURE I NRC MONTHLY OPERATING REPORT

li,0)

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 11/05/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD October - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7,082.5 238,681.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 745.0 7,074.2 235,132.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 378,813.5 3,597,978.0 109,149,287.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SIIUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit I DATE: 11/11/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: October 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (I) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit I average daily power for the month of October was 508.5 MWe.

There was a supplement LER on Unit I in the month of October: LER 2003-003-01, Possible Common Mode Failure of AFW Due to Partial Clogging of Recirculation Orifices.

On October 29, 2003 at 0311 Point Beach Unit I commenced a load reduction at the request of Power System Supervisor (PSS) due to Solar Magnetic Disturbances on IXOI transformers. Load reduction was held at 450 MWe (83%). October 30,2003 at 0345 Point Beach was notified by PSS that Unit I can return to full load.

'I OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 11/05/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD October - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 73.2 6,520.8 232,273.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 72.7 6,467.4 229,233.1
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 26,332.5 3,210,692.0 107,998,495.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

.1 UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 11/11/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: October 2003 (Month/Year)

NO. TYPE METHOD OF CAUSE/CORRECTIVE ACTIONS DATE F: FORCED DURATION REASON (1) SHUTTING S: SCHEDULED DOWN (2) COMMENTS 4 10/04/2003 S 672.3 C I (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of October was 35.4 MWe.

There were no LERs on Unit 2 in the month of October.

Text

.7 Committed to Nuclear Excellene Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC November 11, 2003 NRC 2003-0109 GL 97-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant Dockets 50-266 And 50-301 License Nos. DPR-24 And DPR 27 Monthly Operating Report In accordance with Technical Specification 5.6.3, attached is the Monthly Operating Report for September 2003 for the Point Beach Nuclear Plant, Units 1 and 2.

This letter contains no new commitments and no revisions to existing commitments.

4-A. . ayia '

Sit esident, Point Beach Nuclear Plant Nut eManagement Company, LLC Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector - Point Beach Nuclear Plant, USNRC 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

'-f 15kL+

ENCLOSURE I NRC MONTHLY OPERATING REPORT

li,0)

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 11/05/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD October - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7,082.5 238,681.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 745.0 7,074.2 235,132.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 378,813.5 3,597,978.0 109,149,287.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SIIUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit I DATE: 11/11/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: October 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (I) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit I average daily power for the month of October was 508.5 MWe.

There was a supplement LER on Unit I in the month of October: LER 2003-003-01, Possible Common Mode Failure of AFW Due to Partial Clogging of Recirculation Orifices.

On October 29, 2003 at 0311 Point Beach Unit I commenced a load reduction at the request of Power System Supervisor (PSS) due to Solar Magnetic Disturbances on IXOI transformers. Load reduction was held at 450 MWe (83%). October 30,2003 at 0345 Point Beach was notified by PSS that Unit I can return to full load.

'I OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 11/05/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD October - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 73.2 6,520.8 232,273.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 72.7 6,467.4 229,233.1
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 26,332.5 3,210,692.0 107,998,495.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

.1 UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 11/11/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: October 2003 (Month/Year)

NO. TYPE METHOD OF CAUSE/CORRECTIVE ACTIONS DATE F: FORCED DURATION REASON (1) SHUTTING S: SCHEDULED DOWN (2) COMMENTS 4 10/04/2003 S 672.3 C I (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of October was 35.4 MWe.

There were no LERs on Unit 2 in the month of October.