Nuclear Management Company, LLC Point Beach Nuclear Plant NM C Committed to Nuclear Ecellence 6610 Nuclear Road Two Rivers, WI 54241 NRC 2002-0100 GL 97-02 November 15, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:
Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of October 2002.
Sincerely, J. ia Sit *e 1dent KYML Attachment cc: J. D. Loock, PSCW NRC Region 11I NRC Senior Resident Inspector NRC Project Manager
Docket 50-266 and 50-301 NRC-2002-0100 Bcc: R.A. Abdoo (WE) D. E. Day M. E. Reddemann K. E. Peveler R. A. Anderson(NMC) K. Kretzer G. A. Charnoff C. B. Jilek INPO Records Center A. J. Cayia J. Freels McGraw-Hill Companies R. R. Grigg (WE) J. E. Horvath C. S. Smoker (NMC) T. E. Ruiz E. J. Weinkam III (NMC) T. W. Hanna G. D. Strharsky R. R. Winget D. A. Weaver (WE) B. Day RSL File (3) B. D. Kemp T.H. Taylor File A-2
Docket 50-266 and 50-301 NRC-2002-0100 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)
To Document Control Desk (NRC)
Dated November 8, 2002 Re: Monthly Operating Report - October 2002
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 11/08/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD October - 2002
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 510.0 MONTH YEAR TO DATE CUMULATIVE,
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 380.1 6,525.6 230,135.4
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 355.5 6,500.5 226,594.5
- 5. UNIT RESERVER SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 151,508.0 3,237,889.0 104,813,409.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
I UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 11/08/2002 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: October 2002 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS 1 09/14/02 S 364.9 C U1R27 REFUELING OUTAGE (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G. Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 1 average daily power for the month of October was 203.3 MWe.
Licensee Event Reports (LERs) submitted to the NRC in October:
LER 266/2002-001-01, Steam Generator Blowdown Valve Analyzed as Not Able to Close Against Full Differential Pressure.
Operating Events: AFW Recirc Orifice Flow Restriction
- -v OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 11/08/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD October - 2002
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 512.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6,507.4 224,289.1
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 745.0 6,471.6 221,301.7
- 5. UNIT RESERVER SHUTDOWN HOURS 0.0 0.0 302.2
- 6. NET ELECTRICAL ENERGY (MWH) 380,915.0 3,253,185.0 104,036,693.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
I UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 11/08/2002 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: October 2002 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE°ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G .Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 2 average daily power for the month of October was 511.3 MWe.
Licensee Event Reports (LERs) submitted to the NRC in October:
301/2002-002-01 Supplemental, Pressurizer Safety Valve Failed to Lift at Pressure.
Operating Events: AFW Recirc Orifice Flow Restriction
Text
Nuclear Management Company, LLC Point Beach Nuclear Plant NM C Committed to Nuclear Ecellence 6610 Nuclear Road Two Rivers, WI 54241 NRC 2002-0100 GL 97-02 November 15, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:
Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of October 2002.
Sincerely, J. ia Sit *e 1dent KYML Attachment cc: J. D. Loock, PSCW NRC Region 11I NRC Senior Resident Inspector NRC Project Manager
Docket 50-266 and 50-301 NRC-2002-0100 Bcc: R.A. Abdoo (WE) D. E. Day M. E. Reddemann K. E. Peveler R. A. Anderson(NMC) K. Kretzer G. A. Charnoff C. B. Jilek INPO Records Center A. J. Cayia J. Freels McGraw-Hill Companies R. R. Grigg (WE) J. E. Horvath C. S. Smoker (NMC) T. E. Ruiz E. J. Weinkam III (NMC) T. W. Hanna G. D. Strharsky R. R. Winget D. A. Weaver (WE) B. Day RSL File (3) B. D. Kemp T.H. Taylor File A-2
Docket 50-266 and 50-301 NRC-2002-0100 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)
To Document Control Desk (NRC)
Dated November 8, 2002 Re: Monthly Operating Report - October 2002
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 11/08/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD October - 2002
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 510.0 MONTH YEAR TO DATE CUMULATIVE,
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 380.1 6,525.6 230,135.4
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 355.5 6,500.5 226,594.5
- 5. UNIT RESERVER SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 151,508.0 3,237,889.0 104,813,409.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
I UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 11/08/2002 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: October 2002 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS 1 09/14/02 S 364.9 C U1R27 REFUELING OUTAGE (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G. Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 1 average daily power for the month of October was 203.3 MWe.
Licensee Event Reports (LERs) submitted to the NRC in October:
LER 266/2002-001-01, Steam Generator Blowdown Valve Analyzed as Not Able to Close Against Full Differential Pressure.
Operating Events: AFW Recirc Orifice Flow Restriction
- -v OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 11/08/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD October - 2002
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 512.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6,507.4 224,289.1
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 745.0 6,471.6 221,301.7
- 5. UNIT RESERVER SHUTDOWN HOURS 0.0 0.0 302.2
- 6. NET ELECTRICAL ENERGY (MWH) 380,915.0 3,253,185.0 104,036,693.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
I UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 11/08/2002 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: October 2002 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE°ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G .Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 2 average daily power for the month of October was 511.3 MWe.
Licensee Event Reports (LERs) submitted to the NRC in October:
301/2002-002-01 Supplemental, Pressurizer Safety Valve Failed to Lift at Pressure.
Operating Events: AFW Recirc Orifice Flow Restriction