Request Withdrawal of Relief Request MR-02-004-1 and MR-02-004-2
ML022190447
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/15/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-02-001, NRC 2002-0045
Download: ML022190447 (1)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 NMC>

Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0045 10 CFR 50.55a May 15,2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Docket 50-301 Point Beach Nuclear Plant, Unit 2 Reactor Vessel Closure Head Inspection Request for Withdrawal of Relief Requests MR 02-004-1 and MR 02-004-2 In accordance with 10 CFR 50,55a(a)(3)(i) and 10 CFR 50.55a(g)(5)(iii), Nuclear Management Company, LLC (NMC), licensee for the Point Beach Nuclear Plant (PBNP) Unit 2, submitted Relief Requests MR 02-004-1 and MR 02-004-2 on April 17,2002. This action is related to NMC7sresponse dated April 2,2002, to NRC Bulletin 2002-001, "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity."

The associated inspection of the Unit 2 reactor vessel head commenced on April 2 1,2002. The visual inspection showed that the head is in very good condition, with no evidence of leakage.

As a result, PBNP will not be performing any reactor vessel head repairs. Therefore, Relief Requests MR 02-004-1 and MR 02-004-2 are no longer required and their withdrawal is hereby x*&

requested.

Thomas J. Webb Regulatory Affairs Manager cc: NRC Regional Administrator NRC Project Manager NRC Resident Inspector PSCW

Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 NMC>

Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0045 10 CFR 50.55a May 15,2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Docket 50-301 Point Beach Nuclear Plant, Unit 2 Reactor Vessel Closure Head Inspection Request for Withdrawal of Relief Requests MR 02-004-1 and MR 02-004-2 In accordance with 10 CFR 50,55a(a)(3)(i) and 10 CFR 50.55a(g)(5)(iii), Nuclear Management Company, LLC (NMC), licensee for the Point Beach Nuclear Plant (PBNP) Unit 2, submitted Relief Requests MR 02-004-1 and MR 02-004-2 on April 17,2002. This action is related to NMC7sresponse dated April 2,2002, to NRC Bulletin 2002-001, "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity."

The associated inspection of the Unit 2 reactor vessel head commenced on April 2 1,2002. The visual inspection showed that the head is in very good condition, with no evidence of leakage.

As a result, PBNP will not be performing any reactor vessel head repairs. Therefore, Relief Requests MR 02-004-1 and MR 02-004-2 are no longer required and their withdrawal is hereby x*&

requested.

Thomas J. Webb Regulatory Affairs Manager cc: NRC Regional Administrator NRC Project Manager NRC Resident Inspector PSCW