NRC-97-0131, Monthly Operating Rept for Nov 1997 for Fermi 2

From kanterella
(Redirected from NRC-97-0131)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1997 for Fermi 2
ML20203H350
Person / Time
Site: Fermi 
Issue date: 11/30/1997
From: Giles H, Peterson N
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-97-0131, CON-NRC-97-131 NUDOCS 9712180386
Download: ML20203H350 (4)


Text

v i

4 hf AW NWy Edison

'a;;nin""'"

w gram Reg. Guide 1.16 December 12,1997 NRC-97-0131 U. S. Nuclear Regulatory Conunission Attention: Document Control Desk Washington, D. C. 20555

Reference:

- Fermi 2

-NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Oneratine Status Report for November 1997 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for November 1997. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Ilarry Giles, at (313) 586-1522.

ll Sincerely,

[c

{

Norman K. Peterson Director -Nuclear Licensing

~

9712180386 971130 PDR ADOCK 05000341 R

PDR Enclosures cc: A. B. Beach B. L. Burgess D. R. Hahn

- G. Harris J.

, N,- lf !!

A. J. Kugler s

,n

-uuuAO M. V. Yudasz, Jr.

Region 111

l OPERATING DATA REPORT DOCKET hD, 50-341 COMPl.ETED BY

11. B. Giles DATE December 12.1922 TELEPilONE (313) 586-1522 OPERATING STATUS 1.

Unit name: Fermi 2 Notes: (1) Calculated using weighted 2.

Reporting period: November 1997 averages to reflect variations in rating 3.

Licensed thermal power (MWt): 3430 (MDC and DER) from initial commercial 4.

Nameplate rating (Gross MWe): 1215 (3) operation. (2) Design electrical rating 5.

Design elect rating (Net MWe): 1116 (2) reflects 96% reactor power, pending 6.

Max dependable cap (Gross MWe): 1147 completion of Power Uprate Program 7.

Max dependable cap (Net MWe): 1098 Testing. (3) General Electric Company Alsthom instruction manual.

8.

If changes occur in capacity ratings (items number 3 through 7) since last report, give reasons:

M%

9.

Power level to which restricted, if any (MWe Net):

(2)

10. Reasons for restriction,if any:

(2)

T Tills MONTil YEAR TO CUMULATIVE DATE I1.

Ilours in reporting period 720 8.016 86.390 12.

Ilours reactor was critical 720 5.086.2 59.510.9 13.

Reactor reserve shutdown hours 0

0 0

14.

Ilours generator on line 720 4.71LZ 56.213.7 15.

Unit reserve shutdown hours Q

Q Q

16.

Gross thermal energy gen (MWil) 2.374.416 14.634.600 172.470.011 17.

Gross elect energy gen (MWil) 836.980 5.006.140 55.454.627 18.

Net Elect energy gen (MWII) 804.616 4.787.611 52.943.100 19.

Unit service factor 100.0 58 9 65.1 20.

Unit availability factor 100.0 58.9 65.1 21.

Unit cap factor (using MDC net) 101.8 60.2 59.7 (1) 22.

Unit cap factor (using DER net) 100.1 115 55.5(1) 23d 3

23.

Unit forced outage rate Q

2fd

24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation). MM l

1

_ _ - _ _. ^ _ -.

^

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 341 UNIT Femil 2 DATE December 12.1997 COMPLETED BY H. B. Giles TELEP110NE (313)586-1522

- Month November 1997 -

DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net)

(MWe-Net) 1 1111 16 1120 2

1115 17 1126 3

1118 18 1138 4

1119 19 1144 5

1118 20 1131 6

1115 21 1116 7

1115 22 1118 8

1115 23 1118 9

1118 24 1120 10 til7 25 1115 11 1119 26 1110 12 1119 27 1117 13 1120 28 1114 14 -

1117 29 1115 15 1119 30 1117 w

F 1._

UNIT SillTIDOWNS.AND POWER REDUCrlONS DOCKET NO:

.50-341 COMPLETED BY:

11 B.Giles

~

DATE: ~

_D_e_cember 12.1997 TELEP7f0NE:

0 131586-1522 REPORT MONTI{ November 1997 No. (6)

Date.

TYPE Dur(firs)

Reason (2)

Method of shutting LER No.

Sys Code (4)

Comp Cause and Corrective Action to.

(1) down reactor or.

Code' Prevent Recurrence reducing power (3)

(5)

No power reductions in excess of '

20% of the average daily power level forthe preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> occurred during this reporting :

Period.

(1)

F: Forced.

(2)

REASON:

(3) METIIOD:

(4) Instructions for preparation of data entry sheets S: Scheduled A - Equipment Failure (Explain) 1 - Manual for Licensee Event Report (LER) file (NUREG-B - Maintenance or Test 2 - Manual Scram 1022)

C - Refueling 3 - Automatic Scram (5) Same Source as(4)

D - Regulatory Restriction 4 - Continued (6) R - Prefix indicates power reduction.

E - Operations Training and License 5 - Reduced lead S - Prefix indicated plant shutdown.

Examination 9 - Other (7) Duration of reductions reported as zero per F-Administrative Regulatory Guide 1.16, Revision 4.

G - Operational Error (Explain)

II-Other (Explain)

-..-