NRC-96-0136, Forwards Fermi 2 CR Simulator Four Yr Rept

From kanterella
Jump to navigation Jump to search
Forwards Fermi 2 CR Simulator Four Yr Rept
ML20133A226
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/19/1996
From: Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133A230 List:
References
CON-NRC-96-0136, CON-NRC-96-136 NUDOCS 9612300131
Download: ML20133A226 (3)


Text

,,

4 Dsugl2s R. Gipstn

, Senior Vice President Nuclear Generaten Detroit re nu 6400 North Dmie Highway

. Newport, MicNgan 48166 (313) 586-5249 10CFR55.45(b)(5)(ii)

Decetter 19,1996 NRC-96-0136 i

Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) Detroit Edison Letter to the NRC, "Cenification of the Fermi 2 Upgraded Simulator Facility", NRC-92-0143, December 30,1992 j'

Subject:

Fermi 2 Control Room Simulator Four Year Reoort l

In accordance with 10CFR55.45(b)(5)(ii), Detroit Edison Company her'eby submits to the Commission the Fermi 2 Control Room Simulator four year report. This report includes NRC Form 474 for Fermi 2.

If additional information is required please contact Mr. Joseph S. Sahli, Supervisor -

Nuclear Training Simulator & Training Suppon, at (313) 586-4138.

Sincerely, r

Attachments cc: A. B. Beach M. J. Jordan A. J. Kugler l

A. Vegel

)

96123o0131 961219 DR ADOCK 050003 1

{

l

(

NRC FORM 474 U.S. NUCLEAR REGULATORY COMMIS8loN APPROVED BY Out: NO. 31604134 EXPIRES: 04/3140 MOI

  • Estimated thsden per response to comply with hs mandatory Wormation collecten request 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> TNs mtormation is used to ceristy a simuisten feedity. Forward 3

comments regardmg tsurden estimate to Ino trWormation and Recoros Menegement J

SIMULATION FACILITY CERTIFICATION

&*,0"'afo 't0&8,""*" **ll"'** 3**',"m*Re' "M, e 20555 Ro

,o,e and Budget. Wasnmoton, DC 205C3 NRC may not condud or sponsor, and a person is not requ ed to respond to. e conecten at rWormeten unless a displays a currentiy w

veial oms control number 6NSTRUCTION8; This form e to De filed for rwtes certshcaten, wiJ ceuon (W requred), and for any cnonge to a simulation fecality performance testm0 plan made ofter entsee submittoi of

.ucn a pian P,.ede m. fonowino evo,m

.n and enecune app,onn. i = indeaie reason fo, suom i F ACILITY DOCKET NUMBER Fermi 2 50- 341 LiCEN$EE DATE j

The Detroit Edison Company vs. is = cecy inot 1 The above named facility locarsee is uomo a armulaien fecuny consisting solely at a pienleferenced amulator that meets the requnements of to CFR 65 45 2 Documentaten e evadable for NRC review m accorcence witn 10 CFR 55 45(D) l 3 This simulaten facphty meets the Guidance contamed m ANSVANS 3 51965 or ANSVANS 3 5-1993. es endorsed by NRC Regulatory OuideJ 149 n ine,. am any ExCEPriONs

m. cecocei.n or mis.em. CNECx NERE [ g end descnoe foisy on eddi.nei,ege. e. necesse,y See attached report r*-

A2--

A h b NAME for otner mentAcanon/ AND LOCATION OF &lMULATION FACILITY

'*V Fermi 2 Nuclear Training Simulator 6400 N. Dixie Highway Newport, Michigan 48166

)

X suutATiON rACitiTY PtRrORuaNCE TEST AssTRACTs ATTACNED rror pe,,e,mance tests conducied,n tae,enod.nc ng -la las date orta,s cerencanon)

DE$CRIPTION OF PERFORMANCE TESTING COMPLETED (Attaca acononal pages as necessery and noerety Ine nem cescnprion borne cononued)

See attached Fermi 2 Control Room Simulator Four Year Report, Attachment 1.

SNULATION FACILITY PERFORMANCE TESTING SCHEDULE ATTACHED (For the conduct of approsumerely 25* of eenbemance fests per year Ibr the abur-year penact commenc,ng uth the clare of!!ws cethcanon }

j DESCRIPTK)N OF PERFORMANCE TESTING TO BE CONDUCTED (Arracn admoonal pages as necessary and centify sne, tem assenpoon beeng canonuedj See attached Fermi 2 Control Room Simulator Four Year Report, Attachment 2.

PERFORuANCE TESTING Pt4N CaANGE rFo, any macuca on io e,e,iermance sesong ptan sue,rstled on a,,ev,ous ce4.ca.on) y DESCRIPTION OF PERFORMANCE YESTING PLAN CHANGti getaca acunonet pages as necessary and centrty the nem cosenphon bang canonuedJ See attached Fermi 2 Control Room Simulator Four Year Report for a description of new performance tests added to the testing schedule for the next four years (also includes tests deleted from the schedule).

RECERTSFLCATION (Descnbe conocbve achans taken, attach res#s of completed peribemence tesbng on accordence uth 10 CFR SS 4S(bXSXv)

(Attach each onalpages as necessary and odertiv the nem descnphon bonng cortnued)

Any,ame s.eme,e or omeson in hs acoment inciud,. oneenmems. m.y e. sue,ecno e,va and c,-nei sonet.n. i cow, uno-poney or p.riory inenne evo,..non in inis documer, and.naenm.ni. i. eue and correct

$1GNATURE - AUTHORIZED REPREpENTATIVE TITLE DATE h#

Sr. Vice President, Nuclear Generation

/ 2_- t & %

> eccareence evtn to CFR 66 6. Communicatens. the bem shell be suomitted e Ine NRC as fonows BY DELfVERY IN PERSON ONF W1 FUNT NORTH SY MAIL ADDRESSED TO DIRECTOR, OFFICE OF NUCLEAR REACTOR REGULATION TO THE NRC OFFICE AT 1103 h%satiLLE PixE U.S. NUCLEAR REGULATORY COMMl8SION RCONI.LE, MD WASHINGTON, DC 306&& 4 001 NRG FORM 474 (5-9 4 FMINIt.D ON REGYGLED PAFER