NRC-96-0036, Forwards Relief Request VR-61 for IST Program for Pumps & Valves to Implement Test Frequencies Consistent w/10CFR50, App J,Option B
| ML20101J025 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/27/1996 |
| From: | Gipson D DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-96-0036, CON-NRC-96-36 NUDOCS 9604010252 | |
| Download: ML20101J025 (5) | |
Text
Douglis R. Gipson Sentor Vice Presdent Nuclear Generation Detroit
,e, m 6400 North Dme Hghway I"
Newport. %chigan 48166 (313) 5864249 March 27,1996 NRC-96-0036 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001
References:
1)
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 i
.2)
Detroit Edison letter to NRC, " Proposed Technical Specification Change (License Amendment)- Implementation of 10 CFR 50 Appendix J Option B," NRC-95-0133, dated December 21,1995
Subject:
Relief Request for Inservice Testing Program for Pumps and Valves to Implement Test Frequencies Consistent with 10 CFR 50 Appendix J Option B Detroit Edison submitted the Reference 2 proposed License Amendment to implement 10CFR50, Appendix J, Option B When implemented, this license amendment will allow containment leakage rate test frequencies to be specified by performance-based criteria in the Primary Containment Leakage Rate Testing Program, defined in proposed Technical Specification Section 6.8.5.g. In the case of containment isolation valves, the allowable base test intervals may be increased to a maximum of 60 months. The containment isolation valves are also subject to the testing requirements of the Fermi 2 Inservice Testing Program, which in turn, is based on the requirements of Section XI of the ASME Boiler and Pressure Vessel Code, 1980 Edition through the Winter 1980 Addenda. Paragraph IWV-3422 of Subsection IWV states in part that valve leak rate tests shall be conducted at least once every 2 years. In the Implementation Plan provided in Enclosure I to the Reference 2 submittal, Detroit Edison stated that prior to using extended intervals for certain components in excess of ASME Section XI test interval limits, a relief request will be submitted and approved.
Relief Request VR-61 is attached for review and approval so that Fermi 2 can take g g g full advantage of the performance-based containment leakage test frequencies allowed 9604010252 960327 l
PDR ADOCK 05000341 p
()
. -. - -.~ -.. - -
- ~_ -
USNRC March 27,1996 NRC-96-0036 Page 2 for containment isolation valves by 10 CFR Part 50 Appendix J, Option B. In particular, reliefis requested from paragraph IWV-3422 of the applicable code to the extent that it requires leakage testing at least once every 2 years. The basis for the request is that the proposed alternative provides an acceptable level of quality and safety. This acceptable level of quality and safety has been demonstrated by the NRC at the industry-wide level as the basis for revising 10 CFR Part 50 Appendix J to include Option B. The Reference 2 proposed License Amendment reiterates the applicability of this conclusion to Fermi 2 for the purpose ofimplementing the Option B performance-based requirements. As a result, no additional documentation or justification is provided with the attached relief request to demonstrate that the i
proposed alternative provides an acceptable level of quality and safety.
It is requested that the enclosed relief request be granted concurrent with, or pnor to, 1
the approval of the proposed License Amendment submitted in Reference 2, which requested approval by August 1,1996. This would allow the new Technical Specifications and the changes to the IST program related to containment leak rate testing to be implemented at the same time prior to the beginning of RF05, which is i
scheduled to begin September 27,1996. Implementation of the new Appendix J Technical Specifications prior to the outage will allow the deferral of Type A testing that would have been required during RFOS to a future outage.
Several previously granted relief requests extending the test interval from 3 months to refueling stated that the testing during refueling would be performed as part of or concurrent with LLRTs at test intervals no greater than two years. Fermi 2 plans to revise these relief requests to retain the two-year test interval as granted by the relief requests, but using one of the accepted test methods other than the LLRTs as defined in Generic Letter 89-04 or other related regulatory guidance documents. NRC review and approval is not required for these revisions.
No commitments are being made in this letter. If you have any questions on this matter, please contact Mr. Robert Newkirk at (313) 586-4211.
Sincerely, d'
Enclosure cc: T. G. Colburn M. J. Jordan H. J.
Miller A. Vegel i
e
Enclosure to NRC-96-0036 Page1 RELIEF REQUEST NO. VR-61 SYSTEM:
SYSTEMS PENETRATING PRIMARY CONTAINMENT COMPONENT:
Valves subject to ASME Section XI, Category A Containment Isolation Valve Leakage Tests. See Table VR-61 for a list of valves to which this Relief Request applies.
CATEGORY:
A and A/C FUNCTION: The subject valves perform a containment isolation function as defined in 10CFR50, Appendix A, Criteria 55,56, and 57.
TEST REOUIREMENTS: Per IWV-3422 the subject valves shall be leak rate l
tested on a frequency of at least once every 2 years.
BASIS FOR RELIEF: 10 CFR Part 50, Appendix J, has been revised to allow licensees to implement performance-based containment leak rate test intervals in accordance with Regulatory Guide 1.163, dated September 1995. RG 1.163 endorsed, with specific exceptions, NEI 94-01, Industry Guideline for Implementing Performanced Based Option of 10CFR50, Appendix J, dated July 26,1995. Under certain conditions, the base test intervals for containment isolation valve leak rate testing may be as long as 60 months. The basis for the request is that the proposed alternative provides an acceptable level of quality and safety. This acceptable level of quality and safety has been demonstrated by the NRC at the industry-wide level as the basis for revising 10 CFR Part 50 Appendix J to include Option B. The proposed License Amendment that implements Option B reiterates the applicability of this conclusion to Fermi 2 for the purpose ofimplementing the Option B performance-based requirements.
ALTERNATE TESTING: The Containment Isolation Valves listed in Table VR-61 will be leak rate tested at frequencies specified in accordance with Reg. Guide 1.163, but at base intervals no greater than 60 months.
Enclosure to
~
Page 2 RELIEF REQUEST NO. VR-61 Table VR-61 Containment isolation Valves Valves ID Valves ID Valves ID B2100F010A El150F008 E5150F007 B2100F010B El150F009 E5150F008 B2100F076A Ell 50F016A E5150F013 B2100F076B El150F016B B2100F434 El150F021A E5150F062 B2103F016 EI150F021B E5150F084 B2103F019 Ell 50F022 B2103F022A El150F023 G1100F003 B2103F022B El150F024A G1100F019 B2103F022C El150F024B G1154F018 B2103F022D E1150F027A G1154F600 B2103F028A El150F027B B2103F028B El150F028A G3352F001 B2103F028C El150F028B G3352F004 j
B2103F028D El150F608 G3352F220 i
B3100F014A El1F412 G5100F600 B3100F014B El1F413 G5100F601 B3100F016A El1F414 G5100F602 i
B3100F016B EllF415 G5100F603 B3100F019 G5100F604 B3100F020 E2100F006A G5100F605 E2100F006B G5100F606 C1100F010 G5100F607 C1100F011 E2150F005A C1100F180 E2150F005B P1100F126 C1100F181 E4150F002 P34F401A C4100F006 E4150F003 P34F401B C4100F007 E4150F006 P34F403A E4150F075 P34F403B C5100F002A E4150F079 P34F404A C5100F002B E4150F600 P34F404B C5100F002C E41F400 P34F405A C5100F002D E41F401 P34F405B C5100F002E E41F402 P34F406A E41F403 P34F406B El100F408 P34F407
Enclosure to NRC-96-0036 Page 3 RELIEF REQUEST NO. VR-61 Table VR-61 Containment Isolation Valves Valves ID Valves ID Valves ID P34F408 T4800F420 T4901F007 P34F409 T4800F421 T4901F016 P34F410 T4800F422 T4901F465 T4800F423 T4901F468 P4400F282A T4800F424 T4901F601 P4400F282B T4800F425 T4901F602 P4400F606A T4800F426 P4400F606B T4800F427 T5000F401A P4400F607A T4800F451 T5000F401B P4400F607B T4800F453 T5000F402A P4400F615 T4800F454 T5000F402B P4400F616 T4800F455 T5000F403A T4800F456 T5000F403B P5000F603 T4800F457 T5000F404A P5000F604 T4800F458 T5000F404B T5000F405A 1
T2300F409 T4803F601 T5000F405B T2300F410 T4803F602 T5000F407A l
T2300F450A T5000F407B l
T2300F450B T4804F016A T5000F408A T4804F016B T5000F408B T4600F400 T4804F601 A T5000F420A j
l T4600F401 T4804F601B T5000F420B T4600F402 T4804F602A T5000F455 T4600F411 T4804F602B T5000F456 l
T4600F412 T4804F603A T50F412A l
T4804F603B T50F412B l
T4800F404 T4804F604A T50F450 l
T4800F405 T4804F604B T50F451 l
T4800F407 T4804F605A T50F458 T4800F408 T4804F605B T4800F409 T4804F606A T4803f410 T4804F606B T4800F416 T4800F417 T4800F418 j
T4800F419 s
- -