l Douglas n. Gipson _
Senior Vice Presdent Nuplear Generahon i
Fermi 2 6400 North (,aie Hghway Edison
-Ql3)586-5249
~~~
September 15,1995 NRC-95-0087 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D.C. 20555
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 1
- 2) NRC Notice of Service Water System Operational Performance Inspection (SWSOPI), dated August 8,1995
Subject:
SWSOPI Reauest For Reduced Scope Inspection The above referenced letter (Reference 2) discussed the NRC's intent to perform a SWSOPI at Detroit Edison's Fermi 2 plant in January of 1996 and included a documentation request. The letter also discussed a process which utilizes the results of licensee self-assessments conducted in accordance with guidance provided in NRC Inspection Procedure 40501 and for conducting a limited scope, in-depth inspection as an alternative to a full-scope NRC inspection.
The purpose of this letter is to request a reduced NRC inspection activity in the SWSOPI area of emphasis. In lieu of the full-scope NRC inspection, Detroit Edison is proposing to perform a self-assessment of the Fermi 2 Emergency Service Water Systems and the drywell cooling interface portions of the General Service Water System. This self-assessment will comply with the guidance contained in NRC inspection procedure 40501 and Temporary Instruction 2518/l18.
A follow-up letter will be sent in January of 1996 detailing the self-assessment schedule. This schedule will include the identification of the team that will 3
perform the self-assessment, a timeline for development of a detailed self-assessment plan, a proposed meeting with NRC Region III to discuss the self-
- assessment plan in detail, and the time-table for conducting the self-assessment and associated follow-up NRC activities.
l i '3 C C /t 7 9509190023 950915 PDR ADDCK 05000341 Q
PDR.
.i
-1 4
4 e-NRC-95-0087
- September 15,1995
'Page 2 Pending NRC approval, the actual self-assessment is proposed to be performed in the second quarter of 1996.
If you have any further questions regarding this letter, please contact Ken Riches, Cornpliance Engineer et (313) 586-5529.
Sincerely, cc:
T. G. Colburn 6
f.P. Pill 3 T.
Vegej Region III d
E a -