NRC-95-0087, Requests Reduced NRC Insp Activity in Svc Water Sys Operational Performance Insp Area of Emphasis

From kanterella
(Redirected from NRC-95-0087)
Jump to navigation Jump to search
Requests Reduced NRC Insp Activity in Svc Water Sys Operational Performance Insp Area of Emphasis
ML20092F885
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/15/1995
From: Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-95-0087, CON-NRC-95-87 NUDOCS 9509190023
Download: ML20092F885 (2)


Text

i..

l Douglas n. Gipson _

Senior Vice Presdent Nuplear Generahon i

Fermi 2 6400 North (,aie Hghway Edison

-Ql3)586-5249

~~~

September 15,1995 NRC-95-0087 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D.C. 20555

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 1
2) NRC Notice of Service Water System Operational Performance Inspection (SWSOPI), dated August 8,1995

Subject:

SWSOPI Reauest For Reduced Scope Inspection The above referenced letter (Reference 2) discussed the NRC's intent to perform a SWSOPI at Detroit Edison's Fermi 2 plant in January of 1996 and included a documentation request. The letter also discussed a process which utilizes the results of licensee self-assessments conducted in accordance with guidance provided in NRC Inspection Procedure 40501 and for conducting a limited scope, in-depth inspection as an alternative to a full-scope NRC inspection.

The purpose of this letter is to request a reduced NRC inspection activity in the SWSOPI area of emphasis. In lieu of the full-scope NRC inspection, Detroit Edison is proposing to perform a self-assessment of the Fermi 2 Emergency Service Water Systems and the drywell cooling interface portions of the General Service Water System. This self-assessment will comply with the guidance contained in NRC inspection procedure 40501 and Temporary Instruction 2518/l18.

A follow-up letter will be sent in January of 1996 detailing the self-assessment schedule. This schedule will include the identification of the team that will 3

perform the self-assessment, a timeline for development of a detailed self-assessment plan, a proposed meeting with NRC Region III to discuss the self-

- assessment plan in detail, and the time-table for conducting the self-assessment and associated follow-up NRC activities.

l i '3 C C /t 7 9509190023 950915 PDR ADDCK 05000341 Q

PDR.

.i

-1 4

4 e-NRC-95-0087

- September 15,1995

'Page 2 Pending NRC approval, the actual self-assessment is proposed to be performed in the second quarter of 1996.

If you have any further questions regarding this letter, please contact Ken Riches, Cornpliance Engineer et (313) 586-5529.