Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements
ML20058L670
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/09/1993
From: Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058L674 List:
References
CON-NRC-93-0143, CON-NRC-93-143 NUDOCS 9312170135
Download: ML20058L670 (8)


Text

{{#Wiki_filter:- -.... ~. ~ ~ a ,,.n- ~ - a -) Douglas R. Gipson. -] Sensor Vee President ) Nuclear Generat ort j Fermt 2 l 6400 North Dive Highway l Newport,IAct) gan 48166 i Ot315E65249 December 9,~ 1993-NRC-93-01431 y -{ U. S.-Nuclear Regulatory Commission 1 Attn: Document Control' Desk I Washington, D. C. 20555

/

Reference:

EnricoFerai.AtomicPower. Plant,jUnit1' NRC Docket No.~ 50-16. J 'NRC Possession-Only License No. DPR-9 j

Subject:

Proposed Technical Specification Change'(License - Amendment) - Implementation-of Revised 10CFR20 - 1 Pursuant.to 10CFR50.90, Detroit' Edison Company lhereby' proposes.to. .I amend Possession-Only License DPR-9 for the Ferai 1: plant byf 1 incorporating the~ enclosed changes-into the Plant Technical j ~ Specifications. ~The proposed change supports.Fermill; compliance with'- El 'the new requirements of 10CFR20. Ferait1 isicurrently scheduled _to j fully implement the requirements of the new110CFR20 on~ January;1,;

i 1994. Until such time as the license amendment:is : issued.by :the-NRC,1 Detroit Edison will follow the implementation requirements of._

d 10CFR20.1008. i [. t Detroit Edison has evaluated'the proposed Technical-Specifibations j against the criteria of 10CFR50 92 and 10CFR51.22 and.has determined j that no significant _ hazards consideration ~is involved and the-l requirements for a categorical exclusion are set (Enclosure 1).: The marked up pages of the_ Technical Specifications are presented ini. ~ i .':la The Fermi 1 Review Committee has reviewed:the' proposed Tedhnical: Specification changes ~and has. approved the. enclosed-determinations.. j In accordance with 10CFR50.91,-Detroit Edison has provided_a copy of.- 1 this letter to the-State of Michigan._ ~ 1q If you have any-questions, please contact Evelyn F.'Madsen at:(313) 586-4205.

a l

Sincerely,_ a p1' Enclosures (2) . 9' cc: T. G. Colburn W. J. Kropp. J. B. Martin .-/ f. M. P. Phillips- -/ Op'. C. L. Pittiglio

1. 50 ^ ~. GSupervisor, Electric Operators,iNichigan 7 I}i'y

/ Pohlie Service Commission'- J. Re Padgett-g21g{gg 9 P PDRE -L _m ; w. . z

3 USNRC . December 9, 1993.' i NRC-93-0143-Page 2 i i .:s 1 I l t I, DOUGLAS R. GIPSON, do hereby affirm that the foregoing. ) statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief. l l t 4 l DOUGLAS R. GIPSON-Senior Vice President-l f On this day of 4 4 M, 1993, before me-l personally appeared Douglas R. Gipson,, being first duly sworn and: j says that he executed the foregoing as his free act-and deed. - $M Notary Public-l l lO% LIE A AkMEITA NOTARYPUDUCSTATE OFMICHICAN j MONPD3 CD1NTY. - MY CDWariOM EXP.NOV. 20AM5 i {- L l l l

  • 0 F

L

Enclo;ure 1 to NRC-93-0143 Page 1 INTRODUCTION On May 21, 1991, the Nuclear Regulatory Commission (NRC) issued a-revision to its standards for protection against ionizing radiation, 10CFR Part 20.. The purpose of the revision to 10CFR20 was.to: modify; the NRC's radiation protection standards to reflect developments in-the principles and scientific knowledge underlying radiation. protection and to reflect changes in-the basic philosophy of radiation protection. In addition, the revision addresses International Radiation Protection Standards in order to achieve a better level of uniformity with the requirements of other nations. The revised Part'20 becane effective on' June 20,.1991; however, in' accordance with more recent provisions, licensees may defer implementation of the revised _ rule until January 1,1994. The new requirements are currently scheduled.to be implemented at: Fermi 1 on January 1,1994. This proposal involves changes to Fermi 1 Technical Specifications to reflect implementation of the revised Part 20 at Fermi 1. EVALUATION The following changes to the Fermi 1 Technical Specifications are' being proposed:

1) Definition A.2, Protected Area is being revised to conform to the definition of this term as provided in Section 20.1003 This change is administrative-in nature. to incorporate the corresponding new 10 CFR Part 20 definition..
2) Technical Specification F, Waste Disposal Surveillances,:

Items 1 and 2 are being revised to provide proper references to 10 CFR 20 as a result of the new table number.: Specifically, the Specification'is-being revised to reference Appendix B, Table 2, as opposed to the currently referenced Table II. This change is administrative in nature to incorporate the. corresponding new 10CFR20 table number.. t

I l Enclorurs 1 to NRC-93-0143 l Page 2 SIGNIFICANT HAZARDS CONSIDERATION In accordance with 10CFR50.92, Detroit Edison has made a determination j that the proposed amendment involves no significant hazards j considerations. To make this determination, Detroit Edison must i establish that in the SAFSTOR mode, operation in accordance with the proposed amendment would not: l

1) involve a significant increase in the probability or consequences of an accident previously. evaluated, or l

l

2) create the possibility.of a new or different kind of accident from any accident previously evaluated, or l
3) involve a significant reduction in a margin of safety.

The proposed changes to revise the definition-and the waste disposal surveillances to ensure consistency with 10CFR20 and to recognize the new Section and table numbers do not:

1) Involve a significant increase in the probability or consequences of an acc.' dent previously evaluated.-

The proposed changes are administrative in natureLand.do not impact the SAFSTOR status or design of any plant structures, systems or components. As a result, this proposed change I cannot increase the probability or the consequences of any a::cident previously evaluated.

2) Create the possibility of a new or different kind of accident' from any accident previously evaluated.

The proposed changes do not affect'the plant SAFSTOR status ( as defined.. As a result, the proposed changes cannot create' the possibility of a new or different kind of' accident from any accident previously evaluated. t

3) Involve a significant reduction in a margin of safety.

~ ~ The proposed changes do not affect the plant SAFSTOR status. The changes will not. increase the amounts or change the types of effluents that may be released offsite. These changes only ensure compliance with revised 10CFR20.- These^ changes.- 1 do not alter any of the requirements'or responsibilities.for protection of the public against radiation hazards. As a result, these changes do not reduce the. margin of' safety. , i ) i d i l 'l 1 m e

Enclo ura 1 to NRc-93-0143 Page 3 ENVIRONMENTAL IMPACT i Detroit Edison has reviewed the proposed Technical. Specification. changes against the criteria of 10CFR51.22 for environmental considerations. The proposed changes do'not involve a significant hazards consideration, nor 'significantly change the types or significantly increase the' amounts of effluents that may be' released offsite, nor significantly increase individual or cumulative ' occupational radiation exposures. The net effect of the changes to.the waste disposal surveillances fori liquid and gaseous effluents is to maintain effluent controls at; current levels. Therefore, the proposed changes meetithe criteria ~ of - 10CFR 51.22(c)(9) for a categorical exclusion from an ' environmental - analysis or environmental impact statement. l CONCLUSION Based on the evaluation above:

1) there is reasonable assurance that the health andfsafety.of i

the public will not be endangered by maintaining SAFSTOR- ~ status in the proposed manner, ~ and

2) such activities will be conducted in' compliance with'the:

Commission's regulations and the proposed amendment will not l be inimical to the common defense and security or to the:- health and safety of the public. l l \\ l t r

h i

l 1 i

e to NRC-93-0143 oqPage 1 cen aer UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION ,{ .,i wAse== crow, o.c.seses '. \\s..../ THE DETROIT EDISON COMPANY DOCKET NO. 50-16 ENRICO FERMI ATOMIC POWER PLANT UNIT N0. 1 RENEWAL OF POSSESSION-0NLY LICENSE i Amendment No. # 1 1 License No. DRP-9 j 1. The Nuclear Regulatory Cosunission (the Commission) has found that: l A. The application for amendment filed by Detroit Edison Company i 3 (the licensee), dated May 17, 1985 as supplemented by letters dated i July 23, 1986, September 15, 1986, September 25, 1987, September 15, l l 1988 and December 22, 1988 cosplies with the-standards and require-i ments of the Atomic Energy Act of 1954, as amended -(the Ar.t), and i the Cosatission's regulations as set forth in-10-CFR Chapter-I-B. The facility will be maintained in conformity with the' application, i the provisions of the Act, and the regulations of the Commission; U { 5 C. There is reasonable assurance: (1) that the activities authorized by this possession-only license can be conducted without endangering. the health and safety of the public, and (ii) that such; activities l will be conducted in compliance with the Commission's. regulations { set forth in 10 CFR Chapter I; e } D. The licensee is-technically and financially qualified to engage in-the activities authorized by this amended license in accordance with j the rules and regulations of the Cossnission;. 4 E. The licensee has satisfied the applicable provisions of 10 CFR Part 140, " Financial Protection Requirements and Indemnity Agreements" of the Commission's regulations; t F. The issuance of this license will not be 1'nimical to tihe conson-i defense and security or to.the health and safety of the_ public;; ) F i G. The issuance of this license is in accordance with 10 CFR Part 51'of-I the Comunission's regulations and all applicable requirements have been satisfied; and - -l j H. The possession and. storage of byproduct material as authorized by.- i this amended license will be in accordance with the Commission's. j regulations in 10 CFR Part 30 including 10 CFR'Section 30.33;; j j .i l i

~ ^ . ' '.; ^ ~.... TT T..,. f ' Enclosure 2'to l NRC-93-0143 Page 2 k \\ j 2. Accordingly, Possession-Only License No. DPR-9 is hereby amended in its a j entirety to read as follows: j A. This amended license applies to the Enrico Fermi Atomic Power Plant, i l-Unit No.1 ( the facility)-owned by The Detroit Edison Compaety.,The facility is located at Lagoona Beach Frenchtown-Township, Monroe, i Michigan and is described in the application for renewal: dated May 17, i 1985 as supplemented by letters dated July 23, 1986, September 15, i 1986, September 25, 1987, September. 15, 1988 and December 22, 1988. -l l l B. Subject to the conditions and requirements' incorporated.hetein, the ] Cosuiission hereby licenses The Detroit Edison Company: 3 } i (1) Pursuant to Section 104c of the Act and 10 CFR Part 50, j " Domestic Licensing of Production and Utilization Facilities" to possess but not to operate the facility. (2) Pursuant to the Act and 10 CFR'Part 30, " Rules of General i i Applicability to Domestic Licensing ~ of. Byproduct Material" to possess,' but not to separate, such byproduct material as j may have been produced by operation'of the. reactor. i l C. This license shall be deemed to contain and is subject to the conditions' l j specified in Part 20, Section 50.59 of-Part 50 Section 30,34 of Part 30, of 10 CFR Chapter I, and.is subject to all applicable provisions of.the i a l Act, and to the rules, regulations and orders of the Commission now or. i hereafter in effect, and is subject to the additional condition l k specified below: ) l (1) The Technical Specifications contained in Appendix-A as. } revised through Amendment No.gare hereby incorporated in-1 this license. The-licensee shall maintain:the-facility in-j accordance with the Technical Specifications. ~ { D. This license is effective as of date of issuance and shall expire on j March 20, 2025. 4 FOR THE NUCLEAR REGULATORY COMISSION i N W Gary M. Hola an Acting Director' I j Division of Reactor' Projects -;III, IV,. 4 Y and Special-Projects'- Office of Nuclear Reactor Regulation. 1

Enclosure:

i Appendix A Technical [ Specifications I DATE OF ISSUANCE: April 28, 1989 i I , -- a.

1 , to j

  • NRC-93-0143 Page 3

\\ ENCLOSURETOLICENSEAMENDNENTNO./'- j FACILITY LICENSE NO. DPR-9 i DOCKET N0. 50-16 i Replace all of the pages of the Appendix A Technical Specifications with the l enclosed pages. l D 1 i e m.,en.py. w<,- -,A.,g 9 - 4. __,g. ,}}