NRC-93-0033, Forwards Rev 6 to Updated FSAR Containing Changes from Approval of TS Amend 87 & Fermi 2 Safety Evaluation Summary Rept

From kanterella
(Redirected from NRC-93-0033)
Jump to navigation Jump to search
Forwards Rev 6 to Updated FSAR Containing Changes from Approval of TS Amend 87 & Fermi 2 Safety Evaluation Summary Rept
ML20036A700
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/07/1993
From: Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20036A701 List:
References
CON-NRC-93-0033, CON-NRC-93-33 NUDOCS 9305130168
Download: ML20036A700 (3)


Text

m

.r oe'nt e

Nuclear Operato,s M

Fermi 2 50 eIp:

hh eId Nuclear a

lg (313) m t325 Operations May 7, 1993 NRC-93-0033 f

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

Reference:

Fermi 2 L

NRC Docket No. 50-341 i

l NRC 1.icense No. NPF-43

Subject:

Submittal of Revision 6 to the Fermi 2 l

Updated Final Safety Analysis Report i

and the Annual 10 CFR 50.59 Safety Evaluation Summary Report Pursuant to 10 CFR 50.71(e) and 10 CFR 50.59(b)(2), Detroit Edison hereby submits Revision 6 to the Updated Final Safety Analysis Report (UFSAR) for Fermi 2 and the annual Safety Evaluation Summary t

Report.

The signed original and ten additional copies of the UFSAR, Revision 6, are enclosed; one copy will be submitted to Region III and one copy i

to the NRC Resident Inspector. 'Ihe UFSAR contains changes made since submittal of Revision 5 in March 1992 and, as a minimum, describes the plant configuration through November 7, 1992. Changes associated with

[

Revision 6 are annotated by revision bars in the' appropriate margin marked with a "6".

All revised pages are marked Rev. 6 3/93 or Rev. 6 r

4/93 The discussion of the changes to the Quality Assurance Program is being sent under separate cover.

UFSAR, Revision 6, contains the changes resulting from the approval of Fermi 2 Technical Specifications Amendment 87. Amendment 87 authorized Detroit Edison to increase the maximum reactor core p,ver level from 3293 Mwt to 3430 Mwt.

r Also enclosed is the annual Safety Evaluation Summary Report

[

r i

containing a brief description of changes to plant design, procedures, tests, experiments, and the UPSAR.

'k 4 /, "

02.

oC g5130168930507 g

ADOCK 05000341 i

PDR i

-T USNRC 4

May 7. 1993 NRC-93-0033 Page 2 If you have any questions, please contact Evelyn F. Madsen at I

(313) 586-4205.

Sincerely, i

Enclosures (2) cc:

T. G. Colburn A. B. Davis W. J. Kropp (w/ enclosures)

M. P. Phillips (w/ enclosures)

I P

I r

t I

i

.. ~.

t i

i

.e USNRC May 7, 1993 i

NRC-93-oo33 l

Page 3 i

i i

f I

i I

s I, D. R. GIPSON, do hereby affirm that, the foregoing statements are l

based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

r l

i

.n l

/

~

e4~

l D. R. GIPSON Senior Vice President 5

~

4 1993, before me On this day of v

]

personallyappearedD.R.Gipson,beinggirstdulyswornandsays that he executed the foregoing as his free act and deed.

i 1

I JLlL&

Al d bL Notary Public j

l i

t l

+

d kOSAUL A AAMETIA NOTARY PUBUCSTATE OFMlODhN i

MONROICDUNTY MY CA&fFEMN EU. NOV. 20.1095 i

I a

l l

J i

.