NRC-93-0033, Forwards Rev 6 to Updated FSAR Containing Changes from Approval of TS Amend 87 & Fermi 2 Safety Evaluation Summary Rept
| ML20036A700 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/07/1993 |
| From: | Gipson D DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20036A701 | List: |
| References | |
| CON-NRC-93-0033, CON-NRC-93-33 NUDOCS 9305130168 | |
| Download: ML20036A700 (3) | |
Text
m
.r oe'nt e
Nuclear Operato,s M
Fermi 2 50 eIp:
hh eId Nuclear a
lg (313) m t325 Operations May 7, 1993 NRC-93-0033 f
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
Reference:
Fermi 2 L
NRC Docket No. 50-341 i
l NRC 1.icense No. NPF-43
Subject:
Submittal of Revision 6 to the Fermi 2 l
Updated Final Safety Analysis Report i
and the Annual 10 CFR 50.59 Safety Evaluation Summary Report Pursuant to 10 CFR 50.71(e) and 10 CFR 50.59(b)(2), Detroit Edison hereby submits Revision 6 to the Updated Final Safety Analysis Report (UFSAR) for Fermi 2 and the annual Safety Evaluation Summary t
Report.
The signed original and ten additional copies of the UFSAR, Revision 6, are enclosed; one copy will be submitted to Region III and one copy i
to the NRC Resident Inspector. 'Ihe UFSAR contains changes made since submittal of Revision 5 in March 1992 and, as a minimum, describes the plant configuration through November 7, 1992. Changes associated with
[
Revision 6 are annotated by revision bars in the' appropriate margin marked with a "6".
All revised pages are marked Rev. 6 3/93 or Rev. 6 r
4/93 The discussion of the changes to the Quality Assurance Program is being sent under separate cover.
UFSAR, Revision 6, contains the changes resulting from the approval of Fermi 2 Technical Specifications Amendment 87. Amendment 87 authorized Detroit Edison to increase the maximum reactor core p,ver level from 3293 Mwt to 3430 Mwt.
r Also enclosed is the annual Safety Evaluation Summary Report
[
r i
containing a brief description of changes to plant design, procedures, tests, experiments, and the UPSAR.
'k 4 /, "
02.
oC g5130168930507 g
ADOCK 05000341 i
PDR i
-T USNRC 4
May 7. 1993 NRC-93-0033 Page 2 If you have any questions, please contact Evelyn F. Madsen at I
(313) 586-4205.
Sincerely, i
Enclosures (2) cc:
T. G. Colburn A. B. Davis W. J. Kropp (w/ enclosures)
M. P. Phillips (w/ enclosures)
I P
I r
t I
i
.. ~.
t i
i
.e USNRC May 7, 1993 i
NRC-93-oo33 l
Page 3 i
i i
f I
i I
s I, D. R. GIPSON, do hereby affirm that, the foregoing statements are l
based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
r l
i
.n l
/
~
e4~
l D. R. GIPSON Senior Vice President 5
~
4 1993, before me On this day of v
]
personallyappearedD.R.Gipson,beinggirstdulyswornandsays that he executed the foregoing as his free act and deed.
i 1
I JLlL&
Al d bL Notary Public j
l i
t l
+
d kOSAUL A AAMETIA NOTARY PUBUCSTATE OFMlODhN i
MONROICDUNTY MY CA&fFEMN EU. NOV. 20.1095 i
I a
l l
J i
.