NRC-91-0135, Monthly Operating Rept for Oct 1991 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1991 for Fermi 2
ML20086A920
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/31/1991
From: Orser W, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-91-0135, CON-NRC-91-135 NUDOCS 9111190430
Download: ML20086A920 (4)


Text

- - . . - -

,- l l

I

..- E08v$.E/s. dent .g De}roit- r- m CiSOn EOF" "*8

  • 1 '6 m E ML November 15, 1991 NRC-91-0135 U. : S. Nuclear . Regulatory Commission

-Attention: Document Control Desk Washington, D.C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for October, 1991 Enclosed for_your information and use is the Fermi-2 Monthly Operating Status Report for October,1991. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical  !

Specification 6.9.1.6.

If you have any questions, please contact Brian Stone, at (313) 586-5148.

Sincerely, Enclosure cc: A. D. Davis J. R. Eckert D. R. Hahn R. W. DeFayette J. F. Stang

5. Stasek-i: f,60001 9111190430 911031 PDR ADOCK 05000341 R PDR 16.W

'It

. l OPERATING DATA REPORT I

i DOCKET NO. 50-341 . _ _

COMPLETED BY B. J. Stone DATE November 15,19]j TELEPHONE (313) 586-5148 OPERATING STATUS

1. UNIT NAME: Fermi 2 l Notes: (1) Calculated using l
2. REPORTING PERIOD: October, 1991 l weighted averages to reflect l 3 LICENSED THERMAL POWER (MWt): 3293 1 vari ions in HDC. l
4. NAMEPLATE RATING (GROSS MWe): 1154 l l S. DESIGN ELECT RATING (Net MWe): 1093 I I
6. MAX DEPENDABLE CAP (GROSS MWe):1110 l l
7. MAX DEPENDABLE CAP (Net KWe):1060 l l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: N/A 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): N/A
10. REASONS FOR RESTRICTION, IF ANY:

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 745 7,296 33,062
12. HRS REACTOR WAS CRITICAL 745 5,498.7 24,016.4
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0
14. HOURS GENERATOR ON-LINE 745 5,239.3 22,797.7
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0
16. GROSS THERMAL ENERGY GEN (MWH) 2,431,152 15,675,237 67,506,431
17. GROSS ELECT ENERGY GEN (MWH) 827,680 5,113,960 22,288,497
18. NET ELECT ENERGY GEN (HWH) 792,491 4,876,163 21,287,457
19. UNIT SERVICE FACTOR 100 71.8 69.0
20. UNIT AVAILABILITY FACTOR 100 71.8 69.0
21. UNIT CAP FACTOR (USING MDC NET) 100.4 63.2(1) 60.0(1)
22. UNIT CAP FACTOR (USING DER NET) 97 3 61.1 58.9
23. UNIT FORCED OUTAGE RATE O 1.4 9.6
24. SHUTDCilNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A ,
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 1

AVERAGE' DAILY UNIT POWE'R LEVEL - >

^

s-DOCKET NO. 50-341 UNIT FERMI 2' t

DATE November 15.-1991-COMPLETED BY -E. Dawson TELEPHONE (313) 586-5027 Month' -October, 1991 DAY AVERAGE' DAILY POWER LEVEL DAY AVERAGE' DAILY POWER. LEVEL:

(MWe-Net) (MWe-Net) 1 1069 17 1u79 2 1060- 18 1076 3 1068 19 881-4 1064 2u 1087 5 1066- 21 1080 6 1081 22 1073 7 1082 23 1065 8 1075 24 1063-

-9 1068 25 1062 10 -1076 26 1064 11 1081 27 1009 12 1081 28 . _ 1073 13- 1084 29 1073 14 1075 30 1075 15 1082 31 1080 16 1088 4

l y ,-

I -

. I t

UNIT SHUTNTWS AND POWER REDUCTIONS i DATE No w e**=? e 15, 1991 .

DOCMET NO. 50-3A-COMPLETE 9 BV B. J. Stone UNIT NAME Fermi 2 TELEPHONE (313) 580-5149

(

REPORT MONTH October, 1991 1 1 I I I I i i I l i

1 I I i 1 METHOD OF LER l SV' I COMP l CAUSE & CORRECTIVE i 1 '

hO. l CO r i CODE I ACTION TO P9 EVENT 1 i NO. 1 OATE TVPE l DUR l REASON l SHUTTING DOw% RECURRENCE l (1) I (HRS)$ (2) l THE REACTOR I l (4s 1 (5) 1 i " '

(3) I l 1 i (s) t

_. i l - ------- -------- -l I

i NONE - -

i f 1 t

i i i

l i i l l i _

(3) METHOD: (4) ExMIBIT C - INSTRUCTIONS f (1) F: FORCED (2) REASONr 1 - MANUAL FOR PREPARATION OF DATA S: SCHEDULED A - EQUIPMENT FAILURE ( EAP' AIN) ENTRY SHEETS FOR 8 ICENSEE B - PAINTENANCE OR TEST 2 - MANUAL $*.k

  • M 3 - AUTOMATIC 5 CRAM EVENT REPORT (LER) FILE C - REFUELING 4 - CONTINUED (k'JR EG- 0161 )

O - REGULATORV RESTRICTION E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR ( EX PLA IN) (S) E*HIBIT 1 - SAME SOvaCE H - OTHER (EXRLAIN)

(6) R - PREFIX INOICATES POmER REDUCTION.

S - PREFIX INDICATES PLANT SHUTDOWN.

1

- p _