Responds to NRC Bulletin 85-003,Suppl 1 Re safety-related motor-operated Valves in HPCI & RCIC Sys.Final Rept for Testing of Valves Program Will Be Submitted by 880725.Util Will Also Respond to BWR Owners Group Response to Bulletin
ML20155G127
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/03/1988
From: Sylvia B
DETROIT EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CON-NRC-88-0146, CON-NRC-88-146 IEB-88-003, IEB-88-3, NUDOCS 8806170171
Download: ML20155G127 (2)


Text

-

.- 4 7.g b

B. Ralph Sylvia 8

Senor Vice President

Edison. 6400 North Dme H9hway "m-June 3, 1988 NRC-88-0146 U. S. Nuclear Regulatory Commission Attn:. Document Control Desk Washington, D. C.

20555

References:

1)

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 2)~

Detroit Edison Letter to the NRC, "IE Bulletin 85-03 Updated Response RCIC Valve F012",

NRC-88-0084, dated April 8,1988 3)

Detroit Edison Letter to the NRC, "Additional Information Regarding IE Bulletin 85-03",

NRC-88-0142, dated May 4, 1988 4)

NRC Bulletin No. 85-03, Supplement 1:

Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, dated April 27, 1988.

Subject:

Response to NRC Bulletin No. 85-03, Supp?: ment 1 Detroit FAisen has tested, with two exceptions, all safety-related

.aotor-operated valves in the High Pre'ssure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) systems discussed in Supplement 1 to the NRC Bulletin 85-03 (Reference 4).

The two exceptions are _(i) RCIC water valve E5150F012 which has been de-energized per Reference 2 and will not be tested and, (ii) RCIC steam valve E5150F059 which has been deleted from testing program per Reference 3.

Fermi 2 does not have a High Pressure Core Spray (HPCS) system.

The testing included all applicable motor-operated valves as required by Bulletin 85-03.

The test program conducted to date has measured MOV performance at the required torque switch settings of both opening l

and closing strokes. The final report for this program is scheduled to be submitted by July 25, 1988.

[

l 8806170171 880603 i

PDR ADOCK 05000341 g

g O

DCD i

\\

r..-

,f-Ri

.USNRC June 3, 1988 NRC-88-0146 Page 2 a

' Additionally Detroit Edison is participating in the BWROG Bulletin.

85-03 program in developing a response to the inadvertent' valve mispositioning issue described in Supplement 1 to Bulletin 85-03. ' A response to this issue will be provided af ter. completion of BWROG evaluation of Supplement 1 to Bulletin 85-03.

If you have any questions, please call Mr. G. S. Shukla at (313) 586-4270..

Sincerely, cc: Mr. A. B. Davis Mr. R. C. Knop Mr. T. R. Quay Mr. W. G. Rogers y

..~