NRC-87-0030, Forwards List of Individuals Holding Operating License W/O Completing 1985 Cycle 3 Training or Substitute Training. Individuals Will Be Examined on Matl in Substituted Training & Will Receive Addl Training.List Withheld (Ref 10CFR2.790)
| ML20206H837 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/10/1987 |
| From: | Agosti F DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19292H123 | List: |
| References | |
| CON-NRC-87-0030, CON-NRC-87-30 CAL-RIII-87-03, CAL-RIII-87-3, NUDOCS 8704150456 | |
| Download: ML20206H837 (2) | |
Text
- - - _.
N t DOITOil r.rmia 6400 North Dixie R Edison awe ghway 5:1.
April 10,1987 NRC-87-0030
' U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
- 2) Confirmatory Action Letter.
CAL-RIII-87-03 from A. Bert Davis to Detroit Edison dated April 3.1987
- 3) Detroit Edison Letter. NRC 87-0026 to NRC dated April 7,1987
Subject:
Licensed Operator Qualification Program On April 3,1987, a meeting was held with NRC Regional Representatives to discuss the Detroit Edison Operator Requalification Program. The emphasis of the meeting focused on Licensed Operators and Cycle 3 Training. As a result of this meeting, a Confirmatory Action Letter (Reference 2) was issued.
Reference 3 provided Detroit Edison's response which committed that on-shift Licensed Operators would receive additional training in the current Cycle 3 Requalification Program which will be completed by May 15, 1987.
In discussing Reference 3 with Region III. additional information was requested regarding all other personnel holding an Operating License who did not complete the 1985 Cycle 3 Training or Substitute Training. Attachment 1 identifies those individuals by name. These individuals will be examined on the material covered in the substituted training and will receive additional training in current Cycle 3 Requalification Program which will be completed by May 15, 1987.
Pursuant to 10CFR 2.790 A (6). Detroit Edison requests that this attachment be withheld from Public Disclosure.
@h
$41$$o$kE50bh1 l[
P
J..
~
A USNRC April 10, 1987 o
NRC-87-0030 Page 2 If you have any questions please contact Mr. Steve Frost at (313) 586-4210.
Sincerely,
'd ec:
Mr. A. B. Davis
- Mr. E. G. Greenman*
Mr. W. G. Rogers Mr. J. J. Stefano USNRC Region III (with attachment *)-