NRC-2021-0125, Comment (22) of Hal Bauer on Holtec Decommissioning International, LLC; Indian Point Nuclear Generating, Units 1, 2, and 3;Post-Shutdown Decommissioning Activities Report

From kanterella
(Redirected from NRC-2021-0125)
Jump to navigation Jump to search
Comment (22) of Hal Bauer on Holtec Decommissioning International, LLC; Indian Point Nuclear Generating, Units 1, 2, and 3;Post-Shutdown Decommissioning Activities Report
ML21301A013
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/21/2021
From: Bauer H
- No Known Affiliation
To:
Office of Administration
References
86FR37346 00022, NRC-2021-0125
Download: ML21301A013 (1)


Text

10/21/21, 1:20 PM blob:https://www.fdms.gov/0537c147-a8c9-44fd-b54d-a9a266860fc1 blob:https://www.fdms.gov/0537c147-a8c9-44fd-b54d-a9a266860fc1 1/1 PUBLIC SUBMISSION As of: 10/21/21 1:19 PM Received: October 21, 2021 Status: Pending_Post Tracking No. kv1-4vjt-wwmq Comments Due: October 22, 2021 Submission Type: Web Docket: NRC-2021-0125 Holtec Decommissioning International, LLC Indian Point Nuclear Generating, Unit Nos. 1, 2, and 3 Post-Shutdown Decommissioning Activities Report Comment On: NRC-2021-0125-0002 Holtec Decommissioning International, LLC; Indian Point Nuclear Generating, Unit Nos. 1, 2, and 3; Post-Shutdown Decommissioning Activities Report Document: NRC-2021-0125-DRAFT-0025 Comment on FR Doc # 2021-15068 Submitter Information Name: Hal Bauer, Ph.D Address:

Wayland, NY, 14572 Email:hbauer@frontiernet.net Phone:15853352623 General Comment Holtecs Plan (PSDAR) gives woefully inadequate or non-existent treatment to key safety and financial issues affecting the New York Metropolitan Area.
1) Visual inspection of canisters is inadequate. Pressure monitors, etc. are needed. Maintaining, monitoring and retrievable are part of a safe design, given explosive hydrogen risks.
2) SNF walls of 1/2" are too thin! 10"-20" are better in hardened buildings.
3) HBU fuel is hotter and riskier to rush.
4) Site remediation in PSDAR into the Hudson and groundwater is inadequate.
5) Radiation monitoring on and off site is inadequate.
6) Earthquate and Pipeline (42" High pressure Algonquin) risks aren't adequately considered.
7) Emergency planning and response is inadequate. Think Fukashima, Japan's underestimates.

8)Transport: Barge through metro NYC? Aging infrastructure for roads, bridges, overpasses and tunnels all present great hazards.

9) Native and minority communities seem disproportionately effected. Interim storage? Please think deeply.
10) Stop License Extensions for Nuclear harvesting for decades, now.
11) Once Holtec takes the $2.3 B DTrustFund there is no transparency with a privately held company.

SUNI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Richard Guzman, Mary Neely Comment (22) Doc. 0002 Publication Date:

7/15/2021 Citation: 86 FR 37346