NRC-2015-0171, Comment (1) of Erica Gray on Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
ML15244A398 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 08/20/2015 |
From: | Gray E - No Known Affiliation |
To: | Rules, Announcements, and Directives Branch |
References | |
80FR43123 00001, NRC-2015-0171 | |
Download: ML15244A398 (2) | |
Text
RC -2015-0171 -D RAFT-0001 .htmlI 8/2/2~N 8/25/201,5A As of: 8/25/15 4:19 PM Rirpivpd". Aiirnigt 90* 90(11 PUBLIC SUBM ISSION ....... PendingPost*'...,..
Status:
Tracking No. ljz-8ko2-hzal Comments Due: August 20, 20115 Submission Type: Web Docket: NRC-20 15-0171 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Comment On: NRC-2015-0171-0001 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Document: NRC-20 15-017 1-DRAFT-000 1 Comment on FR Doc # 2015-17651 k/~v~ /9-~3 Submitter Information N
Name: Erica Gray Address: II 406 Glendale Dr.
Henrico, VA, 23229 N)
Email: veggielady@yahoo. corn u-i General Comment Re:Virginia Electric and Power Company, Docket Nos. 50-280 and 50-281, Surry Power Station, Unit Nos. 1 and 2, Surry County, Virginia When the numbers don't work anymore, just change them ... .seems to be the name of the game. _
The same changes are being made for North Anna Power station as well.
The extension of the temperature axes from 400F to 650F on Figures 3.1-1 and 3.1-2 .
is appropriate since the region of Acceptable Operation includes a maximum .,d temperature corresponding to the reactor vessel design temperature of 650 *F, which ~ o. '
bounds temperatures up to RCS full power operation (nominally 573F).
With the extension of the pressure axes from 0 psig to -14.70 psig, the region of ** L Acceptable Operation includes a pressure range from -14.70 psig up to the maximum .* <
pressure set by the existing limit curves. The extension of the pressure axes to .
-14.70 psig on Figures 3.1-1 and 3.1-2 is appropriate to bound RCS conditions to U, "K support vacuum-assist fill of the RCS loops. The extension of the pressure axes is also E2 .
appropriate since vacuum-assist fill of the RCS loops, which is discussed in the Basis of U, J- u TS 3.17, Loop Stop Valve Operation, is an RCS loop fill option addressed in the Surry RCS fill operating procedures.
fi e:lllC :/Users/CAG/D ownloads/N RC-201 5-0171 -DRAFT-0001 .htmll/ 1/2
8/25/201.5 . NRC-2015-0171-DRAFT-OOO1 .htlmI http ://pbadupws. nrc. gov/docs/ML 141 6/ML14160A607. pdf file:///C:lUsersIOAG/Downloads/NRC-2015-0171-DRAFT-OOO1.html 2122