NRC-2014-0107, FRN - Browns Ferry, Units 1, 2, and 3, Confirmatory Order

From kanterella
(Redirected from NRC-2014-0107)
Jump to navigation Jump to search
FRN - Browns Ferry, Units 1, 2, and 3, Confirmatory Order
ML14121A591
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 05/01/2014
From: Wert L D
NRC/RGN-II
To:
References
EA-14-005, NRC-2014-0107
Download: ML14121A591 (20)


Text

[7590-01-P]

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-259, 50-260, 50-296; License Nos. DPR-33, DPR-52, DPR-68; EA-14-005; NRC-2014-0107]

In the Matter of Tennessee Valley Authority, Browns Ferry Nuclear Plant, Units 1, 2, and 3

AGENCY: Nuclear Regulatory Commission.

ACTION: Confirmatory order; issuance.

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) is issuing a confirmatory order to Tennessee Valley Authority (TVA or Licensee), the holder of License Nos. DPR-33, DPR-52, DPR-68, authorizing the operation of Browns Ferry Nuclear Plant, Units 1, 2, and 3. The facility

is located on the Licensee's site in Athens, Alabama. The order was a result of Alternative

Dispute Resolution between the NRC and TVA, and required TVA to complete a number of

corrective actions to address the submittal of information to the NRC that was not complete and

accurate in all material respects, and to address TVA's change to a license condition without

submitting an amendment request. The order is related to control room staffing levels that were

not sufficient to implement certain fire response procedures and achieve safe shutdown on the

three-unit site during a postulated fire event.

2 DATES: Issue Date: May 1, 2014.

ADDRESSES:

Please refer to Docket ID NRC-2014-0107 when contacting the NRC about the availability of information regarding this document. You may access publicly-available information related to this action by the following methods:

  • Federal Rulemaking Web Site:

Go to http://www.regulations.gov and search for Docket ID NRC-2014-0107. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-3422; e-mail:

Carol.Gallagher@nrc.gov. For questions about this Order, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this

document.

  • NRC's Agencywide Documents Access and Management System (ADAMS):

You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "

ADAMS Public Documents" and then select "

Begin Web-based ADAMS Search

." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The Order is available in ADAMS under Accession No. ML14121A519.

  • NRC's PDR:

You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT:

Carolyn Evans, Region II, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 404-997-4414, e-mail:

Carolyn.Evans@nrc.gov.

3 SUPPLEMENTARY INFORMATION:

The text of the Order is attached.

Dated at Atlanta, Georgia, this 1 st day of May 2014.

For the Nuclear Regulatory Commission.

__/RA/_ ____________________________________

Leonard D. Wert Deputy Regional Administrator for Operations 4 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

In the Matter of ) ) Docket No. 50-259, 50-260, 50-296 Tennessee Valley Authority ) License Nos. DPR-33, DPR-52, DPR-68 Browns Ferry Nuclear Plant )

Units 1, 2 and 3 ) EA-14-005

CONFIRMATORY ORDER

I Tennessee Valley Authority (TVA or Licensee) is the holder of License Nos. DPR-33, DPR-52, and DPR-68, issued by the U.S. Nuclear Regulatory Commission (NRC or Commission)

pursuant to 10 CFR Part 50 on December 20, 1973, June 28, 1974, and July 2, 1976, respectively. The licenses authorize the operation of the Browns Ferry Nuclear Plant (BFN),

Units 1, 2, and 3, in accordance with the conditions specified therein. The facility is located on

the Licensee's site in Athens, Alabama.

This Confirmatory Order is the result of an agreement reached during an alternative dispute

resolution (ADR) mediation session conducted on April 3, 2014.

II On February 14, 2014, the NRC issued Inspection Report 05000259, 260, 296/2013005 to TVA, (IR) which documented the identification of two apparent violations that were being considered

for escalated enforcement action in accordance with the NRC Enforcement Policy.

5 The first apparent violation involved two examples of TVA's submission of information that was not complete and accurate in all material respects, as required by 10 CFR 50.9, Completeness

and Accuracy of Information. The information contained in TVA's letters was inaccurate

because, contrary to their assertions, TVA's stated control room staffing levels were not

sufficient to implement certain fire response procedures and achieve safe shutdown on the

three-unit site during a postulated 10 CFR 50, Appendix R fire event.

The second apparent violation involved TVA's change to a license condition without submitting

an amendment request, as required by 10 CFR 50.

90, Amendment of License or Construction Permit at Request of Holder. In this case, from June 29, 2010, through October 30, 2013, the

licensee inappropriately changed the requirements for site staffing, incorporated as part of

license amendments 271, 300, and 259, without submission of a license amendment request.

The licensee's actions to amend staffing levels via a commitment change resulted in bypassing

the review and approval that would occur as part of the license amendment process.

III

On April 3, 2014, the NRC and TVA met in an ADR session mediated by a professional

mediator, arranged through Cornell University's Institute on Conflict Resolution. ADR is a

process in which a neutral mediator with no decision-making authority assists the parties in

reaching an agreement or resolving any differences regarding their dispute. This confirmatory

order is issued pursuant to the agreement reached during the ADR process. The elements of

the agreement consist of the following:

1. The NRC and TVA agreed that the issues described in NRC Inspection Report 6 05000259, 260, 296/2013005 represent violations of regulatory requirements. The violations are as follows:
a. 10 CFR 50.9(a) requires, in part, that information provided to the Commission by a licensee or information required by statute or by the Commission's regulations, orders or license conditions to be maintained by the licensee shall be complete

and accurate in all material respects.

Contrary to the above, TVA provided information to the Commission that was not

complete and accurate in all material respects as evidenced by the following two

examples:

In a letter dated June 29, 2010, TVA provided inaccurate information to the

NRC indicating that the minimum staffing levels stated in their licensing basis

were not required to achieve safe shutdown on the three-unit site during an

Appendix R fire event. TVA's letter stated, "TVA has assessed the number of

operators required to carry out the SSIs. The most demanding staffing is

required by 0-SSI-16, "Control Building Fire EL (elevation) 593 Through EL

617." The evaluation concludes that the minimum staffing of three USs (Unit

Supervisors), six ROs (Reactor Operators), and eight AUOs (Auxiliary Unit

Operators) is adequate for successful implementation of this SSI." This

information was inaccurate because the licensee needed an additional SRO (Senior Reactor Operator) to successfully implement 0-SSI-16.

In a letter dated November 30, 2011, TVA provided inaccurate information to

the NRC indicating that the minimum staffing levels stated in their licensing 7 basis were not required to achieve safe shutdown on the three-unit site during an Appendix R fire event. TVA's letter stated, "-Total staffing level is

one Shift Manager (SM), three Unit Supervisors (US), Six ROs, and eight AUOs. One of the US may be the STA (Shift Technical Advisor)

-" This statement was inaccurate because the minimum staffing levels stated in their

licensing basis were required to achieve safe shutdown on the three-unit site

during an 10 CFR 50, Appendix R fire event.

The above information was material to the NRC because it was reviewed by the

NRC staff to determine compliance with regulatory requirements.

b. 10 CFR 50.90 requires, in part, that whenever a holder of an operating license under this part desires to amend the license or permit, application for an

amendment must be filed with the Commission, as specified in 10 CFR 50.4, fully

describing the changes desired, and following as far as applicable, the form

prescribed for original applications.

Contrary to the above, from June 29, 2010 to October 30, 2013, the licensee

inappropriately amended the requirements of their license without filing an

application for an amendment as specified in 10 CRFR 50.4. Specifically, the

licensee inappropriately changed the requirements for site staffing incorporated as

part of license amendments 271, 300, and 259, without submission of a license

amendment request. The licensee's actions to amend staffing levels via a

commitment change resulted in bypassing the review and approval that would

occur as part of the license amendment process.

8 2. Based on TVA's review of the incident and NRC's concerns with respect to precluding recurrence of the violations, TVA agrees to implement and continue to implement

corrective actions and enhancements specified in Section V of this Confirmatory Order.

3. The NRC considers the corrective actions and enhancements discussed in Section V of this Confirmatory Order to be appropriate ly prompt and comprehensive to address the causes which gave rise to the incident discussed in the NRC's Inspection Report of

February 14, 2014.

4. Based on the corrective actions and enhancements described above, NRC will conduct follow-up inspections using NRC Manual Chapter Inspection Procedure 92702 to

confirm, among other things, the thoroughness and adequacy of the actions specified in

Section V of this Confirmatory Order. Close out inspection of the corrective actions

documented in this Confirmatory Order will make the need for additional follow up

inspection of the violations unnecessary.

5. The NRC and TVA agree that the above elements will be incorporated into issuance of a Confirmatory Order.
6. In consideration of the commitments delineated above and in Section V of this Confirmatory Order, the NRC agrees to refrain from proposing a civil penalty or issuing a Notice of Violation for all matters discussed in the NRC's IR to TVA of February 14, 2014 (EA-14-005).
7. This agreement is binding upon successors and assigns of TVA.

9 On April 25, 2014, TVA consented to issuance of this Order with the commitments, as described in Section V below. The Licensee further agreed that this Order is to be effective 30 days after

issuance and that it has waived its right to a hearing.

IV

Because the licensee has agreed to take additional actions to address NRC's concerns, as set

forth in Section V of this Confirmatory Order, the NRC has concluded that its concerns can be

resolved through issuance of this Confirmatory Order.

I find that TVA's commitments, as set forth in Section V, are acceptable and necessary and

conclude that with these commitments, the public health and safety are reasonably assured. In

view of the foregoing, I have determined that public health and safety requires that TVA's

commitments be confirmed by this Order. Based on the above and TVA's consent, this

Confirmatory Order is effective 30 days after issuance.

V

Accordingly, pursuant to Sections 104b., 161b., 161i., 161o., 182, and 186 of the Atomic Energy

Act of 1954, as amended, and the Commission's regulations in 10 CFR 2.202 and 10 CFR Parts

50, IT IS HEREBY ORDERED, THAT LICENSE NOS. DPR-33, DPR-52 AND DPR-68 ARE

MODIFIED AS FOLLOWS:

10 1. TVA agrees to implement, or continue to implement, the following corrective actions and enhancements:

a. Actions related to the violation of 10 CFR 50.9, Completeness and Accuracy of Information:
i. Fleet-wide:
1. By no later than September 1, 2014, TVA will revise and issue a fleet-wide procedure governing the preparation of information

intended to support licensing submittals to the NRC. The

procedure shall contain requirements for the preparation (including specifications for draft information), verification, and

management oversight of this information, and will delineate

acceptable validation documents. The procedure will include an

overt discussion of the roles and responsibilities for individuals

involved. BFN will provide training in accordance with the

procedure change process.

ii. BFN-specific:

1. By no later than May 23, 2014, TVA will design, develop, and implement a BFN Integrated Completeness and Accuracy Review

Evaluation Board (ICAREB). The ICAREB will be chartered to

provide pre-submittal reviews of correspondence and supporting

documentation for BFN licensing submittals to the NRC, including 11 those prepared by BFN staff and Corporate Nuclear. Specific criteria for dissolution of the ICAREB will be established, but it will

remain active, at a minimum, until a fleet-wide procedure

governing the preparation of information intended to support

licensing submittals to the NRC is active. 2. By no later than August 21, 2014, BFN Licensing will prepare a benchmarking report identifying industry best practices in the area

of 10 CFR 50.9 compliance in the preparation and validation of

inputs to NRC submittals. This report will be made available to

the NRC for review. BFN will consider benchmarking results, as

appropriate, for implementation.

b. Actions related to the violation of 10 CFR 50.90:
i. Fleet-wide:
1. By July 15, 2014, TVA will benchmark nuclear industry methodologies used to maintain Licensing Bases Documents. A

report on this activity will be made available to the NRC for review.

BFN will consider benchmarking results for implementation. 2. By no later than August 15, 2014, TVA will develop and issue a fleet-wide Licensing Compliance Review Procedure to establish

the process for verifying that changes to NPG administrative and

technical procedures not covered under the 10 CFR 50.59 review

process are reviewed for conformance to the current licensing

basis. BFN will provide training in accordance with the procedure 12 change process. 3. By no later than August 15, 2014, TVA will revise NPG-SPP-01.1 and NPG-SPP-01.2 to incorporate the Licensing Compliance

Review process, including verification of compliance. 4. By no later than September 26, 2014, TVA will convert NLDP-5 "FSAR Management" to an NPG Standard Programs and

Processes (SPP) procedure. BFN will provide training in

accordance with the procedure change process. 5. By no later than June 13, 2014, TVA will implement, via an independent entity, a review of the 10 CFR 50.9 and 10 CFR

50.90 Root Cause Analysis reports to assess the completeness

and adequacy of the identified root/contributing causes, extent of

cause, extent of condition and CAPRs/CAs. The deliverable from

this review will be a report with documented recommendations.

TVA will consider these recommendations for implementation. 6. By no later than July 15, 2015, TVA will implement, via an independent entity, an effectiveness review of the corrective

actions completed to date with regard to the 10 CFR 50.9 and 10

CFR 50.90 Root Cause Analyses.

ii. BFN-specific:

1. TVA completed a snapshot self-assessment to verify if commitments are being implemented accurately on March 25, 2014. 2. TVA acknowledges that there have been previous instances 13 where repetitive PERs were submitted on the issue of adequate staffing and the issue was ineffectively resolved. BFN commits to

close the CAP Fundamental Problem that was identified under the

95003 that resulted in significant programmatic and organizational

changes in TVA's CAP by no later than April 9, 2014. In addition, the NRC recently closed the 95003 Tier 1 CAL Commitment in the

BFN CAP. 3. By no later than May 2, 2014, TVA will develop and implement an Interim Licensing Compliance Review Checklist for use by

procedure writing organizations and document reviewers to

ensure the correct licensing basis documents are referenced

when revising procedures. This Interim Licensing Compliance

Review Checklist will be used until issuance of a revised Licensing

Compliance Review Procedure. (b.i.2 Fleet-wide action above). 4. By no later than November 26, 2014, TVA will perform a detailed review of all procedures revised prior to August 15, 2014, during

the Procedure Upgrade Project to ensure that the licensing basis

information required by the revised SPP-01.1 and SPP-01.2 is

identified. This review will include all licensing, administrative and

governance procedures. The revised procedures will

institutionalize the licensing review process and provide

sustainability from that point forward in the Procedure Upgrade

Project. 5. By no later than November 28, 2014, TVA will complete training of BFN Engineering, Licensing and licensed Operators regarding the

scope and hierarchy of licensing basis documents, lessons 14 learned from circumstances associated with EA-14-005, and the associated change process. The training material will be available

for NRC review. 6. Through December 31, 2014, changes to BFN licensing commitments will be reviewed and approved by a second site

licensing engineer in addition to review and approval by site

licensing. The focus of this additional review will be to ensure that

the correct regulatory change process(es) has/have been used.

This action will be discontinued upon completion of the training

encompassed in item 5 above. 7. By December 31, 2015, TVA will review a sample of facility changes, based on plant risk and complexity, that have occurred

from 2004 to May 2014, to determine whether these changes

have been appropriately incorporated into the licensing basis

documents. TVA's method of selecting facility changes to be

sampled will be provided to the NRC by July 15, 2014. Any

identified discrepancies will be dispositioned through the

corrective action process. The results of this review will be made

available to the NRC. 8. By December 31, 2015, TVA will review a sample of BFN facility changes, based on plant risk and complexity, accomplished within

the last 3 years and processed outside of the 10 CFR 50.59

process to determine whether these changes have been

appropriately incorporated into the licensing basis documents.

TVA's method of selecting facility changes to be sampled will be

provided to the NRC by July 15, 2014. Any identified 15 discrepancies will be dispositioned through the corrective action process. The results of this review will be made available to the

NRC. 9. By December 31, 2014, TVA will make a presentation to the 1)

Regulatory Issue Working Group and 2) the Regulating Utility

Group regarding the circumstances of the violations discussed

above and the importance of leadership attention to the effective

management of the current licensing basis and complete and

accurate communications with the NRC. The presentation will be

made available to the NRC in advance.

c. Prior to July 15, 2014, TVA will perform, via an independent entity, a reevaluation of Operations minimum shift staffing. The results of that staffing evaluation will

be documented as a reference to OPDP-1, "Conduct of Operations."

d. Upon completion of the terms of items of the Confirmatory Order, TVA will provide the NRC with a letter discussing its basis for concluding that the Order

has been satisfied.

The Regional Administrator, NRC Region II, may relax or rescind, in writing, any of the above

conditions upon a showing by TVA of good cause.

VI Any person adversely affected by this Order, other than TVA, may submit a written answer

and/or request a hearing on this Order within 30 days from the date of this Order, pursuant to 10 16 CFR 2.302 and 10 CFR 2.309. Where good cause is shown, consideration will be given to extending the time to answer or request a hearing. A request for extension of time must be

directed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and include a statement of good cause for the extension.

If a hearing is requested by a person whose interest is adversely affected, the Commission will, if appropriate, issue an Order designating the time and place of any hearings. If a hearing is

held, the issue to be considered at such hearing shall be whether this Order should be

sustained.

All documents filed in the NRC adjudicatory proceedings, including a request for a hearing, a

petition for leave to intervene, any motion or other document filed in the proceeding prior to the

submission of a request for hearing or petition to intervene, and documents filed by interested

governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the

NRC's E-Filing rule at 10 CFR 2.302. The E-Filing process requires participants to submit and

serve all adjudicatory documents over the interne t, or to physically deliver or mail a copy of documents on optical storage media. Participants may not submit paper copies of their filings

unless they seek and receive an exemption in accordance with the procedures described below.

To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing

deadline, the participant should contact the Office of the Secretary by e-mail at

hearing.docket@nrc.gov , or by telephone at (301) 415-1677, to request (1) a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to

digitally sign documents and access the E-Submitta l server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or

petition for hearing (even in instances in which the participant, or its counsel or representative, 17 already holds an NRC-issued digital certificate). Based on this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already

established an electronic docket.

Information about applying for a digital ID certificate is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/getting-started.html

. System requirements for accessing the E-Submittal server are detailed in the NRC's "Guidance for Electronic

Submission," which is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. Participants may attempt to use other software not listed on the Web site, but should note that the NRC's E-Filing system does not support unlisted software, and the NRC

Meta System Help Desk will not be able to offer assistance in using unlisted software.

If a participant is electronically submitting a document to the NRC in accordance with the

E-Filing rule, the participant must file the document using the NRC's online, Web-based

submission form. In order to serve docum ents through the Electronic Information Exchange System, users will be required to install a W eb browser plug-in obtained from the NRC's Web site. Further information on the Web-based submission form, including the installation of the

Web browser plug-in, is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.

Once a participant has obtained a digital ID certificate and a docket has been created, the

participant can then submit a request for a hearing or petition for leave to intervene.

Submissions should be in Portable Document Format (PDF) in accordance with the NRC

guidance available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the documents are submitted through the NRC's E-Filing system. To be timely, an electronic filing must be submitted to the 18 E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail

notice confirming receipt of the document. The E-Filing system also distributes an e-mail notice

that provides access to the document to t he NRC's Office of the General Counsel, and any others who have advised the Office of the Secretary that they wish to participate in the

proceeding, so that the filer need not serve the document on those participants separately.

Therefore, applicants and other participants (or their counsel or representative) must apply for

and receive a digital ID certificate before a hearing request/petition to intervene is filed so that

they can obtain access to the document via the E-Filing system.

A person filing electronically using the NRC's adjudicatory E-Filing system may seek assistance

by contracting the NRC Meta System Help Desk thorough the "Contact Us" link located on the

NRC's public Web site at http://www.nrc/gov/site-help/e-submittals.html , by e-mail to MSHD.Resource@nrc.gov , or by a toll free call to 1- 866-672-7640. The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays.

Participants who believe that they have a good cause for not submitting documents

electronically must file an extension request, in accordance with 10 CFR 2.302(g), with their

initial paper filing requesting authorization to continue to submit documents in paper format.

Such filings must be submitted by: (1) first-class mail addressed to the Office of the Secretary

of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited

delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications

Staff. Participants filing a document in this manner are responsible for serving the document on 19 all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service.

A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing, if the presiding

officer subsequently determines the reason for the exemption from use of E-Filing no longer

exists.

Documents submitted in adjudicatory proceedings will appear in the NRC's electronic hearing

docket, which is available to the public at http://ehd1.nrc.gov/ehd , unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include

personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such

information. With respect to copyrighted wor ks, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are

requested not to include copyrighted materials in their submissions.

If a person other than the licensee requests a hearing, that person shall set forth with

particularity the manner in which his/her interest is adversely affected by this Order and shall address the criteria set forth in 10 CFR 2.309(d) and (f).

In the absence of any request for hearing, or written approval of an extension of time in which to

request a hearing, the provisions specified in Section V above shall be final 30 days from the

date of this Order without further order or proceedings. If an extension of time for requesting a

hearing has been approved, the provisions specified in Section V shall be final when the

extension expires if a hearing request has not been received.

20 FOR THE NUCLEAR REGULATORY COMMISSION

__/RA/_________________________________________

Leonard D. Wert

Deputy Regional Administrator for Operations

Dated this 1 st day of May 2014.