NRC-2006-0092, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors
| ML063560109 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 12/21/2006 |
| From: | Koehl D Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-04-002, NRC-2006-0092 | |
| Download: ML063560109 (1) | |
Text
Operated by Nuclear Management Company, LLC December 21, 2006 NRC 2006-0092 G L-2004-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , DC 20555-0001 Point Beach Nuclear Plant Units 1 and 2 Docket Nos. 50-266 and 50-301 License Nos. DPR -24 and DPR-27 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors References : 1. Letter from NRC to NMC dated February 9, 2006
- 2. Letter from NRC to PWR Licensees dated March 28, 2006
- 3. Letter from NMC to NRC dated October 3, 2006 ( NRC 2006-0077)
- 4. Letter from NRC to Nuclear Energy Institute dated November 14, 2006 On February 9, 2006, the NRC issued a Request for Additional Information (RAI )
associated with NMC response to GL 2004 - 02 (Reference 1). In accordance with the March 28, 2006 , letter from the NRC to PWR Licensees ( Reference 2 ), NMC deferred submittal of the final design information . In accordance with the October 3, 2006 , letter from NMC to the NRC ( Reference 3 ), NMC committed to submit by the end of 2006 for Unit 2 and by the end of 2007 for Unit 1.
In accordance with subsequent NRC guidance provided in Reference 4 and as discussed with Mr. F . Lyon of the NRC staff on December 6, 2006 , the response committed to in Reference 3 will be submitted by the end of 2007 for Units 1 and 2.
Summary of Commitments This letter revises the commitment date for submitting supplemental information in response to NRC GL 2004 - 0? per the guidance contained in Reference 4.
Dennis L. Koehl Site Vice- President, Point Beach Nuclear Plant Nuclear Management Company, LLC cc: Administrator , Region III, USNRC Project Manager , Point Beach Nuclear Plant, USNRC Resident Inspector , Point Beach Nuclear Plant, USNRC
Text
Operated by Nuclear Management Company, LLC December 21, 2006 NRC 2006-0092 G L-2004-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , DC 20555-0001 Point Beach Nuclear Plant Units 1 and 2 Docket Nos. 50-266 and 50-301 License Nos. DPR -24 and DPR-27 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors References : 1. Letter from NRC to NMC dated February 9, 2006
- 2. Letter from NRC to PWR Licensees dated March 28, 2006
- 3. Letter from NMC to NRC dated October 3, 2006 ( NRC 2006-0077)
- 4. Letter from NRC to Nuclear Energy Institute dated November 14, 2006 On February 9, 2006, the NRC issued a Request for Additional Information (RAI )
associated with NMC response to GL 2004 - 02 (Reference 1). In accordance with the March 28, 2006 , letter from the NRC to PWR Licensees ( Reference 2 ), NMC deferred submittal of the final design information . In accordance with the October 3, 2006 , letter from NMC to the NRC ( Reference 3 ), NMC committed to submit by the end of 2006 for Unit 2 and by the end of 2007 for Unit 1.
In accordance with subsequent NRC guidance provided in Reference 4 and as discussed with Mr. F . Lyon of the NRC staff on December 6, 2006 , the response committed to in Reference 3 will be submitted by the end of 2007 for Units 1 and 2.
Summary of Commitments This letter revises the commitment date for submitting supplemental information in response to NRC GL 2004 - 0? per the guidance contained in Reference 4.
Dennis L. Koehl Site Vice- President, Point Beach Nuclear Plant Nuclear Management Company, LLC cc: Administrator , Region III, USNRC Project Manager , Point Beach Nuclear Plant, USNRC Resident Inspector , Point Beach Nuclear Plant, USNRC