NRC-16-0054, Submittal of Preparation and Scheduling of Operator Licensing Examinations Response - NRC Form 536
| ML16243A429 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 08/30/2016 |
| From: | Polson K DTE Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-16-0054, RIS-16-09 | |
| Download: ML16243A429 (3) | |
Text
Keith J. Poison Site Vice President DTE Energy Conpany 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4849 ax: 734.586.4172 Email: poisonk@dteenergy.con RIS 2016-09 August 30, 2016 NRC-16-0054 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Reference:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Preparation and Scheduling of Operator Licensing Examinations Attached is a completed NRC Form 536 for Fermi 2. This form is being submitted in response to NRC Regulatory Issue Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations," and represents the current plan for operator licensing needs. Fermi 2 will support Region III to levelize examiner workload and provide mutually agreeable exam schedules through 2020. Fermi 2 intends to prepare all license operator examinations during this period.
No new commitments are made in this letter.
Should you have any questions, please contact Mr. Bryan Crone, General Supervisor
- Operations Training, at 734-586-4173.
Sincerely, Keith. Polson Site Vice President Nuclear Generation
Enclosure:
NRC Form 536, "Operator Licensing Examination Data" cc:
NRC Project Manager NRC Regional Administrator, Region III NRC Resident Office Reactor Projects Chief, Branch 5, Region III Michigan Public Service Commission Regulated Energy Division (kindsch1(michigan.gov)
Enclosure to NRC-16-0054 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 NRC Form 536 Operator Licensing Examination Data
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2017 (05-2016)
G RE.
Estimated burden per response to comply with this voluntary information collection request i hour. This 50 e ro information collection is used to plan budgets and resources for operator examinations.
Send OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to
(
EXAMINA TION DATA Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131),
Office of Management and Budget, Washington, DC 20503.
If a means
- aused to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Fermi 2 NRC Docket No. 50-341 Region III NRC License No. NPF-43 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY 2018 CY 2019 CY 2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 NUMBER OF REACTOR OPERATORS 5
4 13 4
NUMBER OF SENIOR REACTOR 3
2 3
4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0
2 2
2 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 03/20/2017 01/08/2018 01/21/2019 12/14/2020 ALTERNATE DATE N/A 01/15/2018 01/28/2019 01/11/2021 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED Cy 2018 CY 2019 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 16 0
0 8
CANDIDATES NRC FORM 536 (05-2016)