NRC-13-0014, Submittal of Corrected Page for License Amendment Request for Measurement Uncertainty Recapture (MUR) Power Uprate
| ML13070A197 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/08/2013 |
| From: | Conner J DTE Electric Company, DTE Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-13-0014 | |
| Download: ML13070A197 (5) | |
Text
J. Todd Conner Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4849 Fax: 734.586.5295 Email: connerj@dteenergy.com DTE Energy 10 CFR 50.90 March 8, 2013 NRC-13-0014 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
- 2) DTE Electric Company Letter to NRC, "License Amendment Request for Measurement Uncertainty Recapture (MUR) Power Uprate," NRC-13-0004, dated February 7, 2013 (ML13043A659)
Subject:
Submittal of Corrected Page for License Amendment Request for Measurement Uncertainty Recapture (MUR) Power Uprate In Reference 2, DTE Electric Company (DTE) submitted a license amendment request for Measurement Uncertainty Recapture (MUR) power uprate for Fermi 2.
Pursuant to submitting Reference 2, it was discovered that part of the text on page 2 of the submitted cover letter was inadvertently left out. The enclosed page with this letter replaces page 2 of the cover letter in Reference 2.
Should you have any questions or require additional information, please contact Mr.
Zachary W. Rad of my staff at (734) 586-5076.
Sincerely, Enclosure
USNRC NRC-13-0004 Page 2 cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III Supervisor, Electric Operators, Michigan Public Service Commission
USNRC NRC-13-0004 Page 3 I, J. Todd Conner, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
J. Todd Conner Site Vice President Nuclear Generation On this day of _
,2013 before me personally appeared J. Todd Conner, being first duly sworn and says that he executed the foregoing as his free act and deed.
Notary Public SHARON S. MARSHALL NOTARY PUBLIC, STATE OF ML COUNTY OF MONROE MY COMMISSION EXPIRES Jun 14, 2013 ACTING IN COUNTY OF /{o ot
Enclosure to NRC-13-0014 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Submittal of Corrected Page for License Amendment Request for Measurement Uncertainty Recapture (MUR) Power Uprate Corrected Page 2 of Cover Letter of NRC-13-0004
USNRC NRC-13-0004 Page 2 The proposed changes also modify the TS Average Power Range Monitors Simulated Thermal Power - Upscale trip setpoints and add requirements to assess channel performance during testing that verifies instrument channel setting values established by the plant specific setpoint methodologies.
- Enclosure 1 provides a description and evaluation of the proposed changes.
" provides the marked up pages of existing Operating License and TS to show the proposed changes.
- Enclosure 3 provides a markup of the existing Technical Requirements Manual (TRM) and TS Bases to show the proposed changes. These pages are provided for information only and do not require NRC approval.
- provides the revised (clean) Operating License and TS pages.
- provides a cross reference between the contents of this request and RIS 2002-03 (Reference 2).
- provides a summary of the regulatory commitments made in this request.
" provides the General Electric-Hitachi (GEH) Nuclear Energy document NEDC-33578P, "Safety Analysis Report for Fermi Generating Station Unit 2 Thermal Power Optimization," (Proprietary Version).
" provides affidavits from GEH Nuclear Energy and the Electric Power Research Institute (EPRI) supporting the withholding of information in Enclosure 7 from public disclosure.
" provides the General Electric-Hitachi (GEH) Nuclear Energy document NEDO-33578, "Safety Analysis Report for Fermi Generating Station Unit 2 Thermal Power Optimization," (Non-Proprietary Version).
" 0 provides Cameron document ER-781, Revision 2, "Bounding Uncertainty Analysis for Thermal Power Determination at Fermi Unit 2 Nuclear Generating Station Using the LEFM J + System," (Proprietary Version).
" 1 provides Cameron document ER-818, Revision 0, "Meter Factor Calculation and Accuracy Assessment for Fermi Unit 2," (Proprietary Version).
" 2 provides affidavits from Cameron International Corporation supporting withholding of information in Enclosures 10 and 11 from public disclosure.
" 3 provides Fermi 2 calculation DC-6443, Volume I DCD 1, Revision A, "Reactor Core Thermal Power Uncertainty with Feedwater Flow Measured by LEFM CheckPlus C System."
" 4 provides Fermi 2 calculation DC-4608, Volume I DCD 1, Revision 0, "NUMAC Power Range Neutron Monitoring System (PRNM) Surveillance Validation," addressing the Average Power Range Monitors Simulated Thermal Power - Upscale trip setpoint revisions.
" 5 provides drawings describing the installation of the LEFM.