Joseph H. Plona Site Vice President 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.5910 Fax: 734.586.4172 DTE Energy, 10CFR50.90 10CFR50.82(a)(9)
August 27, 2009 NRC-09-0046 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555
Reference:
Enrico Fermi Atomic Power Plant, Unit 1 NRC Docket No. 50.16 NRC License No. DPR-9
Subject:
Modelinm Scenarios for Fermi 1 License Termination Plan Criteria On 15 July, 2009, Detroit Edison participated in a conference call with the NRC regarding the submitted Fermi 1 License Termination Plan.
NRC representatives asked that the RESRAD and RESRAD-BUILD reports be docketed.
Attached are four sets of reports consisting of: 1) Building Sensitivity reports, 2) Soil Sensitivity reports, 3) Building DCGL reports, and 4) Soil DCGL reports.
Should you have any questions, please contact Lynne Goodman, Manager, Fermi 1 at (734)586-1205 Sincerely,,,,
Joseph H. Plona Site Vice President, Nuclear Generation JHP/LG/ljd Attachments (4) cc: NRC Regional Administrator, Region III w/o attachments T. Smith, NRC (Washington, D.C.) w/electronic attachment NRC Resident Inspector-Fermi 2 w/o attachments P. Lee, NRC Region III w/o attachments T. Strong (Michigan Dept. of Environmental Quality) w/o attachments