NRC-09-0038, Re-issuance of Letter to Correct Date for Fermi 2, Summary Report of the 2009, Inservice Inspection Summary Report
| ML092240081 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/23/2009 |
| From: | Plona J DTE Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-09-0038 | |
| Download: ML092240081 (1) | |
Text
Joseph H. Plona Site Vice President 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.5910 Fam: 734.586.4172 DTE Energy-10O`FR 50.55a 2009 July 23, 2008 (This letter is re-issued without the enclosure to correct the date.)
NRC-09-0038 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
Reference:
Subject:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 Inservice Inspection Summary Report Enclosed is the Summary Report of the 2009 Inservice Inspection (IS]) activities performed at Detroit Edison Company's Fermi 2 Nuclear Power Plant. This report represents a summary of the ISI activities for the Second Ten-Year Inspection Interval beginning February 17, 2000 through the Thirteenth Refueling Outage, which was completed on May 1, 2009.
This report is being submitted in accordance with ASME Section XI, 1989 Edition, paragraph IWA-6230, for IWB, IWC, IWD, and IWF inspections, and the 1992 Edition, including the 1992 Addenda, for IWE inspections.
Should you have any questions or require additional information, please contact Mr. Rodney W. Johnson, Manager - Nuclear Licensing, at (734) 586-5076.
Sincerely, Enclosure cc:
NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 4, Region Ell Regional Administrator, Region mI M. Wilson - ANII Supervisor, Electric Operators, Michigan Public Service Commission R. J. Aben Jr. - Chief Inspector Michigan Department of Labor & Economic Growth Bureau of Construction Codes and Fire Safety - Boiler Division A46c/