W\\illiam T. O'Connor, Jr.
Vice President, Nuclear Generation Fermi 2 6400 North Dixie 1liy., Newport, Michigan 48166 Tel: 734-586-5201 Fax: 734-5864172 DTE Energy-June 28, 2005 NRC-05-0018 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
- 2) Letter from S. J. Collins (NRC) to W. T. O'Connor, Jr.
(Detroit Edison) dated April 29, 2003, "Issuance of Order Requiring Compliance with the Revised Design Basis Threat for Operating Power Reactors," EA-03-086-
Subject:
Confirmation of Implementation of Order EA-03-086 The Commission issued Order EA-03-086 (Reference 2) ("Order") to Detroit Edison for Fermi Unit 2 on April 29, 2003.Section III.A.2 of the Order required that Detroit Edison complete implementation of the revised physical security, safeguards contingency, and security training and qualification plans by October 29, 2004.
Section III.C of the Order required that Detroit Edison report to the Commission when it had fully implemented the approved revisions to these plans to protect against the Design Basis Threat (DBT) described in Attachment 2 to the Order.
Detroit Edison hereby certifies that the requirements contained in Attachment 2 to the Order were completely implemented as of October 29, 2004. Detroit Edison notified the NRC Project Manager, NRC Region III, and the NRC Resident Inspector verbally of our compliance with the Order on October 29, 2004. However, as agreed by the NRC staff through negotiations with the Nuclear Energy Institute (NEI), this written Confirmation of Implementation has been delayed until receipt of the corrected Safety Evaluation and License Condition for the revised Fermi 2 physical security, safeguards contingency, and security training and qualification plans. The final corrections were received on June 27, 2005.
USNRC NRC-05-001 8 Page 2 If there are any questions regarding this response, please contact Mr. Norman K.
Peterson, Manager, Nuclear Licensing at (734) 586-4258.
Sincerely, cc:
D. P. Beaulieu G. M. Tracy NRC Resident Office Regional Administrator, Region III
USNRC NRC-05-001 8 Page 3 I, WILLIAM T. O'CONNOR, JR., do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
WILLIAM T. O'CONNOR R
Vice President - Nuclea G
n On this day of Zke 2005 before me personally appeared William T. O'Connor, Jr., being first duly sworn and says that he executed the foregoing as his free act and deed.
t.
on
-*,^
- WE_,
=-
Ntr P Notary Public
- rS Oct. 5. 2Oi~5