NRC-04-0041, May 2004 Monthly Operating Report for Fermi 2

From kanterella
Jump to navigation Jump to search
May 2004 Monthly Operating Report for Fermi 2
ML041680373
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/09/2004
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC-04-0041
Download: ML041680373 (2)


Text

Fermi 2 6400 North Dixie Hwy., Newport, Ml 48166 Detroit Edison Generic Letter 97-02 June 9, 2004 NRC-04-0041 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for May 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region m Region m A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE June 9, 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: May 2004

1. Design Electrical Rating (MWe-Net) 1,150.00
2. Maximum Dependable Capacity (Mwe-Net) 1,089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 744 3,647 111,543
4. Number of Hours Generator On-line 744 3,647 107,656
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 819,978 4,028,435 108,652,003 UNIT SHUTDOWVNS

SUMMARY

The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On May 15, 2004, at 0735 hours0.00851 days <br />0.204 hours <br />0.00122 weeks <br />2.796675e-4 months <br />, power was reduced from 100% to 93% due to High Pressure Stop Valve No. 2 closure. Return to full power was completed at 1828 hours0.0212 days <br />0.508 hours <br />0.00302 weeks <br />6.95554e-4 months <br />. On May 30, 2004, at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br />, power was reduced from 100% to 93%

for control rod pattern adjustment. Return to full power was completed at 1633 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.213565e-4 months <br />.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Text

Fermi 2 6400 North Dixie Hwy., Newport, Ml 48166 Detroit Edison Generic Letter 97-02 June 9, 2004 NRC-04-0041 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for May 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region m Region m A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE June 9, 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: May 2004

1. Design Electrical Rating (MWe-Net) 1,150.00
2. Maximum Dependable Capacity (Mwe-Net) 1,089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 744 3,647 111,543
4. Number of Hours Generator On-line 744 3,647 107,656
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 819,978 4,028,435 108,652,003 UNIT SHUTDOWVNS

SUMMARY

The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On May 15, 2004, at 0735 hours0.00851 days <br />0.204 hours <br />0.00122 weeks <br />2.796675e-4 months <br />, power was reduced from 100% to 93% due to High Pressure Stop Valve No. 2 closure. Return to full power was completed at 1828 hours0.0212 days <br />0.508 hours <br />0.00302 weeks <br />6.95554e-4 months <br />. On May 30, 2004, at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br />, power was reduced from 100% to 93%

for control rod pattern adjustment. Return to full power was completed at 1633 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.213565e-4 months <br />.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)