Fermi 2 6400 North Dixie Hwy., Newport, Ml 48166 Detroit Edison Generic Letter 97-02 June 9, 2004 NRC-04-0041 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for May 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region m Region m A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE June 9, 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: May 2004
- 1. Design Electrical Rating (MWe-Net) 1,150.00
- 2. Maximum Dependable Capacity (Mwe-Net) 1,089.00 This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 744 3,647 111,543
- 4. Number of Hours Generator On-line 744 3,647 107,656
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 819,978 4,028,435 108,652,003 UNIT SHUTDOWVNS
SUMMARY
- The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On May 15, 2004, at 0735 hours0.00851 days <br />0.204 hours <br />0.00122 weeks <br />2.796675e-4 months <br />, power was reduced from 100% to 93% due to High Pressure Stop Valve No. 2 closure. Return to full power was completed at 1828 hours0.0212 days <br />0.508 hours <br />0.00302 weeks <br />6.95554e-4 months <br />. On May 30, 2004, at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br />, power was reduced from 100% to 93%
for control rod pattern adjustment. Return to full power was completed at 1633 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.213565e-4 months <br />.
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Text
Fermi 2 6400 North Dixie Hwy., Newport, Ml 48166 Detroit Edison Generic Letter 97-02 June 9, 2004 NRC-04-0041 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for May 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region m Region m A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE June 9, 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: May 2004
- 1. Design Electrical Rating (MWe-Net) 1,150.00
- 2. Maximum Dependable Capacity (Mwe-Net) 1,089.00 This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 744 3,647 111,543
- 4. Number of Hours Generator On-line 744 3,647 107,656
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 819,978 4,028,435 108,652,003 UNIT SHUTDOWVNS
SUMMARY
- The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On May 15, 2004, at 0735 hours0.00851 days <br />0.204 hours <br />0.00122 weeks <br />2.796675e-4 months <br />, power was reduced from 100% to 93% due to High Pressure Stop Valve No. 2 closure. Return to full power was completed at 1828 hours0.0212 days <br />0.508 hours <br />0.00302 weeks <br />6.95554e-4 months <br />. On May 30, 2004, at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br />, power was reduced from 100% to 93%
for control rod pattern adjustment. Return to full power was completed at 1633 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.213565e-4 months <br />.
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)