NRC-04-0013, January 2004 Monthly Operating Report for Fermi 2

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Fermi 2
ML040490561
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/09/2004
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC-04-0013
Download: ML040490561 (2)


Text

Fermi 2 6400 North DMxie H~wy., Newport, MI 48166 Detroit Edison Generic Letter 97-02 February 9, 2004 NRC-04-0013 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for January 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for January 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

I' Sicrely Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

H. K. Chernoff M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region III Region III A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE February 9. 2004 COMPLETED BY Kevin Burke TELEPHONE o(734) 586-5148 REPORTING PERIOD: January 2004

1. Design Electrical Rating (MWe-Net) 1,150.00
2. Maximum Dependable Capacity (Mwe-Net) 1 .089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 744 744 140,462
4. Number of Hours Generator On-line 744 744 104.753
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MW" 806.625 806.625 105,430.192 UNIT SHUTDOWNS No. Date Type Duration Reason (I) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments N/A

SUMMARY

On January 28, 2004, reactor power was reduced to 55 percent to address oil leaks on Main Turbine Generator. Leakage was caused by failure of oil reservoir vapor extractors. The unit was returned to full power on January 31, 2004.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Text

Fermi 2 6400 North DMxie H~wy., Newport, MI 48166 Detroit Edison Generic Letter 97-02 February 9, 2004 NRC-04-0013 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for January 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for January 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

I' Sicrely Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

H. K. Chernoff M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region III Region III A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE February 9. 2004 COMPLETED BY Kevin Burke TELEPHONE o(734) 586-5148 REPORTING PERIOD: January 2004

1. Design Electrical Rating (MWe-Net) 1,150.00
2. Maximum Dependable Capacity (Mwe-Net) 1 .089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 744 744 140,462
4. Number of Hours Generator On-line 744 744 104.753
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MW" 806.625 806.625 105,430.192 UNIT SHUTDOWNS No. Date Type Duration Reason (I) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments N/A

SUMMARY

On January 28, 2004, reactor power was reduced to 55 percent to address oil leaks on Main Turbine Generator. Leakage was caused by failure of oil reservoir vapor extractors. The unit was returned to full power on January 31, 2004.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)