NRC-02-0065, Semi-Annual Fitness for Duty Report

From kanterella
Jump to navigation Jump to search
Semi-Annual Fitness for Duty Report
ML022390504
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/20/2002
From: O'Connor W
DTE Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-0065
Download: ML022390504 (4)


Text

William T. O'Connor, Jr.

Vice President, Nuclear Generation Fermi 2 6400 North Dixie Ihvy., Newport, Michigan 48166 Tel: 734-586-5201 Fax: 734-586-4172 DTE Energy 10CFR26.71(d)

August 20, 2002 NRC-02-0065 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Semi-Annual Fitness for Duty Report In accordance with 10CFR26.71 (d), enclosed is the Semi-Annual Fitness for Duty (FFD) Report for Fermi 2 for the report period from January 1, 2002 to June 30, 2002.

Should you have any questions or require additional information, please contact Mr.

Joseph H. Korte, Manager - Nuclear Security, at (734) 586-1095.

Sincerely, "

ua*)<Z Enclosure cc: J. E. Dyer M. A. Ring T. J. Kim G. L. Pirtle NRC Resident Office Region III 4001

  • k Enclosure to NRC-02-0065 Page 1 of 3 L Fitness for Duty Programi Performance Data Personnel Subiect to 10CFR26 THE DETROIT EDISON COMPANY June 30, 2002 Company 6 Month Ending FERMI 2 Location JOSEPH H. KORTE (734) 586-1095 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation rMAppendix A to 10CFR26 (ng/ml)

Marijuana Amphetamines /

Cocaine Phencyclidine ,_ /

Opiates Alcohol (% BAC) /

Long-Term Short-Term Testing Results Licensee Employees Contractor Contractor Personnel Personnel Average Number with Unescorted Access 959 0 331 Categories Tested Positive Tested Positive Tested Positive Pre-Access 97 0 0 0- 143 2 For Post accident 0 0 0 0 0 0 Cause Observed behavior 19 0 0 0 14 0 Random 277 0 0 0 153 0 Follow-up 30 0 0 0 6 0 Other 0 0 0 0 0 0 Total 423 0 0 0 316 2

Enclosure to NRC-02-0065 Page 2 of 3 Breakdown of Confirmed Positive Tests for Specific Substances I- F r F I r r Marijuana Cocaine Opiates Amphe Phency Alcohol Refusal.

tamines clidine to Test I 2 3 4 5 Licensee Employees 0 0 0 0 0 0 0 Long-Term Contractors 0 0 0 0 0 0 0 Short-Term Contractors 1 0 0 0 0 I 0 A 4 4 1 4 1 4 1 -t 4 + I I ¶ "*'

Total I o 0 0 0 0 2 Total 1 0 0 0 0 0 2

..I - I Enclosure to NRC-02-0065 Page 3 of 3 SECTION 3 T

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA

1) The Fermi 2 annualized testing rate in the Random Test Program for this reporting period was 59 percent (average pool size was 1469, total tested was 430). All individuals reporting to the Fermi Energy Center are in the Random Testing Program.
2) Detroit Edison does not have an on-site testing facility but transports specimens to a laboratory certified by the Department of Health and Human Services.

REPORTS MADE UNDER 10CFR26.73 There were no reports made under 10CFR26.73.

TESTING RESULTS There were two individuals who tested positive for the six-month period ending June 30, 2002. The positive tests were categorized as follows:

Pre-Access Testing Two contract employees tested positive. One tested positive for marijuana and one tested positive for alcohol. Both individuals were denied access.

For-Cause Testing There were no positive tests in this category during this six-month period.

Random Testing There were no positive tests in this category during this six-month period.

Follow-Up Testing There were no positive-tests in this category during this six-month period.

SUMMARY

OF MANAGEMENT ACTIONS There was one appeal received during this six-month period. The appeal is still in the review process and has not been ruled upon.

There were no Condition Assessment Resolution Documents (CARDs) written identifying deficiencies in the Fitness For Duty Program during this six-month period.